A07_Solicitation_W25G1V-18-R-0015.pdf

PDF 474 KB Posted

Attached to
Motorola Land Mobile Radio (LMR) Advanced Services
Solicitation number
W25G1V-18-R-0015
Issued by

About this file

Solicitation for W25G1V-18-R-0015, Motorola Advanced Services

View the file

Other files

File Type Posted
A03_J&A_Redacted.pdf PDF
A07_Attachment_1_Wage_Determination.txt TXT text file
A02_Pre-Solicitation_Amendment.pdf PDF
A01_Pre-Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W25G1V-18-R-0015 07-Feb-2018

b. TELEPHONE NUMBER

570-615-9051

8. OFFER DUE DATE/LOCAL TIME

03:30 PM 22 Feb 2018

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W25G1V9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

KRISTI-JO M NOEL

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W25G1V801904LO

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED ORX

SMALL BUSINESS

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ACC-APG DIVISION E

KRISTI-JO M NOEL

KRISTI-JO.M.NOEL.CIV@MAIL.MIL

P: 570-615-9051 F: 570-615-6794

TOBYHANNA PA 18466-5100

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W25G1V 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

SEE BELOW FOR SEPARATE SHIPPING INSTRUCT

XXX

XXX PA 00000

TEL: FAX:

570-615-6794FAX:

TEL: 570-615-9051 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$11,000,000

NAICS:

811213

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF66

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W25G1V-18-R-0015

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lot Motorola Advanced Services-Base Year

FFP

Motorola Advance Services for the maintenance of the Tobyhanna Army Depot (TYAD) LMR System infrastructure.

Period of Performance: March 19, 2018 to March 18, 2019 FOB: Destination

NSN: AASSVC801904LO

MILSTRIP: W25G1V801904LO

PURCHASE REQUEST NUMBER: W25G1V801904LO

NET AMT

0002 1 Lot OPTION Motorola Advanced Services-Option Year 1

FFP

Motorola Advance Services for the maintenance of the Tobyhanna Army Depot (TYAD) LMR System infrastructure.

Period of Performance: March 19, 2019 to March 18, 2020 FOB: Destination

0003 1 Lot OPTION Motorola Advanced Services-Option Year 2

FFP

Motorola Advance Services for the maintenance of the Tobyhanna Army Depot (TYAD) LMR System infrastructure.

Period of Performance: March 19, 2020 to March 18, 2021

0004 1 Lot OPTION Motorola Advanced Services-Option Year 3

FFP

Motorola Advance Services for the maintenance of the Tobyhanna Army Depot (TYAD) LMR System infrastructure.

Period of Performance: March 19, 2021 to March 18, 2022

0005 1 Lot OPTION Motorola Advanced Services-Option Year 4

FFP

Motorola Advance Services for the maintenance of the Tobyhanna Army Depot (TYAD) LMR System infrastructure.

Period of Performance: March 19, 2022 to March 18, 2023

0006 1 Lot OPTION Option to Extend-FAR 52.217-8

FFP

Note: Pricing shall not be submitted for the potential 6 month extension of services. Reference FAR 52.217-8.

This option may be exercised up to a total of six months in any interval at any time during contract performance.

As part of the price evaluation, the Government will evaluate the Option to Extend Services under FAR Clause 52.217-8 by adding one-half of the offeror's final option period to the offeror's total price. Thus, the offeror's total price for the purpose of the evaluation will include the Base Period, Option Year 1, Option Year 2, Option Year 3, Option Year 4 and one-half of Option Year 4. Offerors are required only to price the base and four options.

0007 Lot Contractor Manpower Report

FFP

This CLIN is applicable to all performance periods under the contract. The Accounting for Contract Services/Contractor Manpower Reporting requirement has been added to the performance work statement. The contractor is required to provide data on contractor manpower (including subcontractor manpower) for performance of this contract. This CLIN is not separately priced. Pricing should not be proposed.

