RFI 1.pdf
PDF 110 KB Posted
- Attached to
- Oil Water Separator Cleaning
- Solicitation number
- W50S8D22Q0001
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S-1 1470725288C.pdf | ||
| S-1 IMG_0093.jpg | JPG image | |
| S-9 301.pdf | ||
| OWS Specs.pdf | ||
| S-1 IMG_0092.jpg | JPG image | |
| Form 7- OWS Inspection Checklist.pdf | ||
| S-1 IMG_0091.jpg | JPG image | |
| S-1 IMG_0094.jpg | JPG image | |
| S-9 301-sd41.jpg | JPG image | |
| Performance Work Statement.pdf | ||
| Wage Determination.pdf | ||
| S-1 at 100 drawing.jpg | JPG image |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1) The PWS requires a QCP to be developed, however there is no mention of a safety and health plan. Please provide the minimum requirements for safety and health. Specifically, is a safety and health plan in compliance with EM 385‐1‐1 required?
The contractor shall comply with all Occupational Safety and Health Act (OSHA), federal, state, and local laws, regulations, and requirements regarding safety, as applicable to the services provided under this contract. In the event safety laws or regulations change during the term of this contract, the contractor is required to comply as such laws come into effect.
2) Please provide documentation of the last oil water separator OWS cleaning event for each unit. If the inspection reports are not available, please provide the date of the last cleaning events.
We only have the last service date and that was 12/5/2012.
File details come from the government source that posted it. Updated .