MBMV202794
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to clarify the conflicting times for pre-proposal site visit on 13 August from 10:00 a.m.
Actual Date site visit date is 13 August 2020 2:00 p.m. EST Add Clause 52.204-25, 52.228-2, and 52.243-5
1. CONTRACT ID CODE PAGE OF PAGES
J 1 13
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S8420R0002
X 9B. DATED (SEE ITEM 11)
06-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Aug-2020
CODE
USPFO MI 110 MISSION SUPPORT CONTRACTING
50 SABER ST
BATTLE CREEK MI 49015-5515
W50S84 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S8420R0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required performance has changed from Project Title: Bldg. 6901 Replace BoilersProject#:
MBMV202794Location: Battle Creek ANGB, MI (48037)Period of Performance: 45 Days1) Set-aside: This requirement is set-aside 100% for small business concerns.2) Small Business Size Standard: $16.5M3) NAICS Code: 238220 Plumbing, Heating, and Air-Conditioning Contractors4) Project Magnitude: Between $25,000 and $100,0005) Submit Proposals no later than 28 August , 2020 @ 11:00 AM ET6) Prospective bidders are highly encouraged to attend a pre-proposal conference to be conducted on 13 August, 2020 at 10:00am ET. (See Documents for Access Requirements)Award w ill be made, in accordance w ith FAR 13.106-3, to the responsible Offeror w hose proposal conforms to the Request for Proposal and is most advantageous to the Government considering price and Non-price related factors. **Funds are not presently available for this contract. Currently, the Government anticipates funds w ill become available prior to but no later than midnight 30 September 2020. This action has been identified on the National Guard priority list for aw ard if funds become available and the prices received are w w ithin an aw ardable range. to Project Title: Bldg. 6901 Replace BoilersProject#:
MBMV202794Location: Battle Creek ANGB, MI (48037)Period of Performance: 45 Days1) Set-aside: This requirement is set-aside 100% for small business concerns.2) Small Business Size Standard: $16.5M3) NAICS Code: 238220 Plumbing, Heating, and Air-Conditioning Contractors4) Project Magnitude: Between $25,000 and $100,0005) Submit Proposals no later than 28 August , 2020 @ 11:00 AM ET6) Prospective bidders are highly encouraged to attend a pre-proposal conference to be conducted on 13 August, 2020 at 2:00 pm ET. (See Documents for Access Requirements)Award w ill be made, in accordance w ith FAR 13.106-3, to the responsible Offeror w hose proposal conforms to the Request for Proposal and is most advantageous to the Government considering price and Non-price related factors. **Funds are not presently available for this contract. Currently, the Government anticipates funds w ill become available prior to but no later than midnight 30 September 2020. This action has been identified on the National Guard priority list for aw ard if funds become available and the prices received are w w ithin an aw ardable range..
The following have been modified:
INSTRUCTIONS TO OFFERORS
Section 00100 INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
1. SCOPE
1.1. You are invited to submit a proposal in response to our Request for Proposal W50S84-20-R- 0002 for MBMV202794 Replace Boilers, Building 6911, Battle Creek Air National Guard, MI 49037. As a result of this solicitation, the Government intends to award a single Firm Fixed Price (FFP) contract to the responsible offeror whose proposal represents the best value after evaluation in accordance with the Factors and Sub-Factors in the solicitation.
1.2. This solicitation is set-aside 100% for small businesses.
2.1. A pre-proposal conference / site visit will be conducted on 13 August 2020 at 2:00 PM ET, local time forthe purposes of briefing on the proposal requirements and answering questions regarding this solicitation. This conference will be held at 280 Canberra Street, Bldg. 7020 Conference Room, Battle Creek ANGB, MI. Interested Contractors are Highly Encouraged to attend the pre-proposal conference. The site visit will be held following the conference.
2.1.1 In order to gain access to the W.K. Kellogg (Battle Creek) ANGB, an access form must be completed by each individual to receive an access badge. This access form grants the base Security Forces Squadron the ability to run a background check on you through the Law Enforcement Information Network (LEIN). Individuals may be denied access to the base, as a result of the information discovered through the LEIN check. Once this process is complete you will have 30 calendar days to pick up your access badge at the base.
