Solicitation #: W50S8F‐21‐Q‐0010 Project Name & Number: 400Hz Power Converter

Updated: Tuesday, August 24, 2021

RFI # Submitted Answered Question Response Response By

1 20‐Aug‐21 24‐Aug‐21

Technical Requirement Item 1.5 “Must fully compatible with the previously installed aircraft cables, reels, & electrical infra‐structure.”

Inquiry: “What the current infrastructure onsite?”

Currently installed output cable is MCM Engineering DA2‐3522‐4 Single Jacketed Cable Faciliyt Input Power: 480 volt AC (ref: Tech Req Item 3.1)

177 MSC

2 20‐Aug‐21 24‐Aug‐21 Technical Requirement Item 2.1: “Continuous max 125kva/100kw.”

Inquiry: “Is this requirement for a 50kW or 100kW?”

The required output is 50kW in accordance with the Revised Technical Requirements document.

177 MSC

3 20‐Aug‐21 24‐Aug‐21 Technical Requirement Item 2.2: “62.5kVA/50kW.”

Inquiry: “Is this requirement for a 50kW or 100kW?” see repsonse for RFI 2 above 177 MSC

4 20‐Aug‐21 24‐Aug‐21

Technical Requirements Item 6.4.1: “2000 LBS” Inquiry: “If the requirement is for a 50KW, the weight is 1830 lbs. If the requirement is for a 100KW, the weight is 3331 lbs. Is this acceptable?”

Physical characteristics, including weight, shall be in accordance with the Technical Requirements document.

177 MSC

5 19‐Aug‐21 24‐Aug‐21 Can you clarify the power rating? It lists 62.5kVA but also lists 125kVA as the continuous max.

see repsonse for RFI 2 above 177 MSC

6 19‐Aug‐21 24‐Aug‐21 In the opening, it implies that the convertor needs installed.

Should we include installation in the quote?

No. Installation is not required. Vendor shall include equipment start‐up; testing, & commissioning in accordance Technical Requirements Item 1.4

177 MSC

7 16‐Aug‐21 24‐Aug‐21

Paragraph 1.1 – The NSN number stated restricts competitive bidding from other manufactures. Will open market COTS equipment meeting or exceeding the specification (paragraphs 2 through 6) be acceptable? If yes, can the NSN be removed from the specifications.

The requirement is for NSN: 6130‐01‐581‐5332 in accordance with the Technical Requirements document and the solicitation posted on www.SAM.gov.

177 MSC

8 16‐Aug‐21 24‐Aug‐21 Paragraph 2.1 – The specification makes note of both a 62.5-kVA (50-kW) and a 125-kVA rating. Does the converter actually need to be sized to provide 125-kVA or 62.5-kVA?

see repsonse for RFI 2 above 177 MSC

9 16‐Aug‐21 24‐Aug‐21 The solicitation appears to indicate that an existing 400 HZ converter is being replaced. Can a picture be provided of the present setup?

The location is inside a secure military avaition facility with a currently operating mission.

Photographs are not authorized.

See exisiting facility requirements in repsonse to RFI 1 above.

177 MSC

10 16‐Aug‐21 24‐Aug‐21 Is the government handling the installation of the converter?

The eqipment will be installed by Government personnel.

Vendor is repsonsible for equipment start‐up; testing, & commissioning in accordance Technical Requirements Item 1.4

177 MSC