A02 SOW - AFE Mezzanine Rv1.docx
DOCX document 43 KB Posted
- Attached to
- mezzanine safety rails and ladder system
- Solicitation number
- W50S7E20Q5017
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FAR 52.204-24 Representation.docx | DOCX document | |
| Mezz 6.jpg | JPG image | |
| Mezz 5.jpg | JPG image | |
| Mezz 3.jpg | JPG image | |
| Mezz 4.jpg | JPG image | |
| Mezz 1.jpg | JPG image | |
| Mezz 2.jpg | JPG image | |
| SOW - AFE Mezzanine.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MINNESOTA AIR NATIONAL GUARD
HEADQUARTERS 133RD AIRLIFT WING (AMC)
SAINT PAUL MINNESOTA
25 August, 2020
STATEMENT OF WORK
1. Project Title: REPLACE MEZZANINE SAFETY RAILS IN BLDG 641
| 2. Project Location: | 133d Airlift Wing |
| Minnesota Air National Guard Base |
641 Spitfire Ave St Paul, MN 55111
4. Description of Work: This project involves the work as described herein to be accomplished at the above location, with all labor, equipment, supplies and materials to be provided by the contractor. All work shall be accomplished under environmental conditions appropriate to the nature of the project. Work will comply with all local, state, and federal regulations; to include NEC, EPA, OSHA, Minnesota State Building Codes, as well as USAF and Air National Guard regulations. The successful bidder may be required to furnish proof of liability insurance and workers compensation insurance coverage before the contract will be signed by the ANG. Work shall include but not necessarily limited to: Remove old mezzanine safety rails and ladder system and provide new materials and installation of safety rails, ladder, and wire mesh partition panels in building 641 at the Minnesota Air National Guard.
a) Bldg 641: Replace mezzanine safety rails and ladder system.
1. Remove and install ladder with a self-closing gate at the top of the ladder.
i. Dimensions will be approx. 3 ft wide by 3 ft high
2. Remove and install manual lift out gate with a manual roller gate (sliding gate).
i. Dimensions will be approx. 6 ft wide by 3 ft high
3. Remove and install all safety rails with the following:
i. Toeboard with at least a four inch height
ii. Mounting brackets
4. Install wire mesh partition panels with one of the following options:
i. Option 1: From the top of the safety rail to the ceiling.
1. Approx dimensions are 6 ft from railing top to ceiling
ii. Option 2: From the floor of the mezzanine to the ceiling.
1. Approx dimensions are 9 ft from floor to ceiling
b) Any costs involved with lifting or hoisting (man, materials or equipment) will NOT be the responsibility of the government.
c) Disposal of excess/demo materials will be the responsibility of the contractor.
Demo material is to be hauled offsite by contractor and disposed of according to State of Minnesota and Federal laws. Disposal site and quantity will be provided to the 133rd Base Environmental Office prior to final walkthrough.
Contractor required to field verify all measurements and directional orientations prior to installation.
5. Warranty: All materials shall be warranted to be in compliance with this statement of work and to the highest standards of the industry.
6. Work Hours: The Contractor shall provide services between the hours of 0700-1600 on Monday through Friday, except on recognized US holidays or when the Government facility/installation is closed due to local or national emergencies, administrative closings, or similar Government-directed facility/installation closings. Performance shall be at Building 641.
7. Manpower Reporting: The contractor shall completely fill in all required data fields using the following web address: https://www.sam.gov. Reporting inputs shall be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2019. Contractors may direct questions to the help desk at https://www.sam.gov.
Refer technical questions and information to:
SMSgt Mikkael Hahn Contracting Officer 610 Militia Drive St. Paul, MN 55111 612-713-2613 Mikkael.hahn@us.af.mil