2.2. Due to security conditions, all offerors must register to attend this conference and site visit.
Currently, all personnel entering Battle Creek ANGB and Selfridge ANGB who cannot maintain 6’ of social distancing, are required to have a mask on. A cloth face covering is acceptable.
a. A cloth face covering shall extend above the nose without interfering with eyewear, and below the chin to cover the mouth and nostrils completely. It shall fit snugly but comfortably against the sides of the face and be secured. Cloth face covering shall be laundered regularly to maintain good hygiene.
b. CDC guidance on use and instructions for homemade face coverings (including no-sew options using common household items) may be found here:
https://www.cdc.gov/coronavirus/2019-ncov/downloads/DIY-cloth-face-covering-instructions.pdf
Battle Creek ANGB “Pre-Authorization Access Request List” must be completed and received by Major Robert Robert Loniewsky, and Mr. Jamieson Taylor 3 business days prior to the Scheduled Site Visit. Please see the Solicitation. The pre access list is found on beta.SAM.gov Attachments within https://beta.SAM.gov OR email the POC’s below to retrieve the “Base Access Request Form” and “Access Form Directions” files.
Site Visit - Points of Contact (POC) Taylor Jamieson AND Major Robert Loniewsky Address: jamieson.b.taylor.nfg@mail.mil / robert.loniewsky.2@us.af.mil Telephone: (269) 969-3347 / (269) 969-3363
Be aware that the following information will be needed to fill out the “Base Access Request Form”:
Last Name, First Name, Middle Name Sr/Jr:
Date of Birth:
Driver’s License # or State / Federal ID #:
State of Issue:
Gender:
Race:
Nationality:
Company:
Foreign Visitors: Must reach out for further guidance / information.
2.3. This information must be provided in advance, not later than 3 business days prior to the meeting, in order to ensure access to the military base and conference site and ensure adequate seating for the conference attendees. Even if you have access to the base you must register to ensure adequate seating. The furnishing of the above information is voluntary; however, your failure to furnish all or part of the requested information may result in the Government’s denial of your access to the pre-bid conference. This information will be provided to the Base Security Forces who will authorize your entrance to the site.
2.4. You may be required to present the following information upon arrival: (1) Vehicle Registration, (2) Valid Driver’s License, (3) Proof of Insurance for Vehicle, and/or (4) Safety Inspection and Car Rental agreement if applicable. Any of the above information furnished by you is protected under the Privacy Act and shall not be released unless permitted by law and/or you have consented to such.
2.5. Information provided at this conference or site visit shall not qualify the terms and conditions of the solicitation and specifications. Terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. If an amendment is issued, normal procedures relating to the acknowledgment and receipt of solicitation amendments shall apply.
2.6. A record of the conference shall be made and furnished to all prospective offerors via posting to:
https://beta.sam.gov The record will include minutes of the meeting, including questions (on a non-attribution basis) and answers.
At this time, a Mask is required when 6’ of Social Distancing cannot be maintained. Anyone entering the base shall have a Mask at this time.
3. FORMAL COMMUNICATION, OFFEROR EXPLANATIONS
3.1. Submit all questions via email to the contracting office at the address shown below. Do NOT contact the A-E Firm or Engineering personnel directly. Doing so will only delay the response to your question.
Subject Line: Reference No. W50S84-20-R-0002 for MBMV202794 Replace Boilers, Building Email: __________________________________
INQUIRIES SHALL BE SUBMITTED VIA EMAIL AND INCLUDE THE FOLLOWING
INFORMATION:
Date of Proposal Inquiry:
From: ______________________________ Company Name: ___________________________ Phone Number: ____________________________ Email address: _____________________________
Proposal Inquiry: Be specific as to part of solicitation you are questioning.
3.2. Any explanation desired by an offeror regarding the meaning or interpretation of the solicitation, or proposals, drawings, specifications, etc. must be requested in writing and with sufficient time allowed for a reply to reach offerors before the submission of their offer.
