This document contains questions and answers regarding federal contract opportunity number W50S8Y23Q0004 for a high density vertical carousel storage system. The Oregon Army National Guard is seeking to install six carousels at their facility approximately 0.15 miles from the entrance with 50 feet between the bay doors and installation point. The ingress point has an elevated dock and the bay doors are 12 feet high and 11 feet wide. The government will be responsible for running power and making the final electrical connection to the carousels. Funding is currently available for the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W50S8Y-23-Q-0004 Consolidated Questions and Answers

Question: What are the slab details at the installation site at your facility?

Answer: Concrete, the previous Carousel units were bolted into the floor.

Question: How far is the installation location away from the facility's ingress point?

Answer: Installation location is 0.15 mile from base entrance and 50' from the bay doors to installation point

Question: What type and size of door is available for ingress?

Answer: Bay doors, Height 12 Feet Width 11 feet

Question: Is ingress at grade, elevated dock door, or via ramp?

Answer: Ingress has elevated dock.

Question: Electrical SOW is not listed; is the government responsible for pulling power to and final power connection to the (6) carousels?

Answer: Electrical/Power will be handled by Government CE.

Question: Is the solicitation funded or on the unfunded list?

Answer: Funding is currently available for the project.