QA W50S8V-24-B-0005 Construct Asphalt Pad dated 9 August 2024.pdf
PDF 538 KB Posted
- Attached to
- Construct Asphalt Pad Federal contract opportunity
- Solicitation number
- W50S8V-24-B-0005
- Issued by
- Department of the Army National Guard
About this file
This document is a set of Questions and Answers related to Solicitation No. W50S8V-24-B-0005 for the Construct Asphalt Pad project. The solicitation is a Total Small Business Set-Aside with a NAICS code of 237310 and an expected value of less than $25,000. Davis-Bacon wage rates apply, and payment bonds will be required if the bid amount exceeds $35,000. The project involves constructing a 30' x 90' asphalt pad, with a 20' x 90' main lane and a 10' x 90' adjacent lane. The pad will have a 4" yellow strip 12' off each long end, as well as a 44' x 20' block marked by 3" white lines and subdivided as specified. The intent is to have the total 30' x 90' pad laid at the same time, if it is within the budget. The solicitation will be awarded to the responsible bidder whose conforming bid is most advantageous to the Government, considering only price.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Abstract of Offerors - Construct Asphalt Pad.pdf | ||
| Site Visit PP - Construct Asphalt Pad.pptx | PPTX presentation | |
| Construct Asphalt Pad Site Visit Attendance Sheet.pdf | ||
| Site Visit PP - Construct Asphalt Pad.pptx | PPTX presentation | |
| Visitor and Contractor Background Check Form - Construct Asphalt Pad.docx | DOCX document | |
| SOW - Construct Asphalt Pad.pdf | ||
| W50S8V-24-B-0005 Construct Asphalt Pad.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions & Answers for Solicitation No:
W50S8V-24-B-0005
Construct Asphalt Pad 9 August 2024
Questions:
1. According to the specification, the assumption is that the 10’ x 90’ is laid adjacent to the 20’ x 90’ pad. If this is accurate, should it not be constructed as one entity or is there a reason for physical demarcation between the two?
A. The intent is to have the total 30’ x 90’ pad laid at the same time if it is within the budget. If the 20’ x 90’ lane eats up the budget, then we will not be adding the additional 10’ x 90’ lane to reduce the total cost.
2. In addition to the construction, there’ll be a 4” yellow strip 12’ off each long end as well as a 44’ x 20’ block marked by 3” white lines and subdivided as specified. Is this assumption correct? See screenshot below.
A. Yes, that is correct.