AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to provide Q&A from the site visit and add verbiage regarding aw ardee selection under block 10.
All other solicitation terms and conditions remain unchained.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
04-May-2022
16B. UNITED STATES OF AMERICA 15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W50S6L22B0002
X 9B. DATED (SEE ITEM 11)
06-Apr-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-May-2022
CODE
USPFO AK 176 MSC
7252 GIBSON AVE.
ANCHORAGE AK 99506-2959
W50S6L 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S6L22B0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The required performance has changed from Project Title: Alaska Air National Guard (AKANG) Repair
176WG Wellness CenterProject Number: FXSB100235A bid bond is required with this bid and a bidder who fails to submit an acceptable bid bond will be determined non-responsive.This procurement is being solicited as a 100% Small Business Set-Aside. The North American Industry Classification System Code (NAICS) is 236220. The size standard for Small Business is $39.5M average revenue for the three previous years. The project magnitude is between $100,000 and $250,000. to Project Title: Alaska Air National Guard (AKANG) Repair 176WG Wellness CenterProject Number: FXSB100235A bid bond is required with this bid and a bidder who fails to submit an acceptable bid bond will be determined non-responsive.This procurement is being solicited as a 100% Small Business Set-Aside. The North American Industry Classification System Code (NAICS) is 236220. The size standard for Small Business is $39.5M average revenue for the three previous years. The project magnitude is between $100,000 and $250,000.All documents including plans and specifications will be available only from the SAM website SAM.gov. Award will be made to the responsible bidder whose bid conforms to the invitation for bids and is most advantageous to the Government considering only price and price related factors..
(End of Summary of Changes)
1291424046N Highlight
W50S6L22B0002
AMENDMENT 1 – Q&A
4 May 2022
Question 1:
Section 1.8 of SOW does not list Asbestos standard number I.E. OSHA 1926 1101(A), UFGS 02 82 00 or applicable ANSI standard. If ACM materials are present is the abatement contractor to conform to UFGS 02 82 00 if not what regulatory standard is required?
Answer 1:
29 CFR 1926.1101: OSHA Asbestos Standard 29 CFR 1910.1001: OSHA Asbestos Standard 40 CFR 61 Subpart M: National Emission Standards for Asbestos 8 AAC 61.600-790: Asbestos Abatement Certification requirements 40 CFR Subchapter R: Toxic Substances Control Act (if asbestos is found) UFGS 02 82 00: Asbestos Remediation In addition to these standards, all contractors working on base must comply with JBER’s Asbestos Management and Operating Plan (attached).
Question 2:
In section 3.3A of project objectives it stated metal stud framing from floor to ceiling, given the STC 45 rating does the purchaser require metal stud framing to extend and fasten to the underside of the roof deck or terminate at the specific height above AFF?
Answer 2:
Height of studs should be approximately two feet above drop ceiling.
Question 3:
What is extent of flooring replacement where wall is removed and new rooms?
Answer 3:
Extent of removal shall be limited to be only that which is needed to remove wall.
Question 4:
Is it known if the walls that the extra 6 receptacles are to be installed have been abated?
Answer 4:
Not specifically, however random testing was completed by host base and no contamination was found on walls in the building.
W50S6L22B0002
| 2022-05-04T00:17:01-0800 | |
| VANFOSSEN.CONNER.JAMES.1291424046 |