This is a Questions and Answers document for federal contract opportunity W50S8V-26-Q-0004 regarding pneumatic compressor installation services at the 167th Airlift Wing, Shepherd Field, Martinsburg, West Virginia.

The contractor must remove and replace a 75 horsepower direct-driven rotary screw air compressor operating at 460 volts, along with installing a new government-provided air dryer. Both the compressor and dryer must be located on the second floor of a maintenance hangar. The new compressor must include an internal or external air dryer with pre and post filters and new zero-loss drains, sized to industry standard specifications for a 75hp compressor at 3-phase 460-volt power. The contractor is responsible for all management, tools, supplies, equipment, and labor necessary for the complete installation, including electrical work, piping, ductwork, and rigging. The contractor must disconnect old ductwork and reconnect new or existing ductwork; if old ductwork cannot be salvaged, new ductwork must be installed. Removal of the old compressor and two dryers from the work site must comply with all state and federal regulations. The contractor must conform to AFOSH and OSHA standards. Since the delivery dock and compressor room are on different floors, equipment will likely require a telehandler and rigging team for installation on the second floor. Supporting photographs depict the maintenance hangar exterior, delivery entrance, existing compressor and dryer equipment, and the enclosure housing for the compressor system.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W50S8V-26-Q-0004

167th Pneumatic Compressor Questions and Answers/Pictures

• Do the dryers require a pre and post filter? - Yes

• Do you want new zero-loss drains? - Yes

• Can the dryer be 350 CFM? – Whatever is the industry standard for a 75hp compressor

• Is the dryer voltage 3/460? – Yes

• Same install details as last time? Not sure on last times details

• What is the scope of work on the installation. The contractor shall provide all management, tools, supplies, equipment, and labor necessary to remove and replace a 75hp direct driven rotary screw air compressor, 460V. New compressor must have an internal or external air dryer tied into compressor to dry the air. This compressor that is to be replaced is on the second floor of a maintenance hangar. The government has a new dryer that needs installed as well. This dryer is also located on the second floor of an aircraft maintenance hangar. All electrical, piping, ductwork and rigging is the responsibility of the contractor. The contractor is responsible for removing old compressor and dryers from work site. All old duct work must be disconnected and new or existing ductwork to be hooked back up. If old ductwork can’t be salvaged, new duct work must be used to make all connections. Disposal of old compressor and two dryers must meet all state and federal regulations. The contractor must conform to the specifications and standards as outlined in AFOSH and OHSA regulations. As defined in this PWS at the 167th Airlift Wing, Shepherd Field, Martinsburg, WV.

• who is doing the piping? – Contractor is responsible

• who is doing the electrical? – Contractor is responsible

• is the delivery dock on the same level as the compressor room and accessible with a forklift? – Delivery dock and compressor room are on two different floors. Compressors and dryers will have two be installed on the second floor of a maintenance hangar, most likely with the use of a telehandler & a rigging team.

File details come from the government source that posted it. Updated .