3.3. The Contracting Officer reserves the right to address questions received after the fifth day prior to solicitation closing with those offers deemed compliant and/or in the competitive range after closing. All questions and requests for information (RFI) must be received NOT LATER THAN the fourth working day prior to closing and will be posted not later than two working days prior to closing. OFFERORS ARE STRONGLY ENCOURAGED TO SUBMIT
QUESTIONS EARLY IN THIS PROCESS.
3.4. Any interpretations made will be in the form of an amendment of the solicitation, drawings, specifications, etc., and will be furnished to all prospective offerors via posting to https://beta.sam.gov
3.4.1. Receipt by the offeror must be acknowledged in the space provided on the SF 1442 or by returning a signed copy of the amendment by the time set for receipt of proposals. Explanations or instructions given in a form other than an amendment to the solicitation shall not be binding.
Questions (on a non-attribution basis) and answers shall be furnished to all prospective offerors via the web site.
3.4.2. For security reasons, all technical and engineering data related to this solicitation will be distributed using the https://beta.sam.gov (Formerly called, Federal Business Opportunities (www.fbo.gov) system, FedBizOpps) https://beta.sam.gov is a web-based dissemination tool designed to safeguard acquisition-related information for all Federal agencies. Interested bidders/offerors must register with https://beta.sam.gov before accessing the system. Registration instructions can be found on the https://beta.sam.gov (Please note the registration for access to the secure site takes approximately 15 business days, so plan accordingly.)
4. AMENDMENTS
4.1. The right is reserved, as the interest of the Government may require, to revise or amend, the specifications or drawings or both prior to and/or after the date set for receipt of proposals as necessary. Such amendments, if any, will be announced by an amendment or amendments to this Request for Proposal. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s). All information relating to this RFP, including pertinent changes/amendments and information prior to the date set for receipt of proposals will be posted at https://beta.sam.gov
4.2. Offerors are strongly cautioned to check this site frequently and to “refresh” their web page to ensure they have the latest information. Note: Historically, local “plan rooms” do not disseminate amendments to solicitations in a timely manner.
5. HAND CARRIED/MAILED PROPOSALS – EMAILED PROPOSALS
5.1. Hand carried and mailed proposals must be submitted to the following location:
127th MSC Contracting Division 43200 Maple Street, Bldg. 105 Selfridge ANGB, MI 48045
5.2. Hand carried and mailed proposals must be received prior to the day/time established for receipt of proposals, and labeled W50S84-20-R-0002 for MBMV202794 Replace Boilers, Building 6911
*HAND CARRIED: Due to the COVID-19, this is not recommended. Members will have to gain access to the base, and follow all Selfirdge ANGB, State (Executive Orders), and CDC Guidelines / associated with COVID-19. HAND CARRIED offers may be delivered, or hand carried, but ONLY the last hour –prior to the Due Date / Time and only if access to the Base is allowed.
*MAILED: Due to COVID-19, it is recommended this is not utilized, as delivery times to Selfridge ANGB, MI may have increased. The Government will not be responsible for late offers.
*E-MAIL: Offerors are encouraged to utilize email to submit offers.
*Individuals not following applicable COVID 19 procedures in place at the time proposals are due are subject to be removed from SANGB.
At this time, a Mask is required when 6’ of Social Distancing cannot be maintained. Anyone entering the base shall have a Mask at this time.
5.3. Offerors are cautioned that approval to enter the base must be obtained prior to the closing date for receipt of proposals. Follow the procedures outlined above in paragraph 2 for entry.
Delays are probable at the entry point and should be accounted for. Late receipt of proposals due to base entry delays may not be deemed excusable and the Contracting Officer may declare the proposal late and remove it from consideration.
