W50S6T23Q0007-0001 Amendment1 SF30.pdf

PDF 797 KB Posted

Attached to
Bird Netting
Solicitation number
W50S6T23Q0007
Issued by

View the file

Other files

File Type Posted
Images Bird Netting.docx DOCX document
W50S6T23Q0007 RFQ SF1449 -Bird Netting.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F6W3LS3055AW01

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A: The purpose of this amendment is to update the specifications and allow zipper or equivalent access to light fixtures and lamps.

B: All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Apr-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W50S6T23Q0007

X 9B. DATED (SEE ITEM 11)

17-Mar-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Apr-2023

CODE

USPFO CA 144 MSC

5323 E. MCKINLEY AVE

FRESNO CA 93727-2197

W50S6T 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S6T23Q0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

SUBCLIN 0001AA

The CLIN extended description has changed from:

Contractor shall provide and install bird netting meeting specifications to cover the loading dock measuring approx.

125ft x 22ft. The Loading Dock netting will be flat along the roof line with zipper access to light fixtures as needed.

The Loading Dock area has 8 lighting fixtures that shall be covered. Loading Dock has square light fixtures.

To:

Contractor shall provide and install bird netting meeting specifications to cover the loading dock measuring approx.

125ft x 22ft. The Loading Dock netting will be flat along the roof line with zipper (or equivalent) access to light fixtures as needed. The Loading Dock area has 8 lighting fixtures that shall be covered. Loading Dock has square light fixtures.

SUBCLIN 0001AB

The CLIN extended description has changed from:

Contractor shall provide and install bird netting to cover the covered storage structure measuring approx. 160ft x 66ft. Bird netting will follow under the pitched roof line with zipper access to light fixtures as needed. The covered storage area has 18 lighting fixtures that shall be covered. Covered Storage has circle light fixtures.

To:

Contractor shall provide and install bird netting to cover the covered storage structure measuring approx. 160ft x 66ft. Bird netting will follow under the pitched roof line with zipper (or equivalent) access to light fixtures as needed. The covered storage area has 18 lighting fixtures that shall be covered. Covered Storage has circle light fixtures.

The following have been modified:

SPECIFICATIONS

Specifications:

1. Bird Netting for Storage Areas - Covered Storage and Loading Dock

1.1. The Logistics Readiness Squadron (LRS) needs bird netting to eliminate bird nesting.

Bird netting shall be installed in two storage structures to eliminate pest birds from landing, roosting, and nesting. Product shall meet and be installed as follows:

1.1.1. Color: Black netting

1.1.2. Netting shall have a longevity of approximately 10-15 years.

1.1.3. Netting to have gaps approximately 3/4" with UV treated heavy duty polyethylene bird netting.

1.1.4. Vendor will install zipper (or equivalent) access under light fixtures areas to allow access to lighting lamps. Light fixtures are approximately 2ft x 2ft.

1.1.5. All measurements shall be verified and adjusted to complete bird elimination with the ability to easily change lighting lamps.

1.2. Loading Dock: Measurements Approx. 125ft x 22ft. Approximately 2750 square feet. Loading dock netting will be flat along the roof line with zipper (or equivalent) access to light fixtures as needed. The loading dock has a slight slant to it but the netting shall be flat along the roof area.

1.2.1. The Loading Dock area has 8 lighting fixtures that shall be covered.

Loading Dock has square light fixtures.

1.3. Covered Storage: Measurements Approx. 160ft x 66ft. Approximately 10,560 square feet. Bird netting will follow under the pitched roof line opposed to flat with zipper (or equivalent) access to light fixtures as needed.

1.3.1. The Covered Storage area has 18 lighting fixtures that shall be covered.

Covered Storage has circle light fixtures.

2. Security

2.1 Base Access. Base security requires all personnel entering the installation be cleared for access. The contractor will provide first name, last name, date of birth and DBIDS code for all personnel accessing the base. The contractor shall submit this information using the Wing Form and DBIDS Pre-Enrollment application no later than five working days prior to the date of required access. Foreign national reviews require 14 working days for review. All contractor personnel must maintain a valid driver’s license, vehicle registration/proof of insurance (if applicable) at all times while on base. A Real ID is the preferred identification for base vetting purposes. In lieu of a Real ID, Original Social Security Card and Original Birth Certificate or a valid U.S. Passport will suffice. The primary method of Antiterrorism Awareness Level I Training will be by instructor.

DBIDS Pre-enrollment: https://dbids-global-enroll.dmdc.mil/preenrollui/#!/

2.2 Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer

(KO). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy.

Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

2.3 For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 10-245, AFI 31-101 and AFMAN 31-113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

2.4 Antiterrorism Awareness Level I Training (AT Level I). This standard language is for contractor employees with an area of performance within a US Government controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access to US Government installations, facilities and controlled access areas shall complete AT Level I training within 45 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor; completing the Force Protection computer-based training (CBT) course on Joint Knowledge Online (JKO) at https://jkodirect.jten.mil/Atlas2/ faces/page/login/Login.seam. For those without a CAC, select "Non-CAC" user on the JKO site. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT Representative.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .