Statement of Work.pdf
PDF 109 KB Posted
- Attached to
- Mobile Ground Power Unit Federal contract opportunity
- Solicitation number
- W50S8D24Q10X1
- Issued by
- Department of the Army National Guard
About this file
This document is a Statement of Work for a federal contract opportunity to provide a 20-kVA AC/DC power system. The Air Force 105th Airlift Wing is seeking a mobile combination frequency converter and ground power system to facilitate the repair of various aircraft electrical components. The system must meet specific technical requirements for AC and DC power output, environmental conditions, and physical dimensions. The requirement is being solicited as a total small business set-aside under NAICS code 335311. Quotes are due by August 16, 2024, and the contract will be awarded to the lowest priced quote that demonstrates technical capability. The government will evaluate offers based on price and technical capability.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI 1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
105th AIRLIFT WING (ANG)
ONE MAGUIRE WAY
NEWBURGH NY 12550-5075
SUBJECT: Statement of Work
1. Purpose: Provide 3 phase 400Hz A/C and 28VDC power.
2. Scope or mission: Facilitate repair of aircraft electrical components.
3. Impact: Would allow for repair of 5 variants of retractable landing lights, aircraft refrigerators, recognition strobe lights, aircraft ovens, and ATGL components, which are currently NRTS to other repair bases. Additionally, this dual power supply can power a CATE test set for AFIN/CNAD shops.
4. Background: The ELEN Shop is not currently able to fulfill the requirements of AFI21- 101_ANGSUP which states:
4.4.2. Electrical and Environmental (E&E) Section. The E&E Section performs authorized local manufacture, repair, overhaul, testing, modification, and inspection of aircraft and SE electrical components, wiring harnesses, batteries, and charging units.
5. Period of Performance/Delivery Date: 1 January 2025
6. Special Requirements/Salient Characteristics:
AC INPUT:
Voltage* 380-480V, ± 10%, 3Ø, 3 or 4 wire plus ground Frequency 50 - 60 Hz ± 10% Phase Rotation Any Protection Over/undervoltage, loss of phase, overcurrent, short circuit. Voltage transient protection IAW IEEE C62.41.1, Location Cat. B/C Inrush Current No greater than 100% of full load current
AC OUTPUT:
Power Rating 20kVA Power Factor Range 0.5 lagging to 0.8 leading Voltage 115/200 volts, 3Ø, 4 wire, grounded neutral Voltage Adjust ± 15% Voltage Regulation ± 1.0% under all conditions of line, balanced loads and temperature Voltage Transients IAW MIL-STD-704F Frequency Regulation 400 Hz ± 0.01% under all conditions of line, load and temperature Phase Angle Regulation ± 1° for balanced loads; ± 2° for unbalanced loads Harmonic Distortion 2.0% maximum Protection Overload, short circuit, over/under voltage and safety disconnect Automatic Line Drop Compensation (ALDC) 10%
DC OUTPUT:
Voltage 28 VDC, 2 wire, grounded negative
Voltage Regulation 100% continuous rated load and ±10% input voltage ± 0.5% No load to rated load with nominal input voltage ± 0.5% Voltage Adjust 28 VDC ± 10% Current Limit Adjust 150A to full rated current Protection Overload, short circuit, over voltage and safety disconnect Automatic Line Drop Compensation (ALDC) 10%
ENVIRONMENTAL:
Acoustical Noise < 65 dBA maximum at 5 feet (1.5m) Temperature Range -40°C to +55°C Relative Humidity 10 - 95%, Non-Condensing Ingress of Water Type 3SX, IP55
Mechanical Specifications:
Unit must be mounted on wheels Unit must be less than 70 inches wide Unit must be less than 60 inches long Unit must be less than 50 inches tall Input cable, 20 feet, single jacket 3-conductor with ground and plug ready AC output cable, 30 feet, banded multiple conductor with aircraft plug DC output cable, 30 feet, banded multiple conductor with aircraft plug