W50S7K-24-R-0003 RFI1.pdf
PDF 78 KB Posted
- Attached to
- CRTC Commercial Internet
- Solicitation number
- W50S7K-24-R-0003
About this file
This document contains a solicitation for commercial internet services. The Mississippi Army National Guard is seeking to establish a dedicated fiber optic commercial internet connection with 1 gigabit speeds to be installed at the Base Communications Shop building. The period of performance is one base year starting February 9, 2024 through February 8, 2025 with four additional one-year option periods. Bids are due by January 19, 2024 and should include pricing for the base year as well as four option years on the bid sheet. Award will be made based on a technical evaluation of the proposed solution and lowest price meeting requirements. The incumbent provider is Southern Light, LLC.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Description of Requirement for Fiber Internet Service-FY24.pdf | ||
| Bid sheet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W50S7K-24-R-0003 RFI #1
Can I get the address for the base communica�on shop building 154? 4715 Hewes Avenue, BLDG 154 Gulfport, MS 39507
Is this to be installed at the commercial Dmark? Yes
Is there rack space provided for this new circuit? Yes
How many sta�c IP addresses are you looking for? DHCP only
Do you require at fiber handoff? Copper
What type of handoff do you require? (1000Mpbs, LC, MM) Copper (RJ-45)
I would also like the size of the Internet connec�on required. 1Gb
Who is the incumbent? SOUTHERN LIGHT, LLC
Would you like a dedicated line for the dorms? How many dorms? We are sourcing the internet connec�on at the rates listed in the descrip�on of requirement, we handle all distribu�on throughout the installa�on.
Do you want the bid to include the annual charges for 5 years or just how much it would cost to do the work? Bids should include base year and four op�on year periods. All fees and charges should be shown on the bid sheet in terms of monthly and total annual costs.
File details come from the government source that posted it. Updated .