PERFORMANCE WORK STATEMENT

Performance Work Statement Land Mobile Radio (LMR)

Motorola Advanced Services

Scope – Tobyhanna Army Depot (TYAD) has an operational Motorola Land Mobile Radio (LMR) System. The LMR System is a unique trunked Astro 25 network combining Radio-Frequency (RF), Internet Protocol (IP) addressing, vendor developed Voice Over IP (VOIP) and encryption technologies providing the primary means of communications during daily and contingency operations for TYAD security, fire, safety, emergency medical technicians, spill response teams, chemical, biological, radiological, nuclear (CBRN) response teams, etc. This System is critical to the execution of force protection, emergency response and support for mutual aid to the local community and Homeland security.

The period of performance is a Base year to commence March 19, 2018 through March 18, 2019 with four (4) one year options and one six month option for extension of services.

1. Motorola Advanced Services will primarily be provided remotely and shall include the following in support and maintenance of the LMR System at TYAD:

Network Upgrades Security Update Service

Security Technical Implementation Guidelines (STIGS) updates to Microsoft Window computers to maintain security that will keep the ASTRO 25 computers current will all known Microsoft security attacks

Remote Incident Management Network Event Monitoring 24X7X365 Annual Preventative Maintenance Onsite Support as required Remote Security Patch Installation Network Hardware Repair and support 24x7x365 Tiered Technical Support and customer service Network Hardware repair and support

1.1 Efficient Technology Updates.

Advanced Services shall extend the lifespan of the LMR network via planned updates.

This includes network software upgrades that keep the network secure and maintainable.

Network Preventative Maintenance (NPM) – Contractor NPM provides an operational test and alignment of infrastructure or fixed network equipment to ensure that it meets original manufacturer’s specifications. NPM detects potential issues before they have a chance to cause any malfunction or operational interruption.

Security Update Service (SUS) shall provide as a minimum:

o Routine testing and certification of updates in a dedicated Test Lab.

o Pre-testing of anti-virus definitions, Intrusion Detection Sensor Signatures and OS Patches.

o Weekly testing of anti-virus definition updates and Intrusion Detection

Signature Files.

o Monitoring for critical anti-virus definition updates with 24 hour turnaround for Category 4 & 5 Updates.

o Monthly testing of Microsoft Operating System Security Updates.

o Quarterly testing of Solaris Operating System Security Patches.

o Email notification when updates have been successfully tested and are available.

Security Technical Implementation Guidelines (STIGs) are the configuration standards for Department of Defense (DOD) Security Information Assurance (IA) and IA- enabled devices/systems. DOD STIGs contain technical security guidance to “lock down” information systems/software that might otherwise be vulnerable to a malicious computer attack.

Advanced Services will provide:

o STIG updates to Microsoft Window computers to maintain security that will keep the ASTRO 25 computers current will all known Microsoft security attacks.

o The STIGS updates provided will be validated and applied with proper integrity controls.

1.2 Remote Incident Management

Network Event Monitoring on a 24x7x365 basis shall provide the highest level of system availability to critical networks via:

Advanced alarm filtering for the most efficient network management.

Intelligent reporting capabilities and trend analysis.

Automated case and escalation management.

Immediate onsite repair at TYAD by the Contractor Technologist in the case of a severe problem that affects loss of communication. The Technologist will come onsite fully appraised of all problems from the alert detail received before he/she arrives onsite. The Contractor dispatch site will also be working on the resolution before and upon arrival with the technologist until all issues are resolved.

Continuous network monitoring by the Contractor’s highly trained and experienced Network Operations Center (NOC) technologist providing 24x7x365 coverage;

o Secure access to network monitoring by authorized NOC personnel.

o Contractor’s ISO 9001-certified Network Operations Center is equipped with fully redundant physical infrastructure that replicates TYAD’s site for troubleshooting and testing.

1.3 Additional Support Services

Advanced Services shall provide Tiered Technical support and customer service;

o One number to call for help on all issues.

o VIP Support with one Customer Service Representative dedicated to support the incident.

o Rapid and consistent incident escalation and resolution.

o Layered support - technologist shall engage development engineers if required to help resolve the most complex incidents.

o In house laboratory systems that can duplicate the incidents.

o Access to updated knowledge database of common issues and solutions to speed resolution.

Network Hardware repair and support shall cover the repair of all equipment manufactured and supplied by Motorola to include equipment from third-party infrastructure vendors:

o Advanced infrastructure repairs – automated testing equipment and “live system testing” for repairs.

o Motorola original replacement parts – original equipment designed and approved with Motorola Manufactured parts. All repairs shall be returned to original factory specifications.

o Up-to-date and automated test equipment – timely and accurate diagnosis to assure that all Motorola and third-party equipment is returned ON- SPEC per current and published specifications, regardless of specification version upon receipt by Motorola File Replaceable Units (FRU) available.

o Contractor will provide replacement equipment until TYAD’s equipment is repaired by the Contractor. The Contractor will provide spares of critical LMR system equipment.

Annual Preventative Maintenance - test and alignment of infrastructure and fixed network equipment to ensure that it meets original manufacturer’s specifications.

Monthly routine test and alignment and maintenance inspections shall be performed to improve system efficiency and downtime.

1.4 Service Delivery

1.4.1 The Contractor shall maintain continuous system uptime and availability by identifying system issues and taking corrective actions before the issues become apparent to TYAD. The solutions support center shall consist of ISO 9001 and TL 9000 certified Network and Security Operation Centers (NOC/SOC) that leverage ITIL processes and common service platforms for event monitoring, management and issue resolution.

1.4.2 The Contractor shall provide a factory repair depot to enable economies of scale and ensure TYAD’s equipment is quickly returned to the highest quality standards.

1.4.3 The Contractor shall provide dispatch service by a trained and qualified technician to diagnose and restore communication and maintain contact with the field technician until the issue is resolved and the case is closed. Dispatch will contact the assigned Contractor Service Partner to arrange for TYAD’s onsite technologist to arrive during working hours between 7:30 am and 4 pm, Monday thru Friday within 10 minutes and during non-working hours cases shall be responded to within 2 hours to perform first-level troubleshooting at the site. If the onsite Technologist is not available the Contractor shall provide an alternate Technologist while the onsite technologist is absent. If the Contractor technologist is unable to resolve the issue, it shall be escalated to the System Support Center or product engineering team as needed. Once the issue has been resolved, the System Support Center shall verify the resolution and with Government’s approval, close the case. A record of all service activities shall be available to provide a comprehensive history of site performance, system issues, and resolutions.

Note: Tobyhanna Army Depot currently has full-time on-site Motorola LMR technician under a separate contract vehicle. The Motorola Advance Services are primarily performed remotely at Motorola's Head Quarters.

1.4.4 Infrastructure repair with advanced replacement shall cover the repair of all equipment manufactured and supplied by Motorola, to include equipment from third-party infrastructure vendors. Repairs will be coordinated with TYAD and the Contractor’s Repair Shop. The Contractor’s comprehensive test laboratories will replicate the network to reproduce and analyze the issue. All troubleshooting, analyzing, testing and repair shall be done with state-of-the-art, industry-standard repair tools by ISO9001 and TL9000 certified processes and methodologies to ensure that repairs maintain the highest quality standards.

PERFORMANCE STANDARDS

Performance Objectives

Method of Surveillance

Incentive/ Disincentive

Network Event monitoring, to include management and issue resolution. Refer to PWS 1.2

100 % - Inspection of monthly event logs.

Positive or Negative performance evaluation

Onsite Support, Contractor will respond and resolve all problems within required time frame Refer to PWS

1.2 and 1.4.3

100% - Inspection of all service activity records.

Positive or Negative performance evaluation

Network Hardware Repair, no sustained outages due to part non-availability. Refer to

PWS 1.3

100% - Monitor repair of equipment and spares provided by contractor.

Positive or Negative performance evaluation

CONTRACTOR MANPOWER REPORTING APPLICATION (CMRA)

The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor shall report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The Army's objective is to collect as much significant Contractor Man-Year Equivalents (CME) data as possible to allow accurate reporting to Congress and for effective Army planning. Detailed instructions can be found on the Contractor Manpower Reporting Application (CMRA) website in the CMRA “Contractor User Guide” or “Subcontractor User Guide”. The contractor shall create an account upon entering the site and is required to completely fill in the required information at the CMRA website: https://cmra.army.mil.

