W31P4Q-27-RFI-FACL_Sample Draft Performance Work Statement_04NOV2026.pdf
PDF 736 KB Posted
- Attached to
- Facilities & Furniture Support Services
- Solicitation number
- W31P4Q-27-RFI-FACL
About this file
This is a Performance Work Statement (PWS) for furniture, installation, and program management services for the US Army Transformation and Training Command (T2COM) Combat Capabilities Development Command (DEVCOM) Aviation and Missile Center (AvMC) located on Redstone Arsenal. Dated November 4, 2026, the PWS outlines comprehensive requirements for procuring furniture, fixtures, and associated program management to design, order, deliver, install, reconfigure, relocate, and dispose of office, laboratory, and support space furnishings across DEVCOM AvMC facilities.
The contractor must provide all labor, materials, equipment, supervision, and program management to ensure functional, safe, and mission-ready workspaces. Key deliverables and services include facility inspection and damage documentation prior to work commencement; comprehensive facility outfitting planning and design services compliant with the AvMC G4 Handbook; procurement and implementation of furniture and equipment categories including seating, tables, storage, appliances, wall and floor products, specialty equipment, and visual graphics; delivery and installation coordination with four to six weeks' notice prior to scheduled dates; and relocation services including mechanical relocation, packing, crating, and transport of equipment. The contractor must provide site supervisors at the task order level, coordinate with the Contracting Officer (KO) and Contracting Officer's Representative (COR), and conduct all onsite work during standard DEVCOM AvMC operating hours (Monday-Friday, 7:00 AM to 5:00 PM). The contractor is responsible for warranty and commercial assurance services, daily debris removal from government premises using off-post disposal (not government dumpsters), and submission of design packages including CAD files, specifications, and cost estimations. Deliverables include Installation Design Package, DoD Risk Management Framework Package, Implementation Plan, Status Reports, and DoD Documents. All contractor personnel requiring routine physical access to the military installation must complete Level I antiterrorism awareness training, iWatch training, and Operational Security training within specified timeframes, with certificates submitted to the COR.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W31
P4Q -27
-R
FI-F
ACL
SAMPLE
D
RAFT
Performance Work Statement (PWS)
Furniture, Installation, and Program Management
REQUIRING ACTIVITY: US Army Transformation and Training Command (T2COM) Combat Capabilities Development Command (DEVCOM) Aviation and Missile Center (AvMC)
DATE 04 November 2026
General
The US Army Transformation and Training Command (T2COM) Combat Capabilities Development Command (DEVCOM) Aviation and Missile Center (AvMC) requires a Contractor to procure furniture, fixtures, and associated program management for the design, ordering, delivery, installation, reconfiguration, relocation, and disposal services to ensure the continued operability, configuration, and sustainment of office, laboratory, and support spaces across the DEVCOM AvMC facilities located on Redstone Arsenal (RSA). The contractor shall manage ordering, shipment, delivery and installation of all new furniture from manufacturer to final acceptance by the Government.
The AvMC’s mission execution depends on functional, interoperable, ergonomic, and properly configured workspaces.
The contractor shall provide all labor, materials, equipment, supervision, and program management necessary to furnish functional, safe, and mission-ready workspaces across DEVCOM AvMC facilities. This includes ongoing service of any items defective due to manufacturing error as well as for replacement or repair of any received item in damaged condition.
Task Management and Oversight
Government Oversight and Quality Assurance
The Government will perform task management and quality assurance oversight for the duration of this contract. This oversight includes monitoring Contractor performance, conducting final inspections, and executing acceptance of all services and deliverables.
Government oversight does not relieve the Contractor of its responsibility to perform quality control and execute services in accordance with (IAW) the terms of the contract.
Discrepancy Reporting and Material Substitutions
The Contractor shall identify and report discrepancies between proposed services/materials and actual operational requirements to the Government in writing within one (1) business day of discovery. The Contractor shall correct all identified
-27
-R
RAFT
deficiencies in accordance with written guidance and timelines provided by the Contracting Officer (KO) or the COR. The Contractor shall not substitute proposed materials, furniture or products with alternate items without obtaining written approval from the KO or COR, as applicable, prior to purchase.
Pre-work Facility Inspection
The Contractor shall inspect the designed work areas and document any pre-existing facility or building damage. The Contractor shall submit a written damage report to the COR prior to the commencement of any work at the facility. Failure to document pre-existing damage prior to starting work could result in the potential of Contractor liability for damage identified by the Government.
Performance and Task Requirements
The Contractor shall provide dedicated resources, including the appropriate labor mix, materials, equipment and services to satisfy the requirements stated in individual Task Orders (TOs) issued under this contract.
The Contractor shall performance all requirements through individual TOs with specifically defined scopes, deliverables, products and schedules. The Contractor shall provide management oversight as defined further specifically in each TO PWS. The Contractor shall simultaneously manage multiple task requirements and supplier arrangements to outfit an area identified within each individual TO PWS.
The Contractor shall perform all final electrical hard-wired connections for facility items under for facility items, such as furniture whips or similar installations, only where there are no alterations to real property. The Contractor shall not make alterations which include running conduit and writing in or on the walls or ceilings, and the Contractor’s work shall be limited to connecting to already existing, code compliant circuit. The Contractor shall ensure all electrical work is performed by a licensed, qualified electrician IAW manufacturer’s recommendations. All completed connections will be inspected and accepted by the AvMC Facilities Division prior to Government use. The Government will remain responsible for the installation of outlet boxes in designated locations, if required.
The Contractor shall perform final plumbing connections for facility appliances, such as coffee makers, refrigerators or similar installations only where there are no alterations to real property. The Contractor shall be strictly limited to connecting lines and fittings directly to an existing code-compliant plumbed outlet.
The Contractor shall provide warranty and commercial assurance services for all furnishings, appliances and equipment purchased under individual TOs. The Contractor
-27
-R shall ensure all delivered items include standard manufacturer’s warranty, which shall transition to the Government upon acceptance.
Unless otherwise explicitly specified in individual TOs, the Contractor shall conduct all onsite work during the standard DEVCOM AvMC hours of operation. Hours of operations are as follows: Monday through Friday from 7:00am to 5:00pm; closed on weekends and Federal Holidays.
Program Management
The Contractor shall provide all resources necessary to manage the planning and execution of requirements. The Contractor shall provide strategic coordination for all facility planning that may be required under an individual task order. The Contractor shall coordinate all facility outfitting planning requirements with the AvMC Facilities Division. The Contractor shall provide a site supervisor, at the task order level, for all phases of the project. The Contractor’s site supervisor shall coordinate with the COR and AvMC Facilities Division, and, as necessary, attend Government meetings to facilitate planning strategies and schedules.
Facility Outfitting Planning and Design Services
The Contractor shall coordinate a comprehensive outfitting strategy with the COR and the AvMC Facilities Division prior to the purchase, design, installation, maintenance, or repair of any facility outfitting requirements. All planning, designs, and materials shall comply with the AvMC G4 Handbook.
The scope of outfitting planning and design requirements includes, but is not limited to, the categories detailed in the below:
Seating and Chairs: Laboratory furnishings, lab workbenches, task, executive, conference, training, reception, and auditorium seating.
Tables: Conference, meeting, and training tables.
Storage and Fixtures: Cabinets, shelving, specialty storage, display cases, fixtures, work tables, pedestals, credenzas, mobile lecterns, and bookcases.
Furniture and Appliances: Sofas, end tables, lighting/lamps, case goods, private office layouts, laboratory specialty furniture, trash receptacles, coffee makers, marker boards, console units, and systems furniture.
Wall and Floor Products: Demountable, moveable, or architectural wall products; raised flooring products; and floor coverings.
Specialty Equipment: Fitness equipment and health/medical equipment (including Automated External Defibrillators [AEDs])
-27
-R
Visual and Graphics: Display boards, communication boards, artwork, graphics, signage, and organizational logos.
