W50S8A-24-R-0001 RFI Log Responses.xlsx

XLSX spreadsheet 32 KB Posted

Attached to
Building 254 Demolition & Mold Abatement
Solicitation number
W50S8A-24-R-0001
Issued by

About this file

This document contains a Request for Information (RFI) log for Solicitation Number W50S8A-24-R-0001, which is a combined synopsis/solicitation under FAR 13.5 for Building 254 Demolition & Mold Abatement services. The New Hampshire National Guard is seeking a contractor to provide demolition, mold remediation, and HVAC mold remediation services for a 30,000 sq ft office space. Key details include:

The scope involves removing 38,000 sq ft of mold-contaminated walls, partitions, and drywall; 10,000 sq ft of mold-contaminated ceiling tiles; and 10,000 sq ft of mold-contaminated carpet. The contractor shall also perform mold abatement and debris disposal. The contract duration is 60 calendar days. This is a 100% small business set-aside with a NAICS code of 238918. A site visit was held on July 2, 2024, and the bid due date is July 22, 2024. The RFI log contains 53 questions and responses addressing details such as drawings, hazardous materials, HVAC, furniture/contents, permits, and other execution requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI

RFI TRACKER - W50S8A-24-R-0001
254 DEMO & MOLD REMEDIATION
RFI #TITLEDate ReceivedDate PostedANSWERADDENDUM ISSUED/REQUIRED
1Can you please provide a floor plan and highlight the areas where the ceiling tile, drywall, and flooring are to be removed?3-Jul-2416-Jul-24Maps outlining Drywall, Ceiling tile, and Carpet have been made available. Restoration is not part of this contract effort. Demo, cleaning, and disposal is. See PWS.
2Can you please provide copies of the Hazardous Materials Survey and the Mold Report?3-Jul-2416-Jul-24A copy of a hazard wipe samples log has been uploaded to SAM.gov as an attachment. No mold report is available at this time, the Government has identified specific walls, ceilings, and carpet to be removed and assumed to be mold contaminated. Three remediation plans have been uploaded as an attachment to SAM.gov outlining specific removal areas.
3Can you please provide a Mechanical Plan that details the ductwork?3-Jul-2416-Jul-24The mechanical plans are in the process of being digitized. At this time to linear feet measurement in the PWS is what we have available. The systems requiring cleaning service all of the in scope areas on the plans provided to Contracting. The facility utilizes Roof Top Units, air handlers, and VAVs to provide a mixture of heating and cooling capacities to the building.
4Will the Gov. Remove the pictures from the walls before we arrive?3-Jul-2416-Jul-24Yes.
5Can you provide a detailed list of the contents that will be removed & disposed as part of the remediation effort?3-Jul-2416-Jul-24The facility occupants are in the process of collecting personal effects, and items they want to keep. Anything left over in the facility ie personal effects, chairs, desks, tables will be considered ready for disposal OR will be clearly marked for cleaning. At this time CES estimates no more than three 30yd dumpsters of items requiring disposal. Any metal items can be taken to a dumpster on the installation for recycling at a no cost basis, but prior coordination with the COR will be required. Moving metal from the demo location to the dumpster location will be the responsibility of the awardee.
6I was wondering if we could see the schematics of the building. Is it possible?3-Jul-2416-Jul-24The full schematics of the facility are not fully digitized and go back to as built drawings from 40yrs ago. The full plans will not be provided.
7Is there a Mold report for this project?8-Jul-2416-Jul-24See RFI 2
8Have all the building materials being removed been tested for asbestos?8-Jul-2416-Jul-24The facility has been inspected multiple times by the government and it has been reported to have no ACM present.
9Can you clarify what the red lines mean in the remediation plan provided?8-Jul-2416-Jul-24The red lines on the remediation plan indicate specific walls that need to have drywall removed.
10Can we get the mechanical plans for the HVAC system?8-Jul-2416-Jul-24see RFI 3
11Is there a Mold report for this project?8-Jul-2416-Jul-24See RFI 2
12Since the bid date has been extended is it possible to schedule another site visit for this?8-Jul-2416-Jul-24The response date has nbt been extended on this project and a second site visit is not planned at this time.
13Please confirm if taxes should be carried in proposals?9-Jul-2416-Jul-24Proposals should include all applicable taxes
14Please confirm if any state, local, and/or Federal permits will be required on this project?9-Jul-2416-Jul-24No permits shall be required.
15Besides the mold identified in the scope of work, please confirm if there are any known hazardous materials?9-Jul-2416-Jul-24There were known sampled RCRA metals in the facility as identified in the 2019 report. See RFI 2.
16Please confirm if this project will require 2 people for management (Superintendant / SSHO and QC)?9-Jul-2416-Jul-24The Superintendent/SSHO/QC can all be one knowledgable person.
17the SOW references plans but no plans were included. Can the Government provide those referenced plans?9-Jul-2416-Jul-24See RFI 1.
18To accurately price CLIN 002 Option 1 - HVAC Mold Remediation, subcontractors will need existing duct drawings to review size and length of ductwork. Can the Government provide this information?9-Jul-2416-Jul-24See RFI 2.
19SOW references plans but no plans were included.9-Jul-2416-Jul-24See RFI 1.
20Who identifies what furniture/items is to be cleaned and stored and what is to be disposed of?9-Jul-2416-Jul-24See RFI 5.
21Will the furniture/items to be cleaned and stored be identified prior to bidding?9-Jul-2416-Jul-24See RFI 5.
22Will all carpet be removed and replaced?9-Jul-2416-Jul-24All carpet identified in the areas on the plans must be removed and disposed of by the contractor. We are not asking for any replacement of any carpet with this contract effort.
23Will all ceiling tiles be removed and replaced?9-Jul-2416-Jul-24All ceiling tiles in the areas on the plans shall be removed and disposed of by the contractor. There is no replacement of ceiling tiles with this effort.
24Sq Footage in SOW does not seem to be consistent with area of building, please clarify.9-Jul-2416-Jul-24The Square footage measured in the plans conforms to the amounts of material estimated to be removed.
25Will all personal items be removed?9-Jul-2416-Jul-24Yes.
26Will walls be removed up to a certain point or will all GWB be removed?9-Jul-2416-Jul-24All the way to the roof deck.
27Will leak repairs be completed prior to decon work being started?9-Jul-2416-Jul-24No.
28Can the NHNG provide a plan of what rooms and areas are to be cleaned/demo’d and restored as part of this project9-Jul-2416-Jul-24See RFI 1.
29Is any of this work required to be phased?9-Jul-2416-Jul-24No, but there are areas inside the building that are occupied and not contaminated by mold. Those zones are part of active base operations and aircraft maintenance. Which shall not be interrupted without prior coordination with the COR.
30Will NHNG remove all IT and computer equipment prior to work beginning?9-Jul-2416-Jul-24Yes. Anything COMM equipment not bolted down will be removed.
31Does the government have a ACM report for this building?9-Jul-2416-Jul-24Yes. It is available.
32Please provide an as built mechanical duct work plan to better understand HVAC duct system for cleaning.9-Jul-2416-Jul-24See RFI 3.
33Will awarded contractor be able to have a dedicated area for a dumpster on site?9-Jul-2416-Jul-24Yes, a contractor "lay down" area will be designated for the duration of the contract.
34For drywall removal – are we removing walls completed from floor to ceiling? Or removing up to 4’ for example?9-Jul-2416-Jul-24All the way to the roof deck.
35Will entire building be available for one sequence of remediation and demo?9-Jul-2416-Jul-24Yes, but there are areas inside the building that are occupied and not contaminated by mold. Those zones are part of active base operations and aircraft maintenance. Which shall not be interrupted without prior coordination with the COR. Any utility interruption to the facility will also need to be coordinated.
36Can more info be provided on the security / vetting process requirements.9-Jul-2416-Jul-24All individuals requiring regular base access for this project will need to be vetted and given a temporary badge by Pease Security Forces. Specific requirements for base access will be coordinated with the awarded contractor.
37Can contractor performing mold remediation contract the Certified Industrial Hygenist?9-Jul-2416-Jul-24Yes, the statement of work stipulates the effort will have a CIH create a plan for work to proceed.
38Does the CIH have to be on site full time during remediation?9-Jul-2416-Jul-24No.
39Can you please clarify the due date for the solicitation? There are two dates in the Solicitation. “1.7. Response Date: 22 July 2024”9-Jul-2416-Jul-24Proposals are due COB on the 22nd of July
40The Original statement of work mentions removal of heavy metals. While at the site visit it was not mentioned. Is this still part of the statement of work? How much should we expect to remove if it is still a part of the work?9-Jul-2416-Jul-24The facility was tested for heavy metals in 2019 and for mold most recently, those reports if released for bidding detail the levels and locations of the testing locations inside the facility. The CIH should be given those inspection reports to create a plan for what level of work is in
41The Original statement of work mentions encapsulating the ducts. Is this still to be included in the 3,000 sf removal of ducting?9-Jul-2416-Jul-24The duct work is not to be removed. The ductwork has been circulating mold riddled air for months and most likely has mold inside of it. The bid option for HVAC duct cleaning and encapsulation is not for removal of the duct itself, but to clean and seal it before we can rebuilt the area in a separate effort. If the bid option for HVAC is not actioned upon, the duct work will not be touched.
42Based on the scope provided we felt the appropriate prevailing categories we would use are "Supervisor" "Laborer", "Plumbing" and "HVAC" rates. Is there another category PEASE would require based on the scope?16-Jul-24The Government is not able to make recommendations on labor categories required for completion of work. Any labor categories and the associated pay rates should reflect the work being completed in support of this project.
43Confirming all employees on site need valid Identification to be let on base? Any other qualifications required for all those entering the base? Can you provide any other information on the qualifications of those who would be on base?16-Jul-24Valid ID will be required for vetting by Security Forces. Specific requirements will be coordinated with the awarded contractor.
44Confirming the third party hired by PEASE would be the party responsible for clearance testing?16-Jul-24The contractor shall hire a certified testing lab to verify their efforts and provide them as written in the deliverables section of the SOW.
45When is the roof going to be fixed and/or secured?16-Jul-24The roof project is ongoing but is not anticipated to be complete prior to the period of performance on this project.
46Currently, electrical is a concern as a hazard. Will the review of the safety of the electrical be handled by the base for safety or should this inspection be included in our proposal?16-Jul-24Included in the proposal.
47Will there be a designated place on base where storage containers for contents and dumpsters for debris can be placed within close proximity of the building?16-Jul-24Yes, see RFI 33.
48Does the base have a deadline completion date in mind to complete this project?16-Jul-24The period of performance is 60 days after award.
49Will be there a secondary time we can visit the rooms/spaces we were unable to view on the initial walk through?16-Jul-24During the walk through CES could have gained access to any area in the facility if the question was raised to the appropriate personnel.
50Section 5.0 I have two questions:
a.This section states “There will also be a holding area designated in the contaminated zone for the placement of furniture items to be disposed of in accordance with this effort” Who is determining what is to be disposed of?
b.Are we to include the cost of our own Certified Industrial Hygienist per section 5.0 Requirements? Or, will the current IH provide this plan?16-Jul-24The NHANG will determin and identify which items shall be disposed of. The intent is to have the items the occupants do not want to keep brought to a specific spot within the facility to be thrown out. The items they wish to keep will be placed in an area to be cleaned and subsequently returned to them.
51Section 5.5.2 references there is floors with asbestos containing materials --Could you please send this report?16-Jul-24The reference to asbestos in the SOW were included from Unified Facility Guide Spec verbiage. The facility has been inspected multiple times and has been deemed to have no asbestos containing material.
52Section 5.7- When it comes to contents/furniture after they are cleaned. It states that they are to be moved and stored in a clean area. Is there a clean area available on the base for us to utilize? Or, will we need to transport to our own?16-Jul-24A non mold contaminated area will be made in the facility or the gov't will provide shipping container storage for items that have been identified to be kept and cleaned in close proximity to the facility.
53Is there a place for us to stage all equipment and materials and utilize as an office area for onsite personnel?16-Jul-24Yes. An area in the facility will be identified for use by the contractor. Staging of materials and equipment will be dependant on the storage requirements of the material. The gov't has a limited supply of on site shipping containers, but use is not guaranteed. Contract awardee shall be required to precoordinate ANY storage or equipment requirements with the COR.
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175

Sheet1

CompanyNameEmail
EnvirovantageChris PriorChrisP@EnviroVantage.Com

mailto:ChrisP@EnviroVantage.Com

File details come from the government source that posted it. Updated .