This sole source justification document outlines a proposed contract award to Schlenker & McKittrick Architects, P.C. for Type C architect-engineer services during construction of roofs at two buildings for the Montana Air National Guard. The services include reviewing contractor submittals, attending meetings, inspecting construction progress, and ensuring the work follows the approved design. As the incumbent that previously performed design services for this project, only Schlenker & McKittrick Architects has the expertise and familiarity with the plans required to provide the construction-phase support and avoid substantial duplication of costs from another firm having to engage and familiarize itself with the project. The contract value is estimated at $ and award is proposed under an exception to full and open competition when only one responsible source will satisfy the agency's requirements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor: Schlenker & McKittrick Architects, P.C. (SMA) Program/Equipment: Repair and Replace Roofs Bldgs 62 and 79 Type C A-E Services

CUI

JUSTIFICATION REVIEW DOCUMENT

FAR PART 13 SOLICITING FROM A SINGLE SOURCE

Program/Equipment: Architect-Engineer (A-E) Type C Services in Support of the Repair and Replace Roofs Bldgs.62 and 79. Montana Air National Guard in Great Falls, MT.

Authority: Federal Acquisition Regulation (FAR) 13.106-1(b)(1), Soliciting from a Single Source Below the Simplified Acquisition Threshold.

Amount: Estimated at $

Prepared by: Anthony Barille (406) 791-0264 Contracting Officer 28-June-2023 anthony.barille@us.af.mil

Contracting Officer: Anthony Barille (406) 791-0264 Contracting Officer 28-June-2023 anthony.barille@us.af.mil

Engineer/COR: Aaron Jewett (406) 791-0516 Engineer/COR 28-June-2023 aaron.jewett@us.af.mil

FAR Part 13 Justification Review Document Soliciting From a Single Source

1. Contracting Activity: Montana Air National Guard, 2800 Airport Ave B, Great Falls, MT 59404.

2. Description of Action: The Montana Air National Guard requests a sole source contract award with Schlenker & McKittrick Architects, P.C. (SMA) (CAGE: 0LA26). The

Government projects award for 2023; Fiscal Year 2023 Facilities Sustainment, Restoration and Modernization (SRM) funds will be used. An acquisition plan is not required because this procurement does not meet the threshold at Defense Federal

Acquisition Regulation Supplement (DFARS) 207.103(d)(i)(B).

3. Description of Services: This is an Architect-Engineer (A-E) requirement to perform Type C services in support of the construction of the Repair and Replace Roofs on buildings 62 and 79 at the Montana Air National Guard, 2800 Airport Ave B, Great Falls, MT, 59404. The construction contract is scheduled for a July 2023 award date. The period of performance of this A-E action will mirror the construction contract award (reference solicitation № W50S7L-23-B-0001) of 150 calendar days after issuance of the notice to proceed. There are no options required for this acquisition. The independent government estimate for this contract is $ .

Type C services include documenting and providing answers to Contractor’s requests for information (post award), review of submittals, attendance and records at job progress meetings, review of lab results, preparation of as-built drawings, multiple site visits to inspect the progress and quality of construction to ensure the construction contractor is following the approved design.

4. Authority Cited: 41 U.S. Code § 1901, as implemented by FAR 13.106-1(b)(1), Soliciting from a Single Source Below the Simplified Acquisition Threshold.

5. Reason for Authority Cited: This requirement is a follow-on action to Schlenker & McKittrick Architects, P.C. (SMA) (CAGE: 0LA26). The requirement was previously negotiated and awarded by the Montana Air National Guard. It included Type A & B, and C services for the design of the repair and replace roofs for Buildings 62 and 79.

Type A services included the basis of design (specifically the design intent), the development of the project concept, and associated site investigations. The Type B services included the design narrative and the development of the construction documents. The Type C services were never completed under this contract since the initial construction contract was not funded at the time.

Since Schlenker & McKittrick Architects, P.C. (SMA) (CAGE: 0LA26) designed and certified the drawings and specifications, it is economical and efficient to award the Type C services as a sole source follow-on contract. There would be a substantial duplication of cost that would not be expected to be recovered through a new competition for another A-E firm to engage and familiarize themselves with this project along assuming responsibility for Schlenker & McKittrick Architects, P.C. Plans and Designs. This duplication of cost is estimated to be approximately 20% of the estimated contract value of $ (approximately $ ). This duplication is estimated since the in-house disciplines (to include the Project Manager, Project Architect, Mechanical Engineer, Electrical Engineers, Structural Engineers, etc.) would each need to study and investigate the prior A-E submittals. This $ is approximately double the amount for the in-house disciplines listed in the Independent Government Estimate. The duplication of costs also include the cost to post a new A-E synopsis and conduct a new evaluation of the most highly qualified vendor which can take months of work for several Government employees to include a Contracting Officer, Contract Specialist, Selection Board members, a Selection Board Chairperson, and a Contract Attorney. These positions combined can easily account for at least $ worth of labor hours (assuming 120 hours for a Contract Specialist, 40 hours for a Contracting Officer, 80 hours for a Selection Board Chairperson, 40 hours for three (3) members of a Selection Board, and 10 hours for a Contract Attorney, all at an conservative average of $ /hour). In addition to the duplication of costs, the time associated with a new A-E and a new contract acquisition would significantly influence and delay the actual repair and replacement of roofs on buildings 62 and 79, which is scheduled to start late Summer 2023. The delay could potentially take six months, which would add significant cost and schedule risk to the NGB.

