This document is a Request for Information (RFI) #2 for Solicitation W50S7U-24-Q-0001, "CES Construct Tower Foundation". The RFI provides responses to several questions related to the project, including the availability of a soil bearing report, removal of spoils, potential contaminated soils, site fencing and silt fencing requirements, and the need for special permits. The related federal contract opportunity is for the construction of a tower foundation, with a Solicitation Number of W50S7U-24-Q-0001, issued by the Department of the Army National Guard. No additional details on the required products or services, response dates, award dates, pricing terms, or set asides are provided in the given information.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION W50S7U-24-Q-0001
CES Construct Tower Foundation RFI #2
Question:
1. Please provide the soil bear report. No geotechnical report available for vicinity of project area.
2. Please confirm that you want the spoils, or excess soils removed from the site or left on site. Spoils to be removed from site.
3. Are there any contaminated soils that we need to plan for at this location? No.
4. Will this project require site fencing? No site fencing required. Barricade and protect foundation work area per OSHA guidelines.
5. Will this project require silt fencing or other water run off protections? No silt fencing requirements unless soil is left on site during duration of project and then hauled off later. Contractor will need to put in place proper storm water pollution controls if so.
6. Please confirm that no special permits will be needed if all activities are below 60’ the finished ground in this location. No special permit requirements for this project.