5.4 Proposals may be E-Mailed and must be received prior to the day/time established for receipt of proposals. Emailed proposals must be emailed to ALL THREE of the following addresses:
a) steven.stocking@us.af.mil
b) michael.kitchell.1@us.af.mil
c) usaf.mi.127-wg.mbx.msc-construction@mail.mil
Please be sure the email subject line references the Solicitation # and Title. W50S84-20-R-0002 for MBMV202794 Replace Boilers, Building 6911
6. BID BONDS – Bid Guarantee is required when Payment and Performance Bonds are required. See Clause 52.228-1.
6.1. Payment protections are required when actual contract value exceeds $35,000 but less than $150,000. See Clause 52.228-13.
6.2. Payment and Performance Bonds are required when actual contract value exceeds $150,000.
See Clause 52.228-15.
7. WAGE DETERMINATION
7.1. The Construction Wage Rate Requirements, formerly known as Davis Bacon Wage Rates, are applicable to this project. Current prevailing wage determination(s) at time of issuance of solicitation are Building, Number: MI20200079 07/24/2020 for Calhoun County, Michigan (49037). In the event the current prevailing Wage Determination is changed by the Department of Labor prior to the closing date of the solicitation, the most current wage determination is in effect. Should the wage rate change after closing, but prior to award, the updated Wage Determination will be incorporated by amendment and issued to all offerors that have not been eliminated from the competition. If applicable, these offerors/contractors will be given a reasonable opportunity to provide revised proposals solely to amend proposals due to Wage Determination changes. If the wage determination modification does not change any affected wage rates, then the provisions of FAR 22.404-5(c)(4) will apply.
7.2. Applicable wage rates can be found at https://beta.sam.gov
8. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS
This RFP does not commit the Government to pay costs incurred in preparation and submission of initial and subsequent proposals or for other costs incurred prior to award of a formal contract.
9. REMOVAL OF SECTIONS AT TIME OF AWARD
Sections 00100, 00110, 00120, 00600 and all exhibits will be physically removed as a result of an award, but will be deemed to be incorporated by reference in that award.
10. DISPOSITION OF UNSUCCESSFUL OFFERS
In compliance with FAR Subpart 4.8, the Government will retain one copy of all unsuccessful offers. The Government will destroy extra copies of unsuccessful offers.
No destruction certificate will be provided.
11. INFORMATION REGARDING AVAILABILITY OF UTILITY SERVICES
The Contracting Officer has determined that Government-operated utilities are adequate and will be furnished to the contractor without charge where existing outlets are available. The contractor is responsible for installing temporary service outlets, as necessary, at its expense in accordance with the clause entitled “Availability and Use of Utility Services” (FAR Clause 52.236-14). The following utilities will be available; Water, Electricity.
12. EXCEPTIONS
If the offeror takes exception to any of the requirements specified in this solicitation, the offeror shall clearly identify each such exception and include a complete explanation of why the exception was taken and what benefit accrues to the Government. All exceptions to the solicitation requirements (Sections 00010 through 01000) and supporting rationale shall be included in an addendum to the proposal and clearly labeled "Exceptions". An addendum is only required if the offeror takes exception to any requirement in the solicitation. (The Addendum does not have a page limitation, but shall only include information relevant to exceptions taken to the solicitation requirements.) The Government will assume an offeror takes no exceptions to any solicitation requirement if the offeror does not submit an Addendum identifying exceptions.
Offerors are advised that solicitation requirements are not necessarily negotiable and such exceptions may render an offeror's proposal unacceptable and ineligible for award.
13. CLAUSES
13.1. Clauses and provisions from the Federal Acquisition Regulation (FAR) and supplements thereto are incorporated in this document by reference and in full text. Those incorporated by reference have the same force and effect as if they were given in full text.
13.2. Clauses and provisions in this document may not appear in consecutive order.
14. BRAND NAME REQUIREMENTS
N/A
15. JOINT VENTURE REQUIREMENTS
Parties wishing to propose as a joint venture must submit, with the Pro Forma documents, an executed copy of the joint venture agreement. The joint venture agreement shall be executed in accordance with FAR 4.102(d). Each joint venture partner shall submit evidence satisfactory to the Contracting Officer that its Board of Directors has approved its participation in the joint venture or by an instrument of similarly binding character in the case of an unincorporated entity. Offerors are reminded that to obtain an award the awardee, to include a joint venture, must be registered in the System for Award Management (SAM) database. Applicable to set-aside solicitations: Joint Ventures must meet applicable size standards (See FAR Subpart 19.1).
