Atch_01,PWS_(NG-0060-18).pdf

PDF 46 KB Posted

Attached to
Calibration & Repair of a TS TACAN Generator, manufactured by Tel-Instrument Electronics
Solicitation number
W31P4Q-18-Q-0073
Issued by

About this file

PWS

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USATA-NG-0060-18

Attachment 01

PERFORMANCE WORK STATEMENT

FOR REPAIR AND CALIBRATION OF

TEL-INSTRUMENT T-47G TS TACAN

1.0 GENERAL. The U.S. Army Test, Measurement and Diagnostic Equipment Activity (USATA) has a requirement to acquire commercial factory repair and calibration of one Model T-47G, TS TACAN, Serial Number 210 manufactured by the Tel-Instruments Electronics Corporation of East Rutherford, NJ.

2.0 GOVERNMENT TASKS.

2.1 The government is responsible for shipment of the unit from USATA facilities at Corpus Christi, to the Contractor’s facility at the government’s expense. The units shall be shipped to the Contractor’s facility not later than 48 hours (less weekends and holidays) after receipt of notice of contract award.

2.2 The U.S. Army TMDE Activity, Redstone Arsenal, AL (Acceptance DODAAC:

W80RA6) shall be responsible for receiving, inspection and acceptance in DFAS Wide Area Workflow (WAWF) for all units.

3.0 CONTRACTOR TASKS.

3.1 Reference TEL-INSTRUMENT RMA Number 38748, Model T-47G (S/N 210), and the unit needs attenuator and battery need to be repaired. Unit needs replacement of those two components to be operational. Contractor shall provide repair and standard ISO 17025 calibration.

3.2 The Contractor shall furnish all labor, material and equipment required to provide repair and calibration of each item in accordance with the manufacturer’s specifications.

3.3 The Contractor shall not provide repair or other services outside the scope of this contract without authorization from the government Contracting Officer.

4.0 PLACE OF PERFORMANCE. Performance shall take place at the Contractor’s facilities.

5.0 PERIOD OF PERFORMANCE. See Section B of contract.

6.0 GOVERNMENT-FURNISHED EQUIPMENT. None.

7.0 QUALITY REQUIREMENTS. Not Applicable.

8.0 CONTRACTOR MANPOWER REPORTING REQUIREMENT – SERVICE

CONTRACTS.

USATA-NG-0060-18

Attachment 01

8.1 Department of the Army requires reporting of all contractor labor hours associated with services, to include calibration and repair, provided to United States Army organizations; therefore,

8.2 The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contractor for the U.S. Army TMDE Activity via secure data collection site. The contractor is required to completely fill in all required data fields using the following web address:

http://www.ecmra.mil, and then click on “Department of the Army CMRA” or the icon of the DOD organization that is receiving or benefiting from the contracted services.

8.3 Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30.

While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2018. Contractors may direct questions to the help desk by clicking on “Send an email” which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component’s CMR website.

http://www.ecmra.mil/

File details come from the government source that posted it.