Sheet1 Technical Comments and Questions for W25G1V-22-R-0039 Small CNC Milling Machine
- Included from previous Question and Answer.
- New question and answer addition.
| Comment / Question | Technical Answer/Remarks | |
| 1 | SOW states that an existing VMC is to be removed and transported to another location at TYAD. Is contractor responsible for disconnecting from utilities and disassembling? | |
| UPDATED: The present proposed position for the new machine will not require another VMC machine to be removed. | ||
| 2 | Is system being removed for disposal or reuse? | UPDATED: The present proposed position for the new machine will not require another VMC machine to be removed. |
| 3 | How far from the original location is the existing VMC to be transported? | UPDATED: The present proposed position for the new machine will not require another VMC machine to be removed. |
| 4 | Regarding requirements stated in 2.0: #28 states 10,000 block look-ahead. Please confirm if this is accurate or a typo. | 10,000 is accurate |
| 5 | Regarding requirements stated in 2.0: #52 states that a chip conveyor is to be included. Please specify whether left or right discharge is required | Left discharge |
| 6 | Regarding requirements stated in 2.0: #61 states a requirement for a rotary table. Please provide the length, width and height of part being machined so that a rotary table accommodating said part size can be quoted. | 200 mm diameter rotary table |
| 7 | Regarding available power - please provide customer preference of 208V or 480V. | No preference, both are readily available. |
| 8 | In the SOW (Section 4.2) it states that a VMC is to be removed and transported to another location at TYAD. During the site visit, it was noted that there was NO VMC at the location of the installation. There was only a Bridgeport system there, and my attendees were told that the Bridgeport would be removed by government. Please confirm that the Bridgeport will be removed by the Government. | The present proposed position for the new machine will not require another VMC machine to be removed. The Government will remove the Bridgeport and a steel table from the area where the new machine will be located. |