W50S6T22Q0031-0001 SF30 Amemdment1.pdf
PDF 858 KB Posted
- Attached to
- HEF Bladder Replacement
- Solicitation number
- W50S6T22Q0031
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W50S6T22Q0031-0001 RFQ SF1449 Confrom Copy.pdf | ||
| W50S6T22Q0031 RFQ SF1449.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W50S6T22Q0031
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to:
A. Provide updates and clarif ications to the PWS.
B. Extend the due date from 4 August to 19 August 2022 at 4pm.
C. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Aug-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W50S6T22Q0031
X 9B. DATED (SEE ITEM 11)
20-Jul-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Aug-2022
CODE
USPFO CA 144 MSC
5323 E. MCKINLEY AVE
FRESNO CA 93727-2197
W50S6T 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 04-Aug-2022 04:00 PM to 19-Aug-2022 04:00 PM.
The following have been modified:
STATEMENT OF WORK
STATEMENT OF
WORK
Replace HEF Bladder Bldg. 100
PROJECT NO.: HAYW222637
28 April 2022
144TH FIGHTER
WING CALIFORNIA AIR NATIONAL GUARD,
FRESNO
TABLE OF CONTENTS:
1.0 DESCRIPTION OF SERVICES
2.0 SITE OF WORK
3.0 STATEMENT OF WORK ........................................ Error! Bookmark not defined.
4.0 CONTRACTOR LICENSE REQUIREMENTS
5.0 PROJECT SPECIFIC REQUIREMENTS
6.0 GENERAL REQUIREMENTS
7.0 CLOSEOUT DOCUMENTATION
8.0 DEFINITIONS
9.0 ACRONYMS
1.0 DESCRIPTION OF SERVICES
This Statement of Work describes contractor requirements for the project titled “Replace HEF Bladder Bldg. 100”. All work will occur at the Fresno Air National Guard Base, Fresno, California. The contractor is responsible to furnish and install all labor and materials to complete the items listed in this Statement of Work. The contractor shall provide the government a complete and usable product that will be inspected/accepted by the government at the completion of the project. All information included in this document, along with the instructions and standards referenced in the document, should be considered as part of the Statement of Work.
2.0 SITE OF WORK
All work will occur at the
144th Fighter Wing, Fresno Air National Guard Base 5323 E McKinley Ave Fresno, CA 93727
3.0 STATEMENT OF WORK
3.1 Objectives: The purpose of this project is to replace the bladder for the high expansion foam system for building 100.
3.2 Directions
3.2.1 Complete all work according to the manufacturer’s specifications.
3.2.2 Pump existing foam concentrate out of tank into barrels
3.2.3 Extract old bladder from tank
3.2.4 Inspect tank shell for damages and dispose of off‐site
3.2.5 Install new 400 gallon HEF bladder compatible with existing Ansul Mfg. system
3.2.6 Fill bladder with existing foam concentrate
3.2.7 Reset foam system to normal operation
3.2.8 Conduct training for base personnel on foam system shutdown and preventative maintenance
3.2.9 Contractor is responsible to properly dispose of excess foam and bladder off the 144th FW.
4.0 CONTRACTOR LICENSE REQUIREMENTS
4.1 The primary contractor may possess a valid license to perform fire protection work or be able to provide proof of competence in the area of work. The contractor may self‐perform sections of the project. All employees performing fire prevention shall be properly certified to perform work.
4.2 It is the responsibility of the contractor to ensure any sub‐contractor is properly licensed to perform fire protection work.
5.0 PROJECT SPECIFIC REQUIREMENTS
5.1 The project shall be completed no later than 30 calendar days after the start of performance. The contractor and government can negotiate the final phasing and schedule (as applicable) during a review of the project at the post award conference.
5.2 Proposed substitution shall document all salient characteristic differences between the specified material and the requested substitution.
6.0 GENERAL REQUIREMENTS
6.1 If required, the Contractor will attend a Post Award Conference. At a minimum, the contractor shall have their project manager and site superintendent attend the meeting.
The Contractor will provide the following documents at the Post Award Conference:
6.1.1 Project Schedule
6.1.2 Contract Schedule of Values
6.1.3 Safety Plan
6.1.4 Quality Control Plan
6.1.5 Material Submittals
6.2 Available Utilities and Services. The government will provide water, sewer and electrical connections. Unsecure outdoor storage area at the base is available and must be requested through the project manager prior to utilizing. Secured storage is the responsibility of the contractor.
6.3 Quality Control. Contractor shall develop and maintain a quality program to ensure work is performed as described in this Statement of Work and in accordance with all local, state and federal rules.
