SOW 20 July 23.docx

DOCX document 2 MB Posted

Attached to
Repair Fire Panel & Alarm Device, JBER
Solicitation number
W50S6L-23-B-0005
Issued by

About this file

This statement of work outlines requirements for fire panel sequencing services and an optional false wall construction project at Joint Base Elmendorf-Richardson in Alaska. The base bid requires determining the current fire panel sequence of operation at Hangar 21, allowing for future changes, writing the program, and providing the program file. The optional bid involves constructing a 16' x 11' false wall in Building 17455, including electrical outlets, relocating items from the existing wall, keeping vertical piping in place, finishing the wall, and relocating fire alarm devices. The period of performance is no more than 90 days from notice to proceed. The contract will be awarded on a firm fixed price basis, and the contractor must clean up debris and remove unused materials.

View the file

Other files

File Type Posted
Bid Abstract_23B0005.pdf PDF
23B0005 A00001 Mod.pdf PDF
23B0005 A00001 Conformed.pdf PDF
SOW 06 July 23.docx DOCX document
W50S6L23B0005.pdf PDF
Attach 1 Control Panel.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FIRE PANEL SEQUENCING SERVICES

STATEMENT OF WORK

Repair Fire Panel & Alarm Device, Hangar 21/Bldg 17455

FXSB230102

20 July 2023

1 GENERAL

1.1 The work covered by this Statement of Work (SOW) includes providing all plant, labor, equipment, and materials required to perform planning and construction of the tasks outlined below. The contractor shall be responsible for necessary travel and services required to perform the work.

1.2 The contract procedures and project objective provide only general direction of what is required and does not constitute a complete explanation of the work involved. The government is relying on the contractor’s expertise in providing planning and construction that meets the intent of the task. The contractor shall work closely with designated government representative to work out details.

1.3 The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.4 Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (AFI 31-101 and AFI 10-245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

1.5 Defense Contractor Manpower Reporting Initiative. the contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the National Guard Bureau (or your organization) via the secure data collection site www.sam.gov.

1.6 Work shall comply with local, state, and federal codes and applicable ANG Engineering Technical Letters (ETLs).

1.7 Materials incorporated into the work shall be new.

1.8 Asbestos Containing Materials (ACM) are not present in Hangar 21.

1.9 The contractor shall account for all contractor HAZMAT using the JBER Contractor Hazardous Materials Usage Tracking Form (Appendix A of JBER IHMP). Additionally, all contractors and their subcontractors shall comply with applicable Federal regulations (FAR Clauses 52.223-3, Hazardous Material Identification and Material Safety Data; 52.223-5, Pollution Prevention and Right-to-Know Information; 52.223-7, Notice of Radioactive Material; 52.223-19, Compliance with Environmental Management Systems; AFMAN 32-7002, Environmental Compliance and Pollution Prevention), local regulations, and JBER’s Environmental regulations including but not limited to JBER’s Integrated Hazardous Material Plan (IHMP), and Hazardous Waste Management Plan (HWMP). These guidelines were established to protect the health and safety of personnel at JBER and to maintain compliance with the federal, state, and local laws. However these guidelines are subject to change. It is the contractors and subcontractors’ responsibilities to be familiar with the guidelines and seek approval before bringing on base any Hazardous Materials. The POC for environmental issues or concerns is 176 CES/CEV.

1.10 Anti-Terrorism / Operations Security / Information Protection.

1.10.1 Access and General Protection/Security Policy and Procedures. The contractor shall comply with all applicable installation/facility access and local security policies and procedures, which may be obtained from the Contracting Officer’s Representative (COR). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the local installation’s Security Forces, Director of Emergency Services or local Security Office. The contractor shall ensure compliance with all personal identity verification requirements as directed by DoD, HAF and/or local policy. Should the Force Protection Condition (FPCON) change, the Government may require changes in contractor security matters or processes.

1.10.2 For contractors that do not require CAC, but require access to a DoD Facility and/or Installation. Contractor and all associated sub‐contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC‐III) and Terrorist Screening Database (TSDB) (AFI 31‐101 and AFI 10‐245), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

1.11 AT Level I Training. All contractor employees, to include subcontractor employees, requiring access Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within 10 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Certificates of completion for each affected contractor employee and subcontractor employee will be maintained by the COR or Antiterrorism Representative. AT level I Awareness Training is available at the following website: http://jko.jten.mil

2 CONTRACT PROCEDURES

2.1 This contract shall be awarded on a firm fixed price basis.

2.2 The contractor shall clean up all construction debris and remove all unused materials.

2.3 The contractor shall walk the site with the government project manager for a final inspection to verify all tasks are complete and that objectives were achieved.

2.4 The contractor shall provide copy of program on USB thumb drive (or format required for 673rd Alarm Shop).

3 PROJECT OBJECTIVES

BASE BID – Repair Fire Panel Sequence of Operation, Hangar 21. Non-personal services: Provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance and supervision necessary to determine the fire panel’s current sequence of operation at Hangar 21, allow for future sequence of operation changes, write program, and provide copy of program on USB thumb drive (or format required for 673rd Alarm Shop, contractor shall verify format) for 673rd Alarm Shop.

OPTIONAL BID – Construct False Wall/Replace Fire Alarm Device, Bldg. 17455. Non-personal services: Provide all plant, labor, new and current material, transportation, tools, equipment, appliances, supplies, services, permits, insurance and supervision necessary to construct a 16’x11’ false wall which will include two electrical receptacles. Items mounted on existing wall, shall be relocated adjacent to new wall. Existing vertical piping to remain in place, false wall to be built around pipe. Newly constructed wall shall have sheetrock and textured finish with two coats of paint and rubber base. Intent is to procure new storage/shelving (not part of this contracted effort) that will butt up against the new wall. In addition, relocate fire alarm devices to another location. See photos below.

Approximate location of new false wall, exact location to be coordinated with user.

4 PERIOD OF PERFORMANCE

4.1 The PoP shall be no more than 90 days after the notice to proceed (NTP).

ATTACHMENT: SCA WD # 2015-5681

image1.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg

File details come from the government source that posted it. Updated .