Pre-Bid Conference_Site Visit W50S8524B0003.pdf

PDF 498 KB Posted

Attached to
VGLZ242006 Replace Section of MV Feeder 1 fromSW1-6 to SW1-12
Solicitation number
W50S8524B0003
Issued by

About this file

This document is a Pre-Bid Conference Presentation for a federal contract opportunity, Solicitation W50S8524B0003, to replace a segment of medium voltage (MV) feeder 1 at Selfridge Air National Guard Base. The project, titled VGLZ 242006 Replace Segment of MV Feeder 1 from SW1-6 to SW1-12, has an estimated magnitude between $250,000 and $500,000. It is a 100% small business set-aside with a 180-calendar day period of performance. Key details include: the contractor shall provide services to remove, demolish, and dispose of old MV cables and install new 5/15 kV copper cables; the project is locally funded with potential for overnight outages; submission requirements include an SF 1442, bid schedule, and bid bond; and a pre-bid conference and site visit is mandatory for prospective bidders. The solicitation and all related documents will be posted on SAM.gov.

View the file

Other files

File Type Posted
OF_1419A pg 2 - W50S8524B0003.pdf PDF
OF_1419 Abstract of Offers W50S8524B0003.pdf PDF
W50S8524B0003 RFIs as of 20 June 24.pdf PDF
Amendment 2 W50S8524B0003.pdf PDF
Pre Bid Conference Sign in Sheet.pdf PDF
RFIs.pdf PDF
Amendment 0001 W50S8524B0003.pdf PDF
02_General Contract Spec (2).pdf PDF
W50S8524B0003 (1).pdf PDF
Copy of 127 SFS Vetted Form (003).xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Selfridge ANG Base Pre-Bid Submission Meeting and Site Visit

• Project #VGLZ 242006 Replace Segment of MV Feeder 1 from SW1-6 to

SW1-12

• Solicitation: W50S8524B0003

12 June 2024

Integrity – Excellence – Service

Agenda

• Admin Matters/Contact info

• Process for Questions and Answers (Requests for Information)

• Project Overview

• Notable Items

• Bid Schedule

• Sealed Bid Requirements and procedures for submission of bids

• Determination of Responsibility

• Small Business Subcontracting Plan

• Questions

Administrative Matters - Attendance Roster

• Ensure you sign the attendance roster

• We plan to post the roster and this power point presentation on https://sam.gov to facilitate communication amongst potential suppliers and subcontractors.

• No other site visits will be granted.

Contact Information

• Contracting Specialist

Ms. Anna Randall anna.randall.1@us.af.mil

• Contracting Officer Steven Stocking steven.stocking.2@us.af.mil mailto:jeremy.starrett.1@us.af.mil

Process for Questions and Answers

• Submit questions (aka Requests for Information) to Steven Stocking and Anna Randall. See Section 00100 for instructions.

• Questions and Answers will be posted on SAM.gov on a non attributional basis with solicitation at https://sam.gov

• Submit questions not later than the fifth working day prior to bid opening.

• Any changes to the drawings, specifications, etc. will be issued in the form of an amendment. However, any answers that clarify or provide an interpretation to the drawings, specifications, etc. will NOT be posted via amendment.

https://sam.gov/

Project Overview

• Title: VGLZ 242006 Replace Segment of MV Feeder 1 from SW1-6 to SW1-12

• Magnitude: Between $250,000 and $500,000.

• A firm fixed price contract will be awarded to the lowest price, responsive, and responsible small business sealed bid offer

• Performance Period: 180 calendar Days after issuance of Notice to Proceed.

• The Notice to Proceed will be issued after formal approval of applicable bonds.

Project Overview

Project requirements include:

TheContractor shall provide services, non-personal, to provide all plant, labour, transportation, materials, tools,equipment, appliances, and supervision necessary for the Construction of VGLZ 242006 Replace Segment of MVFeeder 1 from SW1-6 to SW1-12. The primary tasks of subject project are to remove, demolish and dispose of medium voltage cables and install new 133% EPR insulation level medium voltage copper cables (5/15 kV) 500 KCMIL copper cables (3) with #4/0 copper ground conductor from SW1-6 to SW1-12 using existing duct banks.The contractor shall also properly tag and fireproof their work as needed. The old cables are very old and containlead and shall be handled and disposed of properly. The Contractor shall also provide 3rd party testing for all cables,submit report before energizingstandards as w and conditions.