6.4 Quality Assurance. The Government will maintain a Quality Assurance Program to ensure work is performed as described in this Statement of Work and in accordance with all local, state, and federal rules. The COR, and Construction Manager will manage the Government’s QA program.
6.5 Hours of Operation. The hours of work shall be between 7:00 a.m. and 5:00 p.m. Monday through Friday unless otherwise prescribed by this Statement of Work. Work shall not be performed on weekends and federal holidays without prior coordination from the COR.
Contracting office shall provide a list of scheduled days off (SDO). SDOs are non‐working days.
6.6 Base Access. Base security requires all personnel entering the installation be cleared for access. The contractor will provide first name, last name, driver’s license number for all personnel accessing the base. The contractor shall submit this information using the Wing Form and DBIDS Pre‐Enrollment application no later than five working days prior to the date of required access. Contractor personnel are further required to email each employee driver’s license to the government project manager. All contractor personnel must maintain a valid driver’s license, vehicle registration/proof of insurance (if applicable) at all times while on the base. A Real ID is the preferred identification for base vetting purposes. In lieu of a Real ID, Original Social Security Card and Original Birth Certificate or a valid U.S. Passport will suffice.
DBIDS Pre‐enrollment: https://dbids-global-enroll.dmdc.mil/preenrollui/#!/
6.6.1 Access and General Protection/Security Policy and Procedures. This standard language is for contractor employees with an area of performance within Government controlled installation, facility, or area. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR) or government project manager. The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.
6.6.2 For Contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractors require a Defense Biometrics Identification System (DBIDS) Card. Before DBIDS Card issuance, contractor and all associated sub‐ contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC‐ III) and Terrorist Screening Database (TSDB) (AFI 10‐245, AFI 31‐101 and AFMAN 31‐113), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
6.6.3 Antiterrorism Awareness Level I Training (AT Level I). All contractor employees, to include subcontractor employees, requiring unescorted access to US Government installations, facilities and controlled access areas shall complete AT Level I training prior to DBIDS badge issuance, contract start date, or effective date of incorporation of this requirement into the contract, whichever is applicable. AT Level I may be accomplished by a Level I qualified instructor in accordance with DoDI 2000.16 v1 Standard 9 and Table 1 curriculum. Tracking for each contractor or subcontractor employee is the responsibility of the COR or unit AT
Representative.
6.7 Technical Competence and Ability. If requested by the Government, the Contractor shall provide proof of technical competence and experience in the area of expertise required by this Statement of Work. The contractor shall be prepared to submit documents providing proof of successful competence such as training certificate or accreditations from recognized industry leaders. Contractors shall also be prepared to provide proof of successful project experience through references of former clients in related project types.
6.8 Dimensions and Quantity. All dimensions and quantities provided in the Statement of Work are estimates only. They are provided as a courtesy for contractors to estimate the magnitude of work or materials necessary to complete a task. They are not intended to be final measurements. The Contractor is responsible for verifying all dimensions and quantities in the field prior to starting work.
6.9 Warranty. The contractor shall guarantee all workmanship and materials covered under this Statement of Work for a period of no less than one (1) year from the date of project acceptance. This contractor’s warranty shall be included with any manufacturer’s warranties that accompany materials or systems installed as part of this Statement of Work.
7.0 CLOSEOUT DOCUMENTATION
Final acceptance will be contingent upon receipt of the following items:
Contractor workmanship letter of warranty up to one year.
All applicable O&M manuals
8.0 DEFINITIONS
Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
Defect: A service output that does not meet the standard of performance associated with the
SOW.
Deliverable: Anything that can be physically delivered and includes non-manufactured things such as meeting minutes or reports.
Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the SOW. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
Physical Security: Actions that prevent the loss or damage of Government property.
Quality Assurance: The Government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
Quality Control: All necessary measures taken by the Contractor to ensure that the quality of an end product or service shall meet contract requirements.
Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
9.0 ACRONYMS
AF Air Force AFI Air Force Instruction AFMAN Air Force Manual AT/OPSEC Antiterrorism/Operational Security BI Background Investigation CAC Common Access Card CM Contract Manager COR Contracting Officer’s Representative DoD Department of Defense FW Fighter Wing GFP/M/E/S Government Furnished Property/Material/Equipment/Services HAF Headquarters of the Air Force KO Contracting Officer KV Kilo Volt MFR Manufacturer NGB National Guard Bureau NLT No Later Than O&M Operations and Maintenance POC Point of Contact QA Quality Assurance QC Quality Control QCP Quality Control Program SDO Scheduled Day Off PWS Statement of Work SSN Social Security Number UFC Unified Facilities Criteria USD(I) Under Secretary of Defense for Intelligence
(End of Summary of Changes)
File details come from the government source that posted it. Updated .