There is also tremendous performance and liability risk associated with another A-E firm taking over the Type C services for a project that was already certified. Having the original designer, Schlenker & McKittrick Architects, P.C. (SMA), on contract to perform the construction phase services is necessary for the Government to ensure responsible answers to the following questions: Is the constructed facility based on the design both maintainable and operable? Do the plans reflect the true conditions and are the plans clear, sufficiently detailed, accurate and coordinated? Is the design constructible and have minimal errors? Is the A-E responsive in correcting errors and omissions of the engineering services? Can the A-E perform timely and accurate review of shop drawings and submittals? Is the A-E responsive in providing technical assistance as required by the contract? An award to a new A-E other than Schlenker & McKittrick Architects, P.C. (SMA) would increase the risk associated with these issues and potentially affect the Government’s rights under FAR 52.236-23, Responsibility of the Architect-Engineer Contractor, if another A-E were to represent or attempt to revise the current drawings and/or specifications. This clauses states that the “Contractor shall be responsible for the professional quality, technical accuracy, and the coordination of all designs, drawings, specifications, and other services furnished by the Contractor”.

However, if a new A-E were to make recommendations during the Type C services to revise or deviate from the original drawings or specifications, any liability resulting from those changes could not be attributed to the original A-E. This could potentially create a dangerous and complicated scenario if the Government needed to hold the responsible A-E party liable for any errors or deficiencies in the designs, drawings, and/or specifications.

6. Efforts to Obtain Competition: No efforts were made to obtain competition for this one-time requirement due to the rationale described in paragraph 5. This Justification Document will be made public through the Government Point of Entry

7. Actions to Increase Competition: No actions were taken to increase competition since this is a one-time requirement following on to a previously competed project.

8. Market Research: Market research was conducted by the contracting office on 28 June 2023. It included a detailed search in the Small Business Administration (SBA) Dynamic Business Search website as well as a search of the AbilityOne website. The research was concluded as follows: There are 118 active vendors under NAICS 541330, located in Montana. Based on these findings it was determined that there are many large and small businesses, to include vendors of all socio-economic categories, capable of fulfilling this need for the Government. Unfortunately, all firms, other than Schlenker & McKittrick Architects, P.C. (SMA), would likely carry more cost and performance risk than Schlenker & McKittrick Architects, P.C. (SMA). Since Schlenker & McKittrick Architects, P.C. (SMA) previously completed the Type A and A services which included the basis of design (specifically the design intent), and the development of the project concept, and associated site investigations. Along with the Type B services which included the design narrative and the development of the construction documents for the forthcoming construction project, a Justification and Approval (J&A)* document will be completed with the recommendation to award a sole source contract to Schlenker & McKittrick Architects, P.C. (SMA). The authority will be issued under 10 U.S. Code § 2304(c)(1), Only one responsible source and no other services will satisfy agency requirements. This J&A will illustrate that it is economically feasible and efficient to award the Type C services as a follow-on to the A-E that completed the Type A and Type B services. An award to any other contractor would result in substantial duplication of cost and added performance risk since that new A-E would not be familiar with the repair and replacement of roofs on buildings 62 and 79.”

*Note: Due to the size of the acquisition (under the Simplified Acquisition Threshold), the market research should have used the term “Justification Document” versus “Justification and Approval” and the authority should have been identified as “41 U.S.

Code § 1901, as implemented by FAR 13.106(b)(1), Soliciting from a Single Source Below the Simplified Acquisition Threshold”.

9. Interested Sources: A listing of interested sources was not solicited or received during the market research phase of this acquisition.

10. Other Facts: No other facts pertain to this J&A.

11. Technical Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.

Typed Name: Aaron Jewett Signature:

Title: Engineer/COR Date:

12. Requirements Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.

Typed Name: Aaron Jewett Signature:

Title: Engineer/COR Date:

13. Fair and Reasonable Cost Determination: I hereby determine that the anticipated cost or price to the Government for this contract action will be fair and reasonable.

This determination will be made using the following: Cost Analysis Price Analysis

Should Cost IGE Audit: Other

As part of this basis, certified cost or pricing data:

will be required.

will not be required and the following exception applies (FAR 15.403):

Prices that will be agreed upon are based on adequate price competition.

Prices that will be agreed upon are based on prices set by law or regulation.

A commercial item is being acquired.

A waiver has been granted by the head of the contracting activity (HCA) in accordance with DFARS PGI 215.403-1.

The contract action is a modification to a contract or subcontract for commercial item(s).

The estimated cost of the contract action is less than the threshold for certified cost or pricing data.

Typed Name: Anthony F. Barille Signature:

Title: Contracting Officer Date:

14. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.

Typed Name: Anthony F. Barille Signature:

Title: Contracting Officer Date:

Amount Estimated at:
2023-09-08T12:48:12-0600
JEWETT.AARON.MICHAEL.1246779410
2023-09-08T12:48:38-0600
JEWETT.AARON.MICHAEL.1246779410
Cost Analysis: Off
Price Analysis: Off
Should Cost: Off
IGE: Off
Audit: Off
Other: Off
will be required: Off
will not be required and the following exception applies FAR 15403: Off
Prices that will be agreed upon are based on adequate price competition: Off
Prices that will be agreed upon are based on prices set by law or regulation: Off
A commercial item is being acquired: Off
A waiver has been granted by the head of the contracting activity HCA in: Off
The contract action is a modification to a contract or subcontract for: Off
The estimated cost of the contract action is less than the threshold for: Off
2023-09-08T12:53:44-0600
BARILLE.ANTHONY.FRANK.1266473628
2023-09-08T12:53:23-0600
BARILLE.ANTHONY.FRANK.1266473628
Text1: 08-Sep-2023
Text2: 08-Sep-2023
Text3: 08-Sep-2023
Text4: 08-Sep-2023