Requests for Information – 22 August 2022

Questions and Answers

1. Can we get details on the room this is to be installed?

a. Wall type: Reinforced- 2x4 studs-16" on center, and 2x4 stud bracing to original wall, with 3/4' plywood bracing for mounting video wall hardware. The 3/4" is 24inches tall and approximately between 13' and 11.5' and then again approximately between 26" and 44" ft off the ground, and finally, 1/2" Sheetrock

b. Height: Floor to ceiling 14’ Width 22’

2. Distance LG Controller/Processor from the LED Board and do we need to run the data lines?

60’ data line required, yes the company will need to run the lines

3. Any special requirements for technicians to get on base such as background checks, drug tests, proof of Covid Vaccine?

Background and drug tests yes. Covid Vaccine No.

4. What are the number and type of video feeds (Video Wall Processor inputs) that are required to be supported for the EOC video wall?

See SOW for this info

5. Do all video feeds (video wall processor inputs) currently reside in the rack/location where the video wall processor will be placed?

No

6. What are the number of simultaneous display windows that are required to be supported for the EOC video wall?

Four

7. Is additional Ethernet cable wiring from the video wall processor rack location to the EOC video wall required, if it is, can we get a distance and short description of the Ethernet cable path?

Yes, chase ways are provided

8. Video Wall OEM suggests the video wall be mounted on a minimum of ¾” plywood applied to the existing wall structure to ensure strength, plumb, and secure mounting support. Can we get a description of the existing wall structure?

Wall has already been re-enforced to ensure strength, plumb and secure mounting support for screen up to 1500 lbs.

9. Does the Government desire the contractor to install the ¾” plywood the existing wall structure?

No, Wall has already been re-enforced to ensure strength, plumb and secure mounting support for screen up to 1500 lbs.

10. Does the Government desire the contractor to install electrical outlets on the existing wall structure to support the EOC video wall, if so, can we get a distance and short description of the electrical cable path?

No

11. Although you provided the pixel information. We want to know what type of content you are going to play on this video wall. It will help us to provide you the best solution.

Live steam news, high definition videos, various PowerPoints, Office Suite Docs as well as Web Based interactive software programs

12. Is TAA compliance required?

No, this is just supposed to be plug and play

13. What is the POP for this contract?

Per the solicitation the EOC wall is to be delivered and installed within 60 days after award