Questions and Answers v2.pdf
PDF 153 KB Posted
- Attached to
- Air-cooled 80-ton nominal scroll chiller Federal contract opportunity
- Solicitation number
- W50S72-23-Q-7207
- Issued by
- Department of the Army National Guard
About this file
This document contains questions and answers regarding Solicitation Number W50S72-23-7202 for an air-cooled 80-ton nominal scroll chiller. The solicitation does not require the removal of the existing chiller or connection of controls to the base DDC system. No bonds, sales tax, or wage rates are applicable to this commodity purchase with incidental installation. The delivery date will be determined based on the vendor's submitted lead time for the chiller. The bid close date is September 22, 2023 at 10:30 am central time, with the notice of award to be posted on SAM.gov. A 30% glycol mix is required for the chiller.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers v1.pdf | ||
| Full-Text Provisions and Clauses.pdf | ||
| DFARS 252.204-7016-7.pdf | ||
| CHILLER Drawing.pdf | ||
| Vendor Information Sheet.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: W50S72-23-7202
Questions and Answers v2
Q1. Should the proposal include the removal and disposal of the current chiller?
A1. No, the proposal does not include the removal of the existing chiller.
Q2. Shall we include the cost for controls to the BAS for the new chiller?
A2. No, Connecting the controls on the chiller to the base DDC system is not required.
Q3. Shall the cost of a performance/performance bond be included in our proposal?
A3. No bonds will not be required for this contract.
Q4. Should sales tax be included in our proposal?
A4. No, this will be tax exempt.
Q5. Is a bid bond required?
A5. No bonds will be required for this contract.
Q6. Are the wage rates posted?
A6. This solicitation is being posted as a commercial commodity purchase with incidental installation.
Because it is a commodity purchase with install, there are no wage rates.
Q7. What is the period of performance?
A7. delivery date will be determined off of the lead time submitted by the vendor for the chiller.
Q8. Is the bidding date & time remains the same? Sept. 22, 10:30AM A8. Yes, the bid close date is 22 Sept 2023 at 10:30 am central. If you would like to request an extension, please let me know.
Q9. Can i ask for a copy of the planholders list?
A9. All documents for this solicitation are posted on SAM.gov, so no vendor has to contact us for it, therefore no list is kept.
Q10. How much will be the project estimated cost?
A10. I am not authorized to disclose the Government’s estimate.
Q11. Is there any addendum issued to date?
A11. No addendums have been issues.:
Q12. When would be the best time to follow up for the preliminary bid tabulation/result?
A12. Notice of award will be posted on SAM.gov
Q13. Is glycol mix required for the chiller?
A13. Yes, 30% glycol mix is required.