The required information includes:

(1) Unit Identification Code (UIC) of the Army Requiring Activity that would be performing the mission if not for the contractor: W0MLAA

(2) Command of the Requiring Activity that would be performing the mission if not for the contractor: __________ [Enter the Major Command (MACOM) of the Requiring Activity here].

(3) Contracting Officer (KO) and contact information:

(Enter KO’s name, phone number, and email address).

(4) Contracting Officer’s Representative (COR) and contact information:

(Enter COR’s name, phone number, and email address).

(5) Federal Service Code (FSC) reflecting services provided by contractor (and separate FSC for each subcontractor if different). If there are multiple FSCs for an Order number, enter a separate data record for each FSC.

(6) Location where contractor and subcontractor(s) perform the service, including the city, state, zip code, and country. When service is performed at an overseas location, state only the city and country. If there are multiple Locations for an Order number, enter a separate data record for each Location. (Note: If there are many location records that need to be entered, the Bulk Loader function is available which allows the transfer of information from a contractor’s system to the secure web site. The Bulk Loader Template and Bulk Loader Instructions may be downloaded from the web site.)

(7) Contractor Type (prime or subcontractor).

(8) Direct labor hours (including subcontractors) for each FSC.

(9) Direct labor dollars paid this reporting period (including subcontractors) for each FSC.

(10) Weapons system support indication: __________ (Enter yes or no).

If subcontractors are used in the performance of this contract, several factors shall be considered. Contractor shall include, and require inclusion of, this term in all subcontracts at any tier under the contract in which services are being procured.

Contractor shall also enter their data in a timely manner, as subcontractors cannot input any information into the CMRA system until the Prime Contractor has entered their data.

The Prime Contractor has overall responsibility for ensuring subcontractors enter their respective data. Subcontractors are only responsible for entering Location Data.

Reporting period will be the period of performance not to exceed 12 months ending 30 September of each government fiscal year and shall be reported by 31 October of each calendar year.

DEPOT ACCESS FOR THE CONTRACTOR:

A background check and approval from Tobyhanna Army Depot (TYAD) Law Enforcement Branch is required for all contractor and subcontractor personnel prior to on-site access at TYAD. All persons seeking entrance to TYAD shall submit to and comply with all security standards and requirements in force at the time such persons are seeking entry. All contractors, regardless of resident status or citizenship, will be subject to vehicle search and intense in-processing by TYAD security personnel prior to being granted access to TYAD. This security screening process may be time consuming and access may be delayed or denied. The contractor shall ensure ELTY Form 648-C is completed for all contractor and subcontractor personnel requiring depot access to include warranty services. The TYAD point of contact (POC) will provide ELTY Form 648-C, “Request Access to Tobyhanna Army Depot” to the contractor/vendor at least ten days prior to the expected visit date for completion. The contractor/vendor shall return the completed ELTY Form 648-C to the TYAD POC in a timely manner so the same may be submitted to Security for processing no later than seven days prior to the visit. All of the required fields on the form shall be complete and accurate by the contractor/vendor for timely processing. This requirement is inclusive of on-site supervisory or managerial personnel and sub-contractor personnel that the Contractor anticipates will be performing work or visiting on-site. This security screening does not relieve the contractor of any responsibilities to conduct thorough pre-employment background checks and drug screening. Contractor workers will not be granted access to the work site until security screening is completed and access is approved. Any contractor personnel on-site who fail screening will not be permitted further access to TYAD. See “Access and General Protection/Security Policy and Procedures”.

Access and General Protection/Security Policy and Procedures. Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by TYAD Security Branch. Contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by the government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

Submit the completed ELTY Forms 648-C form(s) to the COR or POC.