ell as all other referenced terms

Notable Items

Brand Name Requirements: N/A

DFARS 252.204-7020 NIST SP 800-171 DoD Assessment Requirements

- Contracting Officer shall verify..... prior to award (DFARS 204.7303 (b)(1))

- Complete the Assessment in the Supplier Performance Risk System (SPRS)

Request the SPRS vendor role: https//:piee.eb.mil

SPRS Access and NIST Quick Entry Guide:

https://www.sprs.csd.disa.mil/pdf/NISTSP800-171QuickEntryGuide.pdf

SPRS Frequently Asked Questions: https://www.sprs.csd.disa.mil/faqs.htm#nist

Bid Schedule/Logistics

• CLIN 0001 – VGLZ 242006

Logistics

1. The project will be locally funded before 30 September 24 unless there is a bid bust.

2. The Drawings are not scalable.

3. Lead is not expected to be present as the cables are about 25 years old

4. The outages will be scheduled on weekends where the units are not doing thier monthly Air National Guard Training.

5. Outages will last less than one day to include testing.

6. If outages are overnight back up generators may need to be provided by the

Contractor.

7. The project has the potential to have confined space work elements.

8. Water is expected underground due to local water table.

Sealed Bid Procedures

The following is a brief overview of the sealed bid requirements:

• BIDDERS ARE STRONLY CAUTIONED TO CAREFULLY READ THE

REQUIREMENTS OF THE SOLICIATION AND COMPLY ACCORDINGLY

REFER TO THE SOLICITATION AND FAR 14 FOR DETAILS.

• Public bid opening occurs. Prices are read to the public. There will be no discussion.

• Bidders must submit sealed bids to be opened at the time and place stated int the solicitation for the public opening of bids

• After bids are publicly opened an award will be made to that responsible bidder whose bid conforming to the IFB will be most advantageous to the Government considering only price and price related factors.

• The bid abstract will be certified and posted on SAM.gov as soon as practicable.

Bid Requirements

• SF 1442, (Blocks 14-20c)-Do not enter less than 120 days in block 17

• Section 00010. Bid Schedule—all items must be priced.

• IAW Clause 252.236-7008, Contract Prices-Bidding Schedules (Dec

1991) the prices shown in the bidding schedule must reflect ALL COSTS involved in performing the work, as described in the plans and specifications.

• Reps and Certs (00 45 00): In addition, the bidder must have entered current and complete data within the past year via the Online Representatives and Certifications at https://sam.gov

• Acknowledge all amendments issued on an SF 30 on page 2 of SF1442 and/or by providing signed SF 30s with bid.

• Bid Bond/Guarantee for offers over $150K shall be 20% of the complete bid price and be issued the most recent edition of the SF 24 with a complete power of attorney.

http://www.sam.gov/

Bid Requirements-Bid Submission

• The bid opening will occur at the date and time specified on Block 13 of the SF 1442 at Selfridge Air National Guard Base, MI Bldg. 105

• Hand carried bids must be dropped off prior to the time established for the opening of bids. A Base access form must be generated for individuals attending the bid opening or to drop off bids.

• Mailed bids must be received at the location specified on block 7 prior to the time established for opening of bids.

• Mailing address:

USPFO MI 127 MISSION SUPPORT CONTRACTING

43200 MAPLE ST

SELFRIDGE ANGB MI 48045-5213

• Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304 and the clause at FAR 52.214-7

Determination of Responsibility

• IMPORTANT: REFER TO THE SOLICIATATION AND FAR

PART 9 FOR DETAILS

• To establish its responsibility, the apparent low bidder may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work. This action may be requested to determine if the contractor is responsible.

Subcontracting Plan

• N/A: A Subcontracting Plan is not needed for this requirment.

Questions?

Questions will not be answered at the site visit.

Please ensure that the Request for Information process is utilized.

Selfridge ANG Base�Pre-Bid Submission Meeting and Site Visit
Agenda
Administrative Matters -�Attendance Roster
Contact Information
Process for Questions and Answers
Project Overview
Project Overview
Notable Items
Bid Schedule
Sealed Bid Procedures
Bid Requirements
Bid Requirements-Bid Submission
Determination of Responsibility
Subcontracting Plan
Questions?