Pre Bid Conference

PTFL 212107 Repair Fence, 3369, 3371 & 3322

Solicitation # W50S8B21B0002

This meeting is strictly informational.

It is the responsibility of the contractor to review and respond to all the information in the solicitation prior to submitting a Bid.

Funds not are presently available for this procurement

Key Project Personnel Contracting Personnel:

1Lt Karen Foulds, Contracting Officer SMSgt Joyce Baker, Contracting Specialist

Base Civil Engineering Personnel:

LT Col John Koza, BCE
Capt Jiahua Ye, Deputy BCE & COR
Mr. Lanzetti Rocco

Solicitation posted to beta.SAM.gov on 23 Aug 21

• NAICS: 236220 Commercial and Institutional Building Construction

• Total Small Business Set-Aside: FAR 19.5

• Magnitude of Project: $100,000 - $250,000

• Basis for Award: Price - Ref: DFARS 252.236-7008

• Wage Determination

• General Decision Number NJ20210027 dated 7/23/21 for Burlington County

• Performance Period: 150 CALENDAR DAYS after date of Contract Award o Includes Administrative Activities, Mobilization, De-Mobilization, Punch List, Cleanup, and Closeout Documents

• There are no Liquidated Damages associated with this project.

• Solicitation Amendments have been issued:

• Amendment 001 – Posted 24 Aug 21, fixed an administrative issue with the solicitation on Sam.gov

• Review beta.SAM.gov for additional Amendments during the Bidding process

Project Information Overview: The 108th requires an adequately sized and properly configured facility to support the maintenance function of assign aircraft.

Scope: This project requires work at three separate sites. Bldg 3369 and includes the following: 1) removal of the existing gate fabric, fence posts, post footings, gates and all fence accessories, followed by the installation of new materials as specified. All materials shall be in accordance with (IAW) the attached Fence Specifications document. 2) Installation of upward coiling security grilles at 3 overhead bay door entrances IAW description below. Site #2 is at Bldg 3379 and includes removal and replacement of 2 cantilever vehicle gates, associated gate operators and all accessories IAW attached Fence Specification document. 3) For bldg. 3322, this project will reconfigure existing fenced areas through the removal and installation of fencing as depicted on attached drawing. All new fencing shall be in compliance with attached Fencing Specifications.

Project Information

The bid Submission, SF1442, contains one priced Contract Line Items (CLIN):

CLIN 0001 – Repair Fence 3369, 3371 & 3322

• No further Bid Break-Out is required by bidders.

Key Project Personnel Project Management & Site Superintendent The contractor shall be required to provide a dedicated Site Superintendent through completion of the project.

The Site Superintendent MUST be on site at all times during active construction activities.

Project Manager, Quality Control and Superintendent Positions are considered key positions.

These positions SHALL NOT be subcontracted below the Prime Contractor

Submit Questions Questions must be submitted via email to the Contracting Office No Later than 2:00pm, EST, 3 Sep 2021 Email: joyce.baker@us.af.mil and karen.e.foulds@us.af.mil Procedures for submitting Bid Questions are located in the SF1442 Section 00100 Attach 03 and MUST be followed or questions will NOT be answered.

Do NOT submit questions directly to the AE Firm, Engineering Office, other Government personnel.

Answers will be posted to beta.SAM.gov in the form of a Solicitation Amendment on a SF30 Contractors will not receive personalized responses to questions.

Questions received after the above date & time will not be answered

Bidder Responsibility Bidders MUST be registered in System for Award Management (SAM) at the time of Bid Opening.

The Government will make a determination of Responsibility in accordance with the requirements set forth in the SF 1442.

To determine Responsibility - The apparent low bidder may be requested by the Government, prior to Award, to submit a statement regarding previous experience in performing comparable work, business and technical organization, financial, insurance, and bonding resources, or plant available to be used in performing the work.

Past Performance will not be evaluated separately for the this solicitation.

What to submit Clear and concise bid addressing all requirements detailed in the Solicitation.

Bid Package requirements are detailed in Section 00100, Attach 03, Item 7 – “Bid Packages” Bids must be signed on the SF1442 - Submit hard copy a full digital pdf version of your bid.

Acknowledge all Amendments on the Solicitation, SF1442 Complete and return Representations and Certifications found in Section 00600 Bid Guarantee - Required for all bids over $150K Must be 20% of the Proposal Price or $3m which ever is less & Submitted on Standard Form 24

Bid Submission & Opening Bidders MUST review the SF1442, Section 00100, Item 8 Bid Submission for full procedures and guidance.

• Due –8 Sep 2021 @ 11:00 am, EST Submit By:

Mailed in: Postal Delivery / FEDEX / UPS… (Offerors shall email theContracting Office giving notification that they have mailed in their Bids& provide a tracking number)
Hand Delivery to 108 Contracting

ALL HAND DELIVERIES WILL BE BY APPOINTMENT ONLY & MUST BE DURING NORMAL BUSINESS HOURS.

BIDDER MUST EMAIL THE CONRACTING OFFICE A MINIMUM OF 24 HOURS IN ADVANCE FOR AN APPOINTMENT TIME

Bidders are responsible for ensuring that Bids are received by the Due Date & Time. Allow ample time for mail, shipping, communication, traffic delays… Late Bids will NOT be Accepted

Submit After Award Payment & Performance Bonds submitted on Standard Form on 25 & 25a for all contracts / proposals over $150,000 Due 10 days after of Notice to Proceed per FAR 52.228-15

Subcontractor Information

Certificate of Insurance and Standard Form SF1413 Due 14 days after of Notice to Proceed per FAR 52.222-11 Construction Schedule

Background Investigation Requests; Safety Plan; Key Personnel Letter; AF3065; Material Submittals…

Technical Discussion

Site Visit image1.jpeg image2.png