22Q0003 P0001.pdf
PDF 720 KB Posted
- Attached to
- Paint Booth Federal contract opportunity
- Solicitation number
- W44W9M22Q0003
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 22Q0003 P0003.pdf | ||
| 22Q0003 P0002.pdf | ||
| PAINT BOOTH DRAWING.pdf | ||
| 22Q0003.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTING OFFICE/AJ
ANDREA JONES
918-420-7431/MCALESTER CONTRACTING
1 C TREE ROAD
MCALESTER OK 74501-9002
W44W9M125900QJ
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Addition of bidder questions.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Oct-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W44W9M22Q0003
X 9B. DATED (SEE ITEM 11)
04-Oct-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Oct-2021
CODE
CONTRACTING OFFICE
MCALESTER CONTRACTING OFFICE
1 C TREE ROAD
MCALESTER OK 74501-9002
W44W9M 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W44W9M
FACILITY CODECODE
EMAIL:TEL:
W44W9M22Q0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
BIDDER QUESTIONS
Is this an open face booth?
- yes Does it need exhaust ducting in order to vent to the outside? If so, I will need the roof height and pitch.
- no Define “weather cover” is this to mean an exhaust motor cover?
- yes Single stage filtration, meaning only one layer of exhaust filter media or will it need 2 or 3 stage filtration?
- 1 layer Did you want the light fixture before or after the conveyor slot?
- before Available voltage for the control panel, 208V, 230V, 460V 3 phase?
- 208v/460v 3 ph Also, can you double check the dimensions listed versus what is shown on the drawing.
- Double checked complete The conveyor slot dimensions appear to only be for the roof opening not the side walls, assumed the opening width at 28.5” with an overall booth depth of 11’-3” instead of 8’ as shown below (drawing shows 135” overall depth).
- 12” roof slot, 28.5 door opening, What is the product that will be going into the containment booth?
- cylinder What is the requested building type: single (galvanized) or dual skin (insulated) wall panels?
- galvanized How is air being brought into space: AMU (air makeup unit) or intake filter location?
- Open face How are the doors going to be controlled? Via our control panel or actuated by the conveyor?
- Actuated by conveyor, McAAP will plumb Is a control panel required? If yes, please inform what functions are needed beside on / off.
- no Is speed control required on the exhaust?
- no Is spray air solenoid to be controlled by the control panel or air flow switch?
- Air flow switch What is the requested building type: single (galvanized) or dual skin (insulated) wall panels?
- Galvanized.
How is air being brought into space: AMU (air makeup unit) or intake filter location?
- Open face
W44W9M22Q0003
How are the doors going to be controlled? Via our control panel or actuated by the conveyor?
- Actuated by conveyor, mcaap will plumb
Is a control panel required? If yes, please inform what functions are needed beside on / off.
- no
Is speed control required on the exhaust?
- no
Is spray air solenoid to be controlled by the control panel or air flow switch?
- Flow switch
Drive thru or Solid Back Room?
- Solid back
Type of room you want? Cross Draft, Modified Down Draft, Side Down Draft or Full Down Draft?
If not sure, describe the size of the parts you will be painting?
cross draft Do you need an Air Makeup Unit (AMU)?
- no Do you need a curing cycle?
- no Are the dimensions stated inside or outside dimensions ?
- outside Please clarify conveyor slot dimensions as it states 1’ W x 1’4” H. ( do you have a drawing showing what you are wanting as part of this conveyor slot to be 1’4” H ?
- 12” wide x 68”, Not sure where 1’4” is coming from.
We understand that it needs to be 1’wide but the Height dimension is confusing ( Most conveyor slots are described as width x length )
- Length of the booth 68” so the monorail can pass through the booth.
Do you require single phase ( 115,208/230 ) or 3 phase electrics ( 208,230, 460 ) for your tri-voltage motors ?
- 3 ph, 208,230,460 volt