20Q0165-03.pdf

PDF 380 KB Posted

Attached to
CUT AND STRIP SYSTEM AMENDMENT 03 Federal contract opportunity
Solicitation number
W25G1V20Q0165
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

View the file

Other files for this federal contract opportunity

Other files attached to CUT AND STRIP SYSTEM AMENDMENT 03, newest first.
File Type Posted
20Q0165-02.pdf PDF
20Q0165-01.pdf PDF
20Q0165.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE SCHEDULE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

AMENDMENT TO ADD THE FOLLOWING LANGUAGE TO THE STATEMENT OF WORK IN SECTION 7:

If it is not possible for the contractor to travel to Tobyhanna Army Depot due to official travel restrictions associated w ith COVID-19 or another unforeseen situation, the contractor shall virtually w alk government personnel through incidental start-up steps to place the system into service and ready for operation and provide virtual training per the same standards identified for in person training. The in person/onsite set-up and training is the desired method and virtual w ill only be accepted if off icial restrictions prohibit it.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 29-Jun-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W25G1V20Q0165

X 9B. DATED (SEE ITEM 11)

20-May-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Jun-2020

CODE

ACC-APG, TOBYHANNA DIVISION

11 HAP ARNOLD BLVD

TOBYHANNA PA 18466-5100

W25G1V 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W25G1V20Q0165

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 08-Jun-2020 10:00 AM to 06-Jul-2020 10:00 AM.

The following have been modified:

STATEMENT OF WORK

MINIMUM SPECIFICATION FOR

AUTOMATIC CUT AND STRIP SYSTEM

1. Scope

This specification defines the minimum requirements for a new Automatic Cut and Strip System for the Electronics Fabrication Division. This specification includes details for the purchase and training for a new automatic cut and strip system with the accessories defined in this specification.

2. Application

The automatic cut and strip system along with its accessories will be used to measure, cut, strip and mark wire for cable assemblies.

3. Requirements

3.1 Process/Performance Requirements The cut and strip system shall have a rotary head to provide for a rotary incision to cut cleanly through braided shield when necessary. The cut and strip system shall meet the following requirements as a minimum:

3.1.1 Wire gage: The cut and strip system shall be capable of measuring, cutting, stripping and marking wire from 32 to 2/0 AWG.

3.1.2 Wire size: It shall be capable of measuring, cutting, stripping and marking wire up to

.630” outside diameter.

3.1.3 Wire Length: The cut and strip system shall be capable of measuring, cutting, stripping and marking wire as short as 3 inches up to as long as 39,370 inches.

3.1.4 Stripping Length: The cut and strip system shall be capable of stripping up to 39,370 inches.

3.1.5 Pull-off Length: The cut and strip system shall be capable of up to 4.5 inches on the left and up to 9.5 inches on the right.

3.1.6 Stripping Applications: The cut and strip system shall be capable of the following strip applications as a minimum:

- Cut & Strip with partial or full pull-off, right and left

- Multi-stage stripping

- Multi-step stripping

- Jacket stripping of multi-conductor cable

- Stripping of very thin insulation

- Jacket stripping of multi-conductor cables and power cord with stripping of inner conductors

- Out-of-line cutting, separating and stripping

- Multi-step stripping of jacket and inner conductors

- And Multi-step stripping of shielded cables with or without processing the shield

3.1.7 Control The cut and strip system shall have a built in PC to control cut and strip operations. The control shall employ a minimum of a 10” color touchscreen monitor to provide user interface.

3.1.8 Accessories The vendor shall provide the following accessories as a minimum:

- Guide Tubes – Front and rear guide tubes shall be provided from 2mm through 18mm in 2mm increments. Any guides required for the rotary unit shall also be provided.

- Air injector, turret guide, cable recoil brake and transport belts shall be installed

- Wire Straightener - The cut and strip system shall include two wire straighteners to provide for quality cut, strip and marking.

