W31P4Q-20-F-B006 (LSJ 12 Month Ext) rev7 KOLegalSigned_Redacted v2.pdf

PDF 4 MB Posted

Attached to
TECHNICAL SUPPORT OF AMCOM G-4 ENVIRONMENTAL AND OTHER FUNCTIONS
Solicitation number
W31P4Q20FB006P00057
Issued by

About this file

FAR Part 8 Limited Sources Justification Summary

This is a Justification Review Document for a FAR Part 8 Limited Sources Justification supporting a time-only extension to an existing federal contract. The U.S. Army Aviation and Missile Command (AMCOM) G4 seeks approval to award a non-competitive order modification to TORCH Technologies Incorporated (CAGE Code: 3CBV3) located at 4090 Memorial Parkway South, Huntsville, AL 35802-1382 for technical support services under General Services Administration (GSA) Schedule Number GS23F0321N Task Order W31P4Q-20-F-B006. The extension covers a 12-month period of performance from March 17, 2026 to March 17, 2027, providing continued technical support services for the Expedited Professional and Engineering Support Services (EXPRESS) Blanket Purchase Agreement.

The original task order was competitively awarded on September 17, 2020 for five years through September 16, 2025 as a Time and Materials/Labor Hour Hybrid contract. The current extension represents a logical follow-on to the existing FSS order addressing critical service continuity gaps between the current contract expiration (March 16, 2026) and the anticipated award of the follow-on recompete (December 29, 2026). Services include review of technical manuals, environmental impact assessments, ozone-depleting chemical documentation, engineering support for hazardous material reduction, and environmental compliance oversight at AMCOM facilities. The justification argues that TORCH possesses irreplaceable technical expertise, current personnel trained in AMCOM G4 procedures, and immediate operational knowledge; awarding to another contractor would create duplicative costs, training delays (6-9 months), and service disruption risks impacting warfighter safety and weapons system maintenance schedules. The market research confirms no other source can mobilize within the required timeframe. The estimated modification value and all pricing data are redacted in this document.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .