W50S86-22-B-0001 RFI Response.pdf
PDF 380 KB Posted
- Attached to
- Repair of a Firefighter Training Facility
- Solicitation number
- W50S86-22-B-0001
- Issued by
-
Department of the Army National Guard
About this file
This solicitation requests proposals for the repair of a firefighter training facility at the Alpena Combat Readiness Training Center in Michigan. The contractor will be responsible for providing all labor, materials, equipment, and supervision to complete the scope of work, which includes repairing Buildings 840/844 and has a value between $1 million to $5 million. This requirement is set aside solely for small businesses with a size standard of $39.5 million or less in average annual receipts. The Department of the Army National Guard is the contracting agency. Proposals are due by September 21, 2022 and award is anticipated by September 30, 2022. The contract will be a firm-fixed price. All interested parties must register in the System for Award Management prior to award. The period of performance is tentatively set from September 21, 2022 through January 21, 2023.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Serving the Community, State & Nation
MICHIGAN AIR NATIONAL GUARD
HEADQUARTERS ALPENA COMBAT READINESS TRAINING CENTER 5884 A. STREET
ALPENA, MI 49707-8125
25 Aug 2022
RFI #1
Requestor: Mr. David Hammerquist, Thunder Bay Electric
Question 1: “What is the estimated size of the pole bases to be removed?
Answer: Drawings indicate 78”.
Question 2: “Please confirm the 17-foot minimum depth for new pole bases shown on E-501.”
Answer: 17-foot minimum is correct.
RFI #2
Requestor: Mr. David Hammerquist, Thunder Bay Electric
Question 1: “What type of electrical conduit is permitted inside the concrete trenches of the mock-up area?
Answer: The conduit should be rigid, metallic conduit and should also use water-tight fittings inside the trenches. Anything non-metallic will have issues with heat, and if the trenches will be flooded, need to make it so water doesn’t flood the conduit.
NO CHANGES TO THE BID DUE DATE HAVE BEEN MADE.
Thomas B. Emery, MSgt Contract Specialist