SECURITY TRAINING REQUIREMENTS FOR THE CONTRACTOR

Antiterrorism (AT) Level I Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training prior to contract report date. This training is required for any additional or new contractor employees, who start after that period. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR/POC within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website:

http://jko.jten.mil/courses/atl1/launch.html for their training. Completion of contractor employee training will be documented on ELTY form 583, TYAD On-Post Training Record, or contractor equivalent. As applicable, contractor employees must complete annual AT awareness training as it pertains the length of the contract.

iWATCH Army Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH Army Program. This will consist of utilizing the tools and media products on the informational iWATCH Army website to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR/POC. The iWATCH training is available at the following website:

https://myarmyonesource.com select Family Programs and Services, in the drop down boxes select: Go To, iWATCH Army –“See Something, Say Something”. The contractor shall notify the COR/POC within 10 calendar days of review of the information on the website for any new employees or subcontractor personnel to assure the ELTY form 583 or contractor equivalent is properly documented. Completion of contractor employee training will be documented on ELTY form 583, TYAD On-Post Training Record or contractor equivalent.

Operations Security (OPSEC) Training. Per AR 530-1, Operations Security, contractor employees must complete Level I OPSEC training prior to the contract report date and for any additional or new contractor employees, who start after that period.

The training is available at the following website:

http://cdsetrain.dtic.mil/opsec/index.htm The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR/POC within 10 calendar days after completion of training. Completion of contractor employee training will be documented on ELTY form 583, TYAD On-Post Training Record or contractor equivalent.

All security training certificates shall be provided to the Contracting Officer’s Representative (COR)/Point of Contact (POC) and the Contract Specialist/Purchasing Agent.

CONTRACTOR SAFETY STANDARDS FOR TYAD

13 June 2017 abbreviated version. Contact the COR to see the full version.

Below are the contractor requirements for any work done on Tobyhanna Army Depot (TYAD). It is the responsibility of the contractor to enforce the below requirements.

Failure to enforce safety requirements on the depot can result in termination of the contract.

Important phone numbers

Emergency: 911 (or from a cell phone: 570-615-7117) Security: 570-615-7550 Fire Department: 570-615-7300 Safety: 570 615 7027

S.10.0 SAFETY REQUIREMENTS:

Contractors shall comply with:

Title 29 Code of Federal Regulations-1910 (OSHA General Industry Standards), Title 29 Code of Federal Regulations-1926 (Construction Industry Standards), National Fire Protection Association Codes, Uniform Facilities Code, other codes as required to maintain safety standards.

All Safety requirements as stated in the statement of work.

S 10.1 TYAD is a OSHA VOLUNTARY PROTECTION PROGRAM STAR SITE S.10.2 JOB HAZARD ANALYSIS (JHA) – Prior to the start of work, the contractor shall prepare a JHA for each phase of work that will be done under the contract.

S.10.3 SAFETY PLAN - Contractors with ten (10) or more employees will submit a written Contractor Safety Plan prior to beginning construction.

S.10.4 FALL PROTECTION – There are no certified anchorage points or permanent guardrail systems on any Tobyhanna Army Depot roof.

S.10.5 ELECTRICAL SAFETY – Follow the current Tobyhanna Army Depot standard.

This standard is based on NFPA 70E.

S.10.6 DEPOT REQUIRED PERMITS/APPROVALS:

1. Excavation:

2. Trenching:

3. Burning/fire: permits must be obtained daily from the Fire Department.

4. Use of cranes on the depot: see S.10.13 S.10.7 CONFINED SPACES: The contractor must request before entering any confined space area.

S.10.8 LOCKOUT/TAGOUT IS REQUIRED -

S.10.10 PROTECTION OF PERSONNEL: - At no time is any depot employee to be put at risk to illness or injury. No construction actions are exempt from this requirement.

S.10.12 IF AN INCIDENT HAPPENS: -

1. Any serious injury or medical emergency:

a. Dial 911 and give accurate location and nature of emergency. Make sure to tell the operator that you are calling from Tobyhanna Army Depot.

b. Send someone to the nearest exit to assist responders.

c. Treat victims to the best of your ability.

d. Call the work order desk at 570-615-7805 if there is any blood or body fluids that must be cleaned up.

2. In the event of the smell of natural gas:

a. Call the fire company at 570-615-7117 or dial 911.

b. Have all personnel evacuate the area, if the smell is significant.

c. Assist the fire company to determine the leak as appropriate.

3. In the case of a fire:

a. If the fire is small, use a fire extinguisher.

b. Otherwise, dial 911 and pull the fire alarm.

c. Evacuate the building.

