Pre-Proposal Meeting Minutes.pdf
PDF 185 KB Posted
- Solicitation number
- W50S7J21B0003
- Issued by
-
Department of the Army National Guard
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
MISSISSIPPI AIR NATIONAL GUARD
HEADQUARTERS, 186TH AIR REFUELING WING (AMC)
MERIDIAN, MISSISSIPPI
MEMORANDUM FOR RECORD 11 March 2021
FROM: 186th ARW/MSC
SUBJECT: MINUTES OF PRE-PROPOSAL CONFERENCE AND SITE VISIT, SOLICITATION W50S7J21B0003
– MDVL212102 - RENOVATE NORTH ADMINISTRATIVE WING OF BLDG. 104 AT THE 186TH ARW
DATE: 11 March 2021 AT 0900 HOURS
1. The contractors attending the meeting were Maven Construction, Gulf Coast Solutions, Tew HVAC, D&H Construction, Elite Flooring, Inc., Gatorphant Industries, LLC, Poly Kai Services, Perry Construction Co., Fireline, Inc., Overflow Service, LLC, Ratcliff Electric, McClain Plumbing, and J&J Contractors. The following Government Representatives attended the subject meeting:
MSgt Ned McCormick, Maj. John Garrett, Mr. Eric Bratu, Mr. Jeremy Shields, MSgt Jeremy Pilgrim, SMSgt Christopher Null, MSgt Brian Turbyfill, TSgt Sharendra McClendon,
2. The following items were discussed during the Pre Proposal Conference:
The proposed contract period is: 90 days. Procedures to access the base were discussed. A power point presentation slide presentation on the project specifies the project. Question and answers from the conference and site visit are below.
Question: A contractor asked if lay-down/staging areas will be made available to the contractor.
Answer: Lay-down/staging areas will be identified during the pre-construction conference for each project site. Lay-down/staging areas will be adjacent to the project facility but may or may not be placed immediately adjacent to an exterior door and must be maintained and kept neat.
Question: Does the project require any plumbing work?
Answer: Yes, refer to Statement of Work and Construction Plan Set for mechanical/plumbing requirements to include demolition, modification, and new installation.
Questions must be submitted in writing via email to ned..mccormick.2@us.af.mil or jared.garner@us.af.mil will be answered on a non-attribution basis. If necessary addendums will be issued.
3. The pre-proposal conference and site visit concluded at 1030 hours.
NED L. MCCORMICK, MSgt, MS ANG 186th ARW/MSC Contracting Officer mailto:ned..mccormick.2@us.af.mil mailto:jared.garner@us.af.mil
| 2021-03-11T16:29:40-0600 | |
| MCCORMICK.NED.LOUVIER.III.1185464276 |
File details come from the government source that posted it. Updated .