Submit with the proposal any size determination for the Joint Venture entity received from the Small Business Administration. A Joint Venture where-in one party is not a small business may be referred to the Small Business Administration ( IAW FAR 19.302 (b)) to determine eligibility. All questions regarding Joint Ventures must be directed to the Small Business Administration (SBA) and not the Contracting Officer.
End of Section 00100
SECTION 00110 SUBMISSION REQUIREMENTS AND INSTRUCTIONS
1. PROPOSAL PREPARATION INSTRUCTIONS
1.1. These instructions prescribe the format of proposals, and describe the approach for the development and presentation of the proposal data. They are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals. Carefully review this section prior to commencing proposal preparation. All solicitation amendments must be acknowledged in accordance with Section 00100.
1.2. Offerors are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete proposal. Failure to furnish a complete proposal, at the time of proposal submission, may result in the proposal being unacceptable to the Government and eliminated from consideration for award.
2. PROPOSAL CONTENT
2.1 Prospective offerors shall submit the proposal in two separate sections.
Section 1:
Part 1-Introductory Page/(SF) 1442 Part 2- Price Proposal
Section 2:
Part 1-Technical Solution Part 2- Past Performance
3. SECTION 1
3.1 Provide an introductory page to include CAGE Code, DUNS Number, Tax Identification Number (TIN), points of contact, authorized negotiators, contact phone, facsimile numbers, and email addresses.
3.2 Complete in its entirety the “Offeror” portion of the Standard Form (SF) 1442. An official having the authority to contractually bind your company must sign the SF 1442 in accordance with FAR 4.102.
3.3 Offeror shall provide all price/cost information necessary to provide a meaningful basis for Government's analysis and evaluation of price/cost for the project.
4. SECTION 2
4.1 The Technical Solution consists of one factor: Construction Schedule/Work Plan.
Provide a construction schedule/ work plan with a period of performance (POP) not to exceed 120 days after NTP, with all “Fast Tracking” areas clearly identified if proposed.
(Use 15 Sep 2019 for proposal schedule NTP). The schedule/work plan shall be task oriented, capturing all Statement of Work (SOW) requirements and indicate dates by which milestones are to be achieved. The offeror shall use either the AF Form 3064 or a critical path scheduling approach and the schedules shall be graphically represented.
4.2 Past Performance- Submit no more than three (3) references for projects with similar scope/magnitude completed within the last 5 years. The references are to assist the Contracting Officer in the evaluation of past performance.
Provide the following information requested in this format for each of the projects/contracts being submitted as a reference project. Projects may be on going and cannot have been completed any earlier than 5 years prior to the solicitation issue date.
Project/Contract Title:
Project Specifics:
Description of Effort as Prime Contractor or Subcontractor Contract Number Original Contract $ Value Current/Final Contract $ Value If amounts above are different, provide a brief description of the reason:
Completion Date:
Original Scheduled Completion Date:
Final Completion Date:
If original completion date and final completion dates are different, provide a brief description of the reason:
Provide brief description of the work performed under the contract and describe why you believe the work is relevant to this solicited project.
Provide a Point of Contact for Owner/Government agency Contracting Officer and or Inspector for each reference project; include a current phone number and Email address.
End of Section 00110
SECTION 00120 PROPOSAL EVALUATIONS AND BASIS FOR AWARD
1. GENERAL INFORMATION
1.1. This solicitation is for a Firm Fixed Price Contract. The Government intends to award a single contract to a qualified Small Business Offeror deemed responsible in accordance with the Federal Acquisition Regulation (FAR), whose proposal conforms to all the RFP's requirements and is judged to represent the Best Value to the Government in accordance with the evaluation scheme set out in this solicitation.
Best Value offer will be determined on the basis of the lowest priced proposal meeting the acceptability standards for non-priced evaluation factors.
1.2. The evaluation process will be conducted in accordance with FAR 13.106(b). Offers will be evaluated using the criteria listed in “Evaluation Factors for Award.” Noncompliance with the RFP requirements may raise serious questions regarding an offeror’s technical ability, past performance and/or pricing and may be grounds to eliminate the proposal from consideration for contract award. Failure to include all information requested may adversely affect the evaluation. A proposal that merely reiterates or promises to accomplish the requirements of the RFP will be considered unacceptable. A proposal that is orderly and sufficiently documented will be easy for the Government to understand and will enable the Government to perform a thorough and fair evaluation.
1.3. The Contracting Officer will begin the evaluation process by conducting a proposal compliance review for all timely-received proposals for determination of basic proposal adequacy prior to providing the proposals to the evaluators. Failure to provide a complete proposal may result in the proposal being removed from further consideration for award.
1.4. Although the assessment of Past Performance as a specific evaluation factor is separate and distinct from the Determination of Responsibility required by FAR Part 9, Past Performance information obtained herein will be used during the Government’s responsibility determination. The Government also reserves the right to obtain additional information solely for the purpose of making a responsibility determination from all offerors after receipt of proposals.
2. EVALUATION FACTORS FOR AWARD
Evaluation Factors, the Best Value offer will be determined on the basis of the lowest priced proposal meeting the acceptability standards for non-priced evaluation factors.
Non-Priced Evaluation Factors listed below will be evaluated on an acceptable /unacceptable basis:
• Technical Solution
• Past Performance
TECHNICAL
The Technical Solution Evaluation consists of one factor: Construction Schedule/Work Plan.
Acceptability will be based on the offeror’s demonstration of execution of the construction schedule/ Work Plan outlining completion within the desired POP. The schedule/ work Plan shall capture all SOW requirements, execution timelines, and critical path items. The
Schedule/ work plan must demonstrate an overview of how the project will be completed in accordance with the SOW and within the prescribed period of performance.
RATING DESCRIPTION
Acceptable Proposal clearly meets the minimum requirements of the solicitation Unacceptable Proposal clearly does not meet the minimum requirements of the
PAST PERFORMANCE
The Government will evaluate responses from submitted references and/or any other record available, for the quality, timeliness, and management of the offeror's past performance considering, relevancy, context, and trends on recent projects (within the last 5 years). If there is information which deems past performance as less than acceptable for ongoing projects, the offeror will either have been already afforded an opportunity to offer a rebuttal of this information or will be provided such an opportunity in order for the information to be evaluated. The government may contact an offeror for questions on past performance. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available, the offeror may not be evaluated favorably or unfavorably on past performance and their record will be considered unknown.
IAW FAR 13.106-2(b)(3)(ii), evaluation of past performance will be based on one or more of the following:
• The contracting officer’s knowledge;
• Customer surveys, and past performance questionnaire replies;
• The Government wide Past Performance Information Retrieval System (PPIRS) at www.ppirs.gov; or
• Any other reasonable basis
RELEVANT: Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
NOT RELEVANT: Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
Past Performance Evaluation Ratings
RATING DESCRIPTION
Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record
Unacceptable Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.
PRICE
The proposed price will be evaluated per FAR 13.106-3(a). IAW FAR 4.102. One copy of the SF 1442 is required to have an original signature. Section 00010 – Insert the price/cost associated with the project in the line items. All line items (CLINs) must be priced.
3. AWARD
3.1. A written award or acceptance of offer mailed, or otherwise furnished to the successful offeror within the time for acceptance specified in the offer shall be deemed to result in a binding contract without further action by either party.
3.1.1. To establish its responsibility, the apparent low offeror may be requested by the Government prior to award, to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and available plant to be used in performing the work. This action may be requested to determine if the contractor is responsible.
End of Section 00120
SECTION 00600 - REPRESENTATIONS & CERTIFICATIONS
The following have been added by reference:
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
AUG 2019
SECTION 00700 - CONTRACT CLAUSES
The following have been added by reference:
52.243-5 Changes and Changed Conditions APR 1984
(End of Summary of Changes)