Amendment 0001 Question and Answer.pdf
PDF 93 KB Posted
- Attached to
- 100 Kilowatt Outdoor Resistive Load Bank
- Solicitation number
- W50S8R24R5007
About this file
This document is a question and answer document related to a federal contract solicitation for a 100 Kilowatt Outdoor Resistive Load Bank. The solicitation, numbered W50S8R-24-R-5007, is a request for quotation (RFQ) set aside for small businesses. The contractor shall provide a 100 kW or 125 kVA, 3-phase standby generator with a load bank that maintains 75% of the 100 kW rating. The generator will only run during power outages or monthly maintenance. Offers are due by 1:00 PM EST on March 21, 2024, and the award will be made to the lowest priced, technically acceptable offer. The solicitation includes salient characteristics of the required load bank, including load step resolution, voltage, and monitoring requirements. The procurement is overseen by the Department of the Army Ohio Army National Guard.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0001 W50S8R24R5007 Combined Synopsis.pdf | ||
| W50S8R24R5007 Combined Synopsis.pdf | ||
| Attachment 1 Clauses and Provisions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question and Answer W50S8R24R5007
Q 1: Would you please confirm with the customer the generator rated power? and what is the percentage or power that needs to be maintained?
A 1: Generator is a 100kw or 125 kva, 3 phase. 75% of 100kw needs to be maintained
Q 2: Is it for standby generator? When the standby generator starts working, the customer needs to power on the load bank and the load bank starts to load/unload automatically to maintain a certain power value?
A 2: This is a standby generator for a water lift station. The lift station water pumps are on a float switch and will operate when float switch is activated when the water is at a high level. I would say that the load bank should be on a delay when the generator starts during a power outage. If the pumps are actively running during the initial transfer of load the load bank will not be needed until the pumps shut off
Q 3: Or the generator is running 365*24*7 without stopping?
A 3: The generator will only be running when there is a power outage or during maintenance operations conducted monthly.