THE CONTRACTOR IS RESPONSIBLE FOR JOB-SITE SAFETY.

IN ANY CONFLICT BETWEEN STANDARDS, THE STRICTER OF THE TWO SHALL

APPLY. IF UNSURE CONTACT TYAD SOHO at 570-615-7027

VISITOR RESTRICTIONS

TOBYHANNA ARMY DEPOT ON-SITE CONTRACTOR WORKFORCE AND VISITOR

RESTRICTIONS

1. NON-RESIDENT/NON-IMMIGRANT ALIENS

a. All non-resident/non-immigrant aliens must have approval prior to being permitted access to Tobyhanna Army Depot (TYAD). Such approval must be obtained by requesting access through the following: apply at the alien-resident’s embassy; proceed to the U.S. Embassy; proceed to the Department of the Army; proceed to Army Materiel Command; proceed to U.S. Communications-Electronics Command; proceed to TYAD.

b. All non-resident/non-immigrant aliens granted access to TYAD are required to be escorted by Government personnel. One Government escort can accommodate a maximum of two non-resident/non-immigrant aliens.

c. Due to limited availability of Government personnel, contractors shall not be permitted to employ non-resident/non-immigrant aliens as part of the contractor’s on-site workforce. Limited exceptions to this restriction may be considered on a case-by-case basis. Such exceptions shall only be considered where a specialized skill or trade is not otherwise available, and even under such circumstances would only be considered for very limited duration, e.g., a few hours/days. However, even if limited exception is considered, access may still be denied. Contractors whose personnel are either denied entry to TYAD or permitted limited entry to TYAD due to the security requirements pertaining to non-resident aliens/non-immigrants are not relieved of their obligation to provide the required contract performance and must do so at no additional cost to the Government. Any contractor failing to perform or that fails to perform in a timely manner under such circumstances may be terminated for default or other contractual remedies as appropriate.

d. Due to limited availability of Government personnel, visitors requiring escort may not be permitted access, or access may be limited to a certain time and duration.

2. FOR THE PURPOSE OF FORMAL ESCORTED SITE VISITS

Resident aliens (immigrants) in possession of a valid Form I-551, Alien Registration Receipt Card (“Green Card”), are not required to obtain approval as set forth in paragraph 1.a. above (but see paragraph 5, below). Such individuals must have proper identification in addition to a valid form I-551 in their physical possession at all times while at TYAD. Individuals lacking proper identification and valid form I-555 will be denied access to TYAD.

3. SECURITY SEARCHES, IN-PROCESSING, AND SECURITY SCREENING

All persons seeking entrance to TYAD must submit to and comply with all security standards and requirements in force at the time such persons are seeking entry. All visitors and contractors, regardless of resident status or citizenship, will be subject to vehicle search and intense in-processing by TYAD Security personnel prior to being granted access to TYAD. This security screening process may be time consuming and access may be delayed or denied.

Any Contractors who will be working on site, company representatives who will be visiting periodically, and any companies or contractors requesting or requiring TYAD badges for other business reasons must submit a completed TYAD form 648-C to their contract or depot point of contact. The completed form must be submitted at least five

(5) workdays in advance of on-site performance for each employee intended for onsite performance or five (5) workdays in advance of visits or other business at the depot.

Any contractor employee (s) already on site who have not been screened, will be subject to security screening. This requirement is inclusive of on-site supervisory or managerial personnel and sub-contractor personnel that the Contractor anticipates will be performing work or visiting on-site. This security screening does not relieve the contractor of any responsibilities to conduct thorough pre-employment background checks and drug screening. Contractor workers will not be granted access to the work site until security screening is completed and access is approved. Any contractor personnel on site who fail screening will not be permitted further access to TYAD.

4. SUBMISSION OF BIDS OR PROPOSALS

Bidders/offerors who hand carry bids or quotes do so at their own risk. Bidders/offerors are solely responsible for the timely submission of bids /proposals/quotations, any delays security measures notwithstanding.