Planning Recommendations & Warranty Management
The Contractor shall provide outfitting recommendations and detailed space plans for commercially available requirements. All plans must align with space standards established by the AvMC Facilities and Logistics Division.
• Assembly & Installation: The Contractor shall ensure all approved outfitting items are completely, safely, and properly assembled and installed.
• Warranty Management: The Contractor shall coordinate directly with manufacturers to obtain all warranty information and shall deliver finalized warranty documentation to the COR upon product acceptance.
Delivery, Coordination & Installation
The Contractor shall coordinate the delivery and installation schedule of all outfitting requirements with the COR and the AvMC Facilities no later than four (4) weeks prior to the scheduled installation date specified in the individual TO.
• Onsite Storage Restrictions: Government work areas and facilities shall not be used by the Contractor as storage or staging sites unless explicitly coordinated with and approved in writing by the COR and the AvMC Facilities and Logistics Division.
• Operational Interference: The Contractor shall plan and execute all deliveries and installations to ensure minimal disruption to ongoing Government operations and personnel.
Delay and Storage Management
In the event of an unexpected delivery delay or to facilitate scheduled installation coordination, the Contractor shall provide secure, off-site storage for all associated property.
• Pricing: Pricing and terms for required storage space shall be negotiated at the time of individual TO award.
• Liability: The Contractor shall remain liable for all property in storage until final delivery, installation, and Government acceptance.
Debris Removal and Cleanliness
-27
-R
The Contractor shall remove all rubbish, padding, packing/crating materials, and shipping containers from Government premises on a daily basis throughout the duration of the project.
• Government Dumpsters: The Contractor is strictly prohibited from utilizing Government-owned or Government-leased dumpsters in the performance of any contract requirements. All waste must be disposed of off-post in accordance with local environmental regulations.
Design packages must contain, but are not limited to, the following elements:
• FF&E Layout and Planning Schematics;
• 2-D CAD Designs, Elevations and 3-D Renderings;
• Technical Drawings, Schematic Details and Installation Plans;
• Material Finish Selections/Schedules;
• Product Specification and descriptions;
• Cut Sheets and Product Brochures;
• Evaluation, Inventory and Charting of existing furniture;
• As-Built Plans, Relocations Plans and Implementation Schedules;
• Reconfiguration Planning Documentation;
• Cost estimations for future FF&E procurement budget planning.
Procurement and Implementation Services
The Contractor shall provide order-entry ready solutions for required new commercial and professional-grade FF&E products, encompassing commercial office furniture, laboratory furniture and outfitting solutions, and other architectural products required for implementing design package plans and individual task order requirements. FF&E must meet Government-specified standards for durability, safety, ergonomics, and interoperability with existing furniture inventories.
The Contractor shall manage the order and delivery planning, ensuring FF&E is procured within established lead times and in accordance with Government budget and ordering procedures. The Contractor shall supply a bill of materials for all task orders.
Contractor shall review all documents with COR and Tech POC prior to procurement for final approval. The Contractor shall deliver and install all FF&E in accordance with manufacturer specifications and Government requirements. Installation must include leveling, anchoring (when required), alignment, panel configuration, placement, and cleanup of all related packing materials. The Contractor shall provide all Computer- Aided Design (CAD) file(s), pdfs and documents for all furniture/equipment installed.
