Base Survey RFIs v2.xlsx
XLSX spreadsheet 12 KB Posted
- Attached to
- Boundary Survey
- Solicitation number
- W50S82-24-Q-A008
About this file
This document appears to be a set of Questions and Answers related to a federal contract opportunity for a Boundary Survey at the Maryland Air National Guard (ANG) licensed property on Martin State Airport in Baltimore, Maryland.
The key details are:
- The purpose of the project is to identify the boundaries of the ANG licensed property and the encroachment area posed by the Lockheed Martin Groundwater Treatment Plant.
- The vendor shall conduct a National Society of Professional Surveyors (NSPS) survey to establish and record the boundaries of the ANG licensed property.
- The solicitation requires the licensed boundary survey to be recertified every five years.
- The contracting agency is the Department of the Army Maryland Army National Guard.
- The solicitation number is W50S82-24-Q-A008.
- The document provides clarification on items such as the lease agreement, reference maps, orthometric elevations, and the use of UAS for site mapping.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| QUESTIONS | ANSWERS |
| What is considered the Maryland ANG licensed property? (Is this the area as shown on the Perimeter Plat MDANG leased Area dated 2015) | YES |
| Will the lease agreement #DACA-31-5-86-249 be available for review? Along with the Amendments? | YES. IT IS DACA-31-3-87-177 |
| Is there a new title report? | NO |
| Are the 3 reference maps available? |
1-Metes and Bounds plat of Martin Co. Property -1975 2-Property Map - Military Lease Exhibit - 2004
| 3-Property Corner Encroachment Location and Boundary Verification Survey - 1992 | YES | |
| Page 6 of the SOW - Item 2.2.1 - Orthometric Elevations GEOM 2012....Please elaborate on this......Geoid 12? | This just provide the elevation of each point. | |
| Is the orthometric height specified in section 2.2.1 of the SOW meant to read Geoid 2012? | No. This just provide the elevation of each point. | |
| Is updated site mapping required or only the encroachment layout and the perimeter boundary? | Only the encroachment layout and the perimeter boundary is required. The end goal is to verify the existing lease hold and the encroachment, to see how many acres will be returned to the state. | |
| Would the use of UAS be permitted if updated site mapping is required? | NO | |
| Is Section 00 45 00 Representations and Certifications considered an additional document to the three requested volumes? | Updated to "Section K." Add to Cover Letter / Volume I | |
| Can you verify that “Table 1” as referenced under “Submission” on page 11 of the solicitation is referring to the table on page 3 of the same document? | Refefence Section H & L |
File details come from the government source that posted it. Updated .