Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

W50S6Y

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project Title: DEMO BLDG 1043 (C26 Barn)

Attached is a clarification to original PWS. All questions sent in RFI has been answered below.

The proposal due date remains 10MAY2023 at 10:00 a.m. EDT.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

W50S6Y-USPFO FL 125 MISSION SUPPORT

14300 FANG DRIVE

JACKSONVILLE, FL 32218-7933

SAME AS BLOCK 6

9A. AMENDMENT OF SOLICITATION NUMBER

W50S6Y23R0004

1 2

05/03/2023

9B. DATED (SEE ITEM 11)

05/03/2023

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. X

Amendment 0001 to COMBINED SYNOPSIS SOLICITATION - DEMO BLDG 1043 (C26 Barn)

W50S6Y23R0004

1. Do the slab & foundations remain?

The slab and the existing footers are to remain in place. The existing anchor bolts are to be cut and ground smooth to match the existing concrete surface.

2. Can the slab get scuffed up by demolition activities?

We intend to reuse the existing slab by construct a new facility in the same location. Efforts shall be made to prevent the existing slab from being permanently damaged by negligence. The existing slab is composed of 8 inch thick reinforced concrete and will support construction equipment.

3. Does the project require Bid Bond and/or Paymentand Performance bond?

This project does NOT require Bid Bond and/or Payment and Performance bond.

4. Taking all the safety measures, can a platform stay at the site until it is full and ready to haul?

Yes, a platform can stay on site.

5. If the asbestos test is positive to presence, who will be responsible for the abatement?

The contractor is responsible for asbestos testing and to provide the results documentation to the owner prior to demolition. If asbestos is found the contractor would be required to provide an abatement plan and a cost to remove and dispose of the asbestos. This would be considered an additional cost and would be paid for through a contract modification.

6. Do the building footings need to be removed also?

No building footers will be removed. The anchor bolts will be cut off and ground smooth with the existing concrete surface.

AMD 1 Cover
Amd 0001 QandA