The Contractor's procurement and assembly tasks must include:
-27
-R
• The Contractor shall provide FF&E solutions based upon Government-approved design package plans and individual task order requirements for commercially available FF&E requirements as determined by AvMC Facilities Division and its space standards and must ensure all items are completely and properly assembled/installed. The Contractor shall coordinate with the manufacturer(s) to provide warranty information to the COR and tech POC, as applicable. FF&E requirements must include, but are not limited to:
• Furniture will include systems furniture products, case goods, conference tables, occasional tables, laboratory/workbenches, console, and café/dining pieces;
• Chairs (task/executive/conference/training/reception and auditorium seating, outdoor seating, lounge and collaboration spaces);
• Tables will include conference, meeting, dining, outdoor, and training tables;
• Cabinets, Shelving, Specialty Storage/Display and Fixtures (display cases, lateral files, filing cabinets, worktables, pedestal, credenza, lecterns, and bookcases, drafting tables);
• Appliances (refrigerators, freezers, microwaves, stoves/ovens/cooktops, coffee makers, ice makers);
• Wall Products (demountable, moveable, architectural wall products);
• Ancillary furnishings (trash cans, clocks, recycling bins, lighting/lamps);
• Window shades/blinds;
• Acoustic Paneling and noise reduction materials;
• Raised Flooring Products;
• Floor Coverings;
• Fitness Equipment;
• Outdoor furnishings (café’/dining, umbrellas/awnings/coverings, trash receptacles, benches, planters);
• Display and Communication Boards (Marker boards, Tack Boards);
• Electrical and Technology accessories (power/data ports, desktop power modules, wire management trays, monitor arms);
• Artwork/Graphics/Signage/Logos
The Contractor shall coordinate an strategy with the COR and AvMC Facilities Division.
The Contractor shall provide a detailed Bill of Materials (BOM) to be reviewed with the COR and Tech POC prior to order entry and to ensure compliance with the AvMC Facilities FF&E Standards Guidebook and site conditions. The Contractor shall verify all field measurements and conditions and is responsible for accurate design implementation based on such.
The Contractor shall coordinate the delivery and installation of requirements with the COR and AvMC Facilities Division not later than 4-6 weeks prior to the installation
-27
-R date as specified in individual task orders. Work areas (at Government site) must not be used as storage sites unless coordinated and approved by the COR and AvMC Facilities Division. The Contractor shall ensure delivery and installation of materials and equipment is performed with minimum interference to Government operations and personnel.
• The Contractor shall provide storage for property in a secured location in the event of an unexpected delay and/or to allow for proper coordination of installation. Pricing for storage space will be negotiated at the time of award of individual task orders.
• The Contractor shall remove all rubbish, padding, packing/crating materials and containers from the premises of the Government on a daily basis throughout the performance of the project. The Contractor shall not utilize Government dumpsters in the performance of the requirements set forth by individual task orders.
Facilities Change Management and Relocation Services
The Contractor shall provide all resources necessary to successfully perform the contract on-site and must communicate with the COR and attend Government meetings as necessary, to facilitate relocation and transition strategies and schedules.
• The Contractor shall perform the mechanical relocation, packaging, crating, physical transport, and setup of specialized lab equipment, furniture, wall art, and whiteboards as required by individual task orders.
• The Contractor shall perform packing and crating services, as necessary, for the protection of the furnishings, equipment, and related items to be relocated to include, but not limited to, boxing up files in supply/utility rooms. Computer, audiovisual and specialized Information Technology (IT) and laboratory equipment must be pad-wrapped or shrink wrapped. The Contractor shall be responsible for the relocation of all equipment not restricted by lease, warranty service, or maintenance agreement.
The Government will provide a listing of equipment to be relocated at the time of award of individual task orders. Equipment includes, but is not limited to, computers, projection screens, printers, security equipment, laboratory equipment, facsimile machines, and audiovisual equipment.
• The Contractor shall remove/disassemble property from the existing location, transport the property to the designated area(s) within the new location(s) and reassemble/place property in accordance with the direction and timelines specified in individual orders. The Contractor shall provide safe and efficient transportation of all property and must ensure all furnishings, equipment, and related items are clean and of sufficient quality after transporting to the new location.
• The Contractor shall color-coordinate multiple office moves on the floor plans, floor maps, or office layouts and move property in groups by office or area, as specified in individual task orders.
-27
-R
• The Contractor shall provide storage for property in a secured location in the event of an unexpected delay and/or to allow for proper coordination of installation. Pricing for storage space will be negotiated at the time of award of individual task orders.
