This document contains questions and answers regarding solicitation W50S8523B0009 from the Department of the Army Michigan Army National Guard for repair work on Perimeter Road - Connector Road. The solicitation requests information on pricing for starting work in either 2023 or 2024 due to concerns about availability of funds and adverse weather conditions impacting completion within the 120 day timeframe. The agency confirms there are clauses to extend the period of performance without penalties if needed. The response also indicates several specification sections were removed as they are not required for this contract scope of work.

View the file

Other files

File Type Posted
bid opening sign in sheet.pdf PDF
OF_1419 W50S8523B0009.pdf PDF
OF_1419A W50S8523B0009.pdf PDF
VGLZ 182035 Repair Perimetr Road Connector Rd AF 66.pdf PDF
W50S8523B0009 Amendment 1.pdf PDF
127 SFS Vetted Form.xlsx XLSX spreadsheet
2. Connector Road_Specifications.pdf PDF
3. SANG Connector 100%.pdf PDF
Source ID Docs SANGB MI.pdf PDF
W50S8523B0009.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W50S8523B0009 VGLZ 182035 - Repair Perimeter Road -- Connector Road

Q1. Per the solicitation funds may not be available until 30 September 2023. Should that be the case the project schedule would most likely run into adverse weather conditions. These conditions would either require additional costs or may not allow the work to be completed in the 120 days due to bituminous plant closures if the project were to start in 2023. As such, please advise if our proposal should be based on starting the work in 2023 or 2024 so we may price accordingly.

A1: There is no expectation that paving operations will transpire on this project after the Metro Detroit bituminous plants close. There are procedures and clauses built into the contract to increase the contract period of performance without contract price changes or penalties to the Contractor or the US Government as the situation dictates.

Q2: noticed that the following sections were referenced in the Project Specifications Table of Contents but not included. Would you mind confirming if these will be addressed in an amendment/update:

Section 201. Clearing

Section 202. Removing Trees, Stumps, and Corduroy

Section 203. Removing Drainage Structures, Culverts, and Sewers

Section 204. Removing Miscellaneous Structures and Materials

Section 206. Excavation and Backfill for Structures

Section 209. Project Cleanup

Section 303. Open-Graded Drainage Courses

Section 306. Aggregate Surface Course and Maintenance Gravel

Section 503. Paver-Placed Surface Seal

Section 504. Micro-Surfacing

Section 505. Chip Seals

Section 506. Slurry Seal

Section 801. Concrete Driveways

Section 802. Concrete Curb, Gutter, and Dividers

Section 803. Concrete Sidewalk, Curb Ramps, and Steps

Section 804. Concrete Barriers, Glare Screens, and Foundations for Light Standards and Sign Supports

Section 805. Hot Mix Asphalt Curb

Section 806. Shared Use Paths

Section 807. Guardrail, Guardrail Terminals, and Miscellaneous Posts

Section 808. Fencing

Section 809. Field Office

Section 812. Temporary Traffic Control for Construction Zone Operations

Section 813. Slope Protection

Section 814. Paved Ditches

Section 815. Landscaping

Section 816. Turf Establishment

Section 817. Reserved

Section 818. Electrical

Section 819. Lighting

Section 820. Traffic Signals

Section 821. Preservation of Boundary Monuments

Section 822. Shoulder and Centerline Pavement Corrugations

Section 823. Water Mains

Section 824. Construction Surveying and Staking

Section 825. Sanitary Sewer Systems

Section 901. Cement and Lime

Section 906. Structural Steel

Section 907. Fencing Materials

Section 908. Miscellaneous Metal Products

Section 909. Drainage Products

Section 911. Water

Section 912. Timber and Lumber

Section 913. Masonry Units

Section 914. Joint and Waterproofing Materials

Section 915. Bridge Coating Systems

Section 917. Turf and Landscaping Materials

Section 918. Electrical and Lighting Materials

Section 921. Permanent Traffic Signal Materials

Section 922. Temporary Traffic Control Materials

Section 923. Water Main Materials

A2.: These sections were removed from the specifications because they are not needed to complete the work on contract.