RFI 1.pdf

PDF 69 KB Posted

Attached to
Repair Industrial Wastewater Sewer System
Solicitation number
W50S8D24Q10V1
Issued by

About this file

This document is a Request for Information (RFI) related to a federal contract opportunity for repairing an industrial wastewater sewer system. The RFI addresses several questions regarding the contract requirements, including confined space certification, water flow handling, debris disposal, and the extent of the polyurea coating application.

The related federal contract opportunity is a Request for Quote (RFQ) issued by the 105th Airlift Wing of the Department of the Army National Guard. The solicitation is a total small business set-aside with NAICS code 237110 and a $45 million size standard. The contract will include repairing manholes, investigating the pipe system, and repairing the pipe system as optional work. Award will be made to the lowest priced quote that demonstrates the ability to meet the Performance Work Statement requirements. Quotes are due by August 21, 2024, and a site visit is scheduled for August 14, 2024.

View the file

Other files

File Type Posted
RFI 2.pdf PDF
Wage Determination.pdf PDF
Attachment 1.pdf PDF
Performance Work Statement.pdf PDF
Pricing Worksheet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Are there any confined space requirements?

The contractor shall submit a confined space certification prior to award. The contractor shall follow all confined space regulations in accordance with governing laws.

2. If prepping and cleaning the manholes by hydrovac, are we responsible for capturing the flow of water?

Any water may flow through the system to the lagoons collection point.

3. If prepping manholes and removing debris or sediment via hydrovac, is the contractor responsible for disposing off-site?

Any debris or sediment collected shall be stored on site, location to be determined by the Government.

4. How far up the manhole should the coating material be applied?

The Polyurea 3-layer coating shall cover the entire inside of the concrete manhole including the inside ring of the cast iron manhole lid.