• The Contractor shall remove all rubbish, padding, packing/crating materials and containers from the premises of the Government immediately or as stated in individual task orders. The Contractor shall not utilize Government dumpsters in the performance of this requirement.
• Documents generated under must be prepared and provided to the Government.
Deliverables
The USG may include any of the following Data Item Descriptions (DIDs) in task orders under this contractThe USG anticipates that the Contractor will submit all such data deliverables electronically and will provide specific instructions a the task order level. .
The Contractor will have an extra business day to submit deliverables due on a Saturday, Sunday, or on Federal holidays.
1. Installation Design Package IAW DI-FACR-82278 (CDRL A001);
2. DoD RMF Package IAW DI-MGMT-82001 (CDRL A002);
3. Implementation Plan – Order/Project Implementation Plan IAW DI-MGMT-81737
(CDRL A003);
4. Status Report – Contractor’s Progress, Status and Management Report IAW
DI-MGMT-80368 (CDRL A005);
5. DoD Documents IAW DI-MGMT-81644 (CDRL A006); and
Safety
The Contractor shall maintain a written Safety Plan and adhere to all OSHA, Army, and local Redstone Arsenal safety regulations during physical installations and relocations.
Anti-terrorism Level 1 Training.
Contract personnel, who as a condition of contract performance, require routine physical access to military installation or federally controlled facility shall complete Level I antiterrorism awareness training within 30 days of acquiring access and annually thereafter IAW the Defense Federal Acquisition Regulation Supplement (DFARS 204.72). Routine physical access is considered more than intermittent access.
Contractor personnel who require such routine access shall complete this training through a DoD-sponsored and certified computer or web-based distance learning instruction for Level I antiterrorism awareness or under the instruction of a qualified Level II antiterrorism awareness instructor. The contractor shall submit certificates of completion for each affected contractor or subcontractor employee to the COR. AT
-27
-R
Level I awareness training is available at the following website: https://jkodirect.jten.mil.
The contractor shall not bill the Government for this training as a direct charge.
IWatch Training.
Contractor employees shall report any suspicious activity to the COR and complete the following training within 30 calendar days of new contractor personnel commencing performance. The iWatch training video is available at the following website:
https://www.dvidshub.net/video/435077/iwatch-if-you-see-something-say-something.
Operational Security (OPSEC) Training.
All contractor personnel who, as a condition of contract performance, fall into at least one of the following categories: 1. Contractor personnel are required to work for 30 days on a military installation or DoD-controlled facility, or 2. contractor personnel will receive access to Controlled Unclassified Information or Classified Information shall complete Level I Operational Security Awareness Training within 30 days of the individual beginning performance IAW AR 530-1. Such personnel shall print certificates demonstrating completion and submit them to the COR or OPSEC coordinator. OPSEC awareness training is publicly available at the following website:
https://securityawareness.dcsa.mil/opsec/index.htm. The Contractor shall not bill the USG as a direct charge.
Access and General Protection/Security and Procedures/Identification
All contractor personnel shall comply with adjudication standards and procedures applicable upon establishing access to federal installation. Subsequently the contractor will follow and comply with Installation Commander's local policy and procedures for ID, security, facility access, and standards of conduct. Additionally, the COR, Technical Point of Contact, or KO will provide policies and procedures as they pertain to the contractor’s work environment as well as facility badge requirement. The contractor shall provide all required information for any background checks to meet interaction requirements with the installation Provost Marshal Office, Director of Emergency Services or Security Office. The contractor shall comply with all personal identity verification requirements. In addition to changes IAW the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may direct changes in contractor security requirements. The contractor shall return any Government-issued badges and CACs issued to its employees to the COR immediately upon resignation or termination of any contractor employee and upon contract expiration.
https://www.dvidshub.net/video/435077/iwatch-if-you-see-something-say-something
| Performance Work Statement (PWS) |
| Furniture, Installation, and Program Management |
File details come from the government source that posted it. Updated .