This document contains a request for information (RFI) and related federal contract opportunity solicitation for fencing repairs at a military training facility in Mississippi. The RFI seeks clarification on the total length of fencing, configuration details, post installation requirements, and gate type. It provides responses confirming 554 linear feet of fencing, specifying top tension wire and bottom rail configuration, outlining core drilling and concrete encasement for posts on existing slabs, and identifying the 32-foot gate as a swing gate. The federal contract opportunity involves renovating and repairing perimeter fencing at the facility in accordance with the statement of work. The solicitation is subject to Construction Wage Rate Requirements. The prevailing wage determination applies to Harrison County, Mississippi. The period of performance and response deadline are not specified.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JTVE242308- FY24 FENCE PROJECT RFI #1

1. **Total Length of Fence:** Could you confirm whether the total length of the fence is 554 linear feet, inclusive of the 170 feet men�oned, or if the 170 feet is separate, resul�ng in a total of 724 linear feet?

170 LF of fence is separate portion of the project (255th location in Exhibit 5)

2. **Fence Configura�on:** For the proposed fence, could you please clarify if it will include a top rail?

If not, are you considering the inclusion of tension wire?

No top rail. Fencing will have top tension wire and bottom rail. Refer to UFC 4-022-03, Dated 1 October 2013. SOW has been updated to clarify.

3. I have review the writen spec. sec�on 5.0 requirements: 5.2.2 States to use botom rail

5.2.7 States to use fabric to tension wire top and botom Please clarify which one is what they want to use.

No top rail. Fencing will have top tension wire and bottom rail. Refer to UFC 4-022-03, Dated 1 October 2013. SOW has been updated to clarify.

4. 5.6.1 States that the mew fence will be constructed on a exis�ng slab will we be required to core drill or use plated posts?

SOW Updated 5.2.9 All posts to be set where there is an exis�ng concrete slab will be core drilled and set a min. of 24” and encased with concrete.

5. 5.6.2 the 32’ vehicle gate is it a slide gate or double swing gate?

32’ gate will be swing gate

6. 1.3.4.2 An� - Terrorism (AT) Level I Awareness Training, This something we take on line or is a class given on base?

These classes are virtual and taken individually by your employees working on site. Level I An�terrorism Awareness Training (jten.mil) htps://jkodirect.jten.mil/pdf/atl1/launch.html https://jkodirect.jten.mil/pdf/atl1/launch.html