- Interface – The cut and strip system shall include all interfaces, cables, encoders and etc that are necessary to provide it as a fully functional system.

3.1.9 Machine Size: The cut and strip system shall not require a foot print greater than 4’ by 4’.

It is acceptable to provide the equipment in a disassembled condition but the depot will not assemble the equipment. This will be considered part of the contractor’s installation.

3.2 Utilities

The cut and strip system shall operate on 120 VAC, single phase, 60 cycle power. The necessary power required and the amperes shall be stated in the proposal. The cut and strip system shall rely on regular shop air if it has a compressed air requirement. Shop air is approximately 90-100 PSI.

4. Safety

The cut and strip system shall be UL listed and meet all requirements set forth in OSHA General Industry Standards 29 CFR 1910, dated 1 July 1996. In addition it shall meet or exceed the National Fire Protection Association (NFPA) requirements of NFPA 79-1994, "Electrical Standards for Industrial Machinery." All energy control sources shall have the capability of being locked out and tagged out. The contractor's manuals shall detail the lockout/tagout procedures which are required to bring the cut and strip system to a zero mechanical state for maintenance or service procedures. Procedures to return from the zero mechanical state to full operational capability shall also be provided.

5. Documentation

The contractor shall provide two sets of commercial manuals with the cut and strip system. This documentation shall be provided at the same time as the machine delivery.

6. Delivery

a. Delivery of the cut and strip system shall be within 90 days of contract award.

b. Start-up/set-up shall be performed by the contractor not later than 15 days after delivery of the equipment and shall be completed within 5 days of start date. Start-up/set-up shall be completed per paragraph 8 of this specification.

c. Contractor shall coordinate delivery with the Government Point of Contact (GPOC) to include a pre-delivery notification at least 10 days prior to shipment of equipment.

7. Start-up/Set-up

Start-up/set-up responsibilities shall be shared between the Government and the contractor.

The Government shall unload the equipment from the truck, move it to the shop area, rough level the equipment, and connect the utilities(electricity and compressed air). The contractor shall then complete any incidental set-up in order to place the cut and strip system into service and ready for operation. All set-up shall be coordinated with the GPOC. All start-up/set-up shall be performed by English speaking U.S. citizens. All work shall be performed during normal working hours: Monday through Friday from 7:30 am to 4:00 pm Eastern Standard Time, excluding Federal Holidays, unless special arrangements are made with the GPOC. If it is not possible for the contractor to travel to Tobyhanna Army Depot due to official travel restrictions associated with COVID-19 or another unforeseen situation, the contractor shall virtually walk government personnel through incidental start-up steps to place the system into service and ready for operation and provide virtual training per the same standards identified for in person training.

The in person/onsite set-up and training is the desired method and virtual will only be accepted if official restrictions prohibit it.

8. Warranty

The equipment furnished under this specification shall be warranted for parts and labor for a period of 1 year from the date of start-up/set-up. IN THE CASE OF ANY COMPONENTS OR

SUBSYSTEMS WHICH COME WITH A WARRANTY FROM THE MANUFACTURE

THAT IS LONGER THAN A YEAR, THAT WARRANTY WILL BE PROVIDED TO THE

GOVERNMENT WITH THE OTHER REUQIRED DOCUMENTATION. THE EXISTANCE

OF WARRANTIES FOR COMPONENTS OR SUBSYSTEMS WHICH HAVE A DURATION

OF LONGER THAN ONE YEAR IN NO WAY NEGATES OR DIMINISHES THE

RESPONSIBILITY OF THE CONTRACTOR FOR PROVIDING WARRANTY OF THOSE

COMPONENTS OR SUBSYSTEMS FOR A PERIOD OF ONE YEAR AFTER THE DATE

OF start-up/set-up. There shall be single contractor accountability to prevent confusion of responsibility if a problem or breakdown occurs.

(End of Summary of Changes)