RFI 1 CES Repair Water Damage Building P-46.pdf

PDF 121 KB Posted

Attached to
183 CES Repair Water Damage Building P-46
Solicitation number
W50S7U-23-B-0003
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT DCFT232112

SOLICITATION/IFB # W50S7U-23-B-0003/CES Repair Water Damage Building P-46

REQUEST FOR INFORMATION (RFI) #1 18 JULY 2023

Q1. We are being told that the existing ACT can not be matched, please clarify if the three rooms shown on the ceiling plan should receive all new ceiling tiles based on the base standard?

A1. Yes, the three rooms shown on ceiling plan should receive all new ceiling tiles.

Contractor to remove all ceiling tiles from all three rooms and save ceiling tiles for the

Government. New ceiling tiles to be 24” x 24” x 5/8”, Tegular, NRC minimum rating 0.55, Medium Texture Panels, Class A Fire Rated, Type III mineral base with painted White finish, and sag/humidity resistance to match base standard.

File details come from the government source that posted it. Updated .