The file's text, extracted by GovTribe without its formatting.
RMAC 24-13 TECHNICAL REQUIREMENTS
1.0 Description of Requirement:
The contractor shall provide the following items as specified in the table below:
| Item Number |
| Part Description |
| Qty |
| Cost (USD) |
| J-A02048 |
| NVX7000Vertical Configured Mill |
| 1 |
| $359,000.00 |
| J-005338 |
| Fanuc_F0iMF |
| 1 |
| $0.00 |
| J-003261 |
| CELOS - ERGOline Touch |
| 1 |
| $0.00 |
| J-007580 |
| Standard spindle 14,000 min-1, 22/ 18.5 kW (#40) |
| 1 |
| $0.00 |
| J-007589 |
| Spindle Taper 7/24 Taper #40 (two-face contact)/ Grip CAT |
| 1 |
| $2,620.00 |
| J-007251 |
| Preparation for Center Through-spindle coolant system J-007251 |
| 1 |
| $0.00 |
| J-007600 |
| Retention Knob: Special (Center-Through) (7/24 Taper #40) |
| 1 |
| $3,880.00 |
| J-007575 |
| Tool storage capacity 30 tools (#40, STD) |
| 1 |
| $0.00 |
| J-G00428 |
| Usable Coolant Type: Water-Soluble Coolant |
| 1 |
| $0.00 |
| J-021791 |
| In-machine chip conveyor (spiral type) + external chip conveyor (hinge + scraper + drum filter type) |
| 1 |
| $28,700.00 |
| J-008010 |
| Interface for Through-Spindle Coolant System (7 MPa, Constant Pressure) |
| 1 |
| $5,980.00 |
| J-006013 |
| Through-spindle coolant/ air (switching specifications) (SK-OP) |
| 1 |
| $5,510.00 |
| J-006012 |
| Coolant gun for machining side |
| 1 |
| $2,490.00 |
| J-021391 |
| Shower coolant |
| 1 |
| $3,660.00 |
| J-056080 |
| Mist collector zeroFOG #2 (Built-in) (SK-OP) |
| 1 |
| $10,600.00 |
| J-021552 |
| Full-closed loop control for X, Y, Z-axis (Direct scale feedback) |
| 1 |
| $8,150.00 |
| J-001952 |
| In-machine measuring system (spindle) optical signal transmission type touch sensor (RENISHAW, OMP60) |
| 1 |
| $9,180.00 |
| J-006035 |
| In-machine measuring system (table) touch sensor (RENISHAW) |
| 1 |
| $4,190.00 |
| J-021329 |
| Signal lamp 3 layers (Red, yellow, green) LED type |
| 1 |
| $1,010.00 |
| J-015384 |
| Interface for EtherNet/IP (SK-OP) |
| 1 |
| $850.00 |
| J-015385 |
| Interface for Robot (EtherNet/IP), Need to select EtherNet/IP Interface |
| 1 |
| $790.00 |
| J-002210 |
| Multi dry filter (SK-OP) |
| 1 |
| $635.00 |
| J-G00950 |
| Voltage of Customer Factory 200 V |
| 1 |
| $0.00 |
| J-G00961 |
| Frequency 60 Hz |
| 1 |
| $0.00 |
| J-004472 |
| Setting Unit inch |
| 1 |
| $0.00 |
| J-007785 |
| Fast data server (excluding memory card) |
| 1 |
| $1,700.00 |
| J-008485 |
| E77550 Memory card for Data server (CF card 2 GB) |
| 1 |
| $155.00 |
| J-008240 |
| Part program storage length 2 MB (5,120 m) in total |
| 1 |
| $3,870.00 |
| J-008516 |
| AI contour control II + Fast data server (excluding memory card) |
| 1 |
| $7,480.00 |
| J-008115 |
| External high-speed skip (installation of high-speed skip terminal |
| 1 |
| $390.00 |
| J-000080 |
| Screen display English |
| 1 |
| $0.00 |
| J-011731 |
| IoTconnector (SK-OP) |
| 1 |
| $0.00 |
| J-011732 |
| NETservice (SK-OP) |
| 1 |
| $0.00 |
| J-011734 |
| Machine Data Connector (MDC) (SK-OP) |
| 1 |
| $0.00 |
| N/A |
| Transport costs |
| 1 |
| $4,800.00 |
| J-004965 |
| 3D Data Model (Skin model) |
| 1 |
| $1,650.00 |
| Z-COST01 |
| SV1: Standard Machine Installation |
| 1 |
| $0.00 |
| Z-COST06 |
| DMG MORI Connect |
| 1 |
| $1,000.00 |
| Z-COST07 |
| EG1: Standard Machine Training |
| 1 |
| $0.00 |
Additionally, this equipment must meet the requirements stated below:
· 3D machining capability with the following requirements:
· A minimum X-axis travel of 60 inches
· A minimum Y-axis travel of 29 inches
· A minimum Z-Axis travel of 25 inches
· Machine capability to accommodate a workpiece weight of a minimum of 4300 pounds
· Machine capability to accommodate a workpiece length of 65 inches
· Machine capability to accommodate a workpiece width of 25 inches
· The machine requires direct scale feedback
· The machine shall provide Z-axis drop prevention and centered door opening with and a minimum door opening of 65 inches which will allow for direct access to workpiece.
· MAPPS SIEMENS CELOS Controller
· Machine footprint must fit within an 18 foot by 18 foot space
2.0 Travel:
Travel is not required in the performance of this contract.
3.0 Deliverables:
The above items shall be delivered to the following:
US ARMY AMRDEC
RDMR-WDA-MPA (Attn.) Jennifer I Richman Building 5217, Room 111 Mills Road, Redstone, Arsenal, AL 35898 256-313-8788
CONTRACTORS THAT DO NOT REQUIRE CAC, BUT REQUIRE ACCESS TO A DOD FACILITY OR INSTALLATION: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
ACCESS AND GENERAL PROTECTION / SECURITY POLICY AND PROCEDURES: This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include associated sub-contractors employees shall comply with applicable installation, facility and area Commander Installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. The contractor workforce shall comply with all personal identity verification requirements (CFR clause 52.204-9, Personal Identity Verification of Contract Personnel) as directed by DoD, Department of the Army Headquarters, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. The prime contractor Human Resources/ Security Officer is responsible for the collection of all Redstone Badges and CAC cards issued to their employees. The Human Resources/Security Officer will then turn over these credentials to the COR. This applies when the contract expires; as well as, when a contractor resigns or is terminated. After accounting for all badges/ CACs, the COR will turn in the credentials at the One Stop Badging Office or CAC Office (MILPO). All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.