5. CONTRACTOR ON-SITE WORKFORCE – ADDITIONAL SECURITY

REQUIREMENTS

A. This section is in addition to the requirements above regarding non-resident aliens (non-immigrants) for on-site performance. Prior to the commencement of performance under the contract and within seven (7) workdays of contract award, the Contractor shall submit to the Chief, Security Division, Tobyhanna Army Depot, a roster of all contractor personnel, inclusive of on-site supervisory or managerial personnel and sub-contractor personnel, that the Contractor anticipates will be performing work on-site. The roster shall indicate which individuals are U.S. citizens and which are resident aliens (immigrants). The following documentation shall accompany the roster for each individual named on the roster as a resident alien (immigrant):

a) A copy of a verifiable form of identification, such as a driver’s license or a passport; and

b) A copy of a valid Department of Justice Immigration and Naturalization Service Form I-551, Alien Registration Receipt Card (“Green Card”).

Contractors who fail to identify any and all resident aliens (immigrants) who will be used for on-site performance and who will seek access to Tobyhanna Army Depot as a worker for or through the contractor, inclusive of managerial and subcontractor personnel, may be subject to civil and criminal penalties and sanctions as well as contract remedies.

B. Within five (5) workdays of the submission of the roster, documentation, and TYAD form 648-C, the Government will have completed the security check and the Contractor shall be notified whether all listed personnel will be permitted to work on-site. However, actual access to Tobyhanna Army Depot by the roster personnel will remain contingent upon such resident alien (immigrant) individuals presenting two (2) forms of identification as they process into the Depot through the Security building: a valid Form I-551, Alien Registration Receipt Card (“Green Card”) in addition to at least one other verifiable form of identification.

C. The roster that the Contractor submits is amendable. However, up to five (5) workdays will be required to perform a security check on any personnel added to the roster. The Contractor is urged to include contingency or “back-up” personnel in the original roster in order to avoid delays due to roster amendment.

D. Contractors whose personnel are denied entry to TYAD due to the security requirements are not relieved of their obligation to provide the required contract performance and must do so at no additional cost to the Government. Any contractor failing to perform or that fails to perform in a timely manner under such circumstances may be terminated for default or be subject to other contractual remedies as appropriate.

The following Standard Specifications for Project, Motorola Advanced Services, applies to contractors for all work on Tobyhanna Army Depot.

Standard Specifications for Projects Under the

National Environmental Policy Act in Accordance with 32 CFR 651

Proponent ELTY-ISR-E

****Spill Response Procedures 1-2-3****

1. Stop work

2. Call 911

3. Evacuate Area

*********Damaged Asbestos?********* Call Environmental Branch (EB) at 615-

*******Environmental Questions?******

Call EB 615-7098

1. Air Pollution Control The contractor must control fugitive emissions, including dust, during the course of their contract. The contractor must obtain approval from the Environmental Branch (EB) prior to exhausting equipment to the outside. The contractor must not allow any pollutant or particulate matter to be released to the atmosphere at levels that are visible from outside of Tobyhanna Army Depot (TYAD). The contractor must not perform work that will release pollutants or particulate matter to the atmosphere when the wind speed exceeds ten miles per hour and will result in adverse effects to the surrounding areas.

TYAD will monitor the wind speed; it is the contractor’s responsibility to obtain wind speed information through the Contracting Officer Representative (COR).

2. Asbestos The contractor must ensure that all materials used in the performance of this contract are asbestos-free.

Unless specified in the contract, the contractor must not disturb any existing Asbestos- Containing Material (ACM) in the performance of this contract. If ACM, or suspect ACM might be disturbed in performance of this contract, the contractor must avoid coming in contact with the material and immediately notify the COR and the Contract Administrator in writing. The COR must coordinate with EB to have the material tested to determine if there is ACM. If the material is determined to be ACM and the contractor cannot avoid disturbing the material, the COR will notify the Contracting Officer. The Contracting Officer will direct a change pursuant to the contract clauses entitled “Changes” and “Differing Site Conditions.” If ACM, or suspect ACM has been disturbed, the contractor must immediately notify the COR and call the EB. The contractor will shut down and not move any equipment or supplies near the damaged ACM. The contractor will evacuate all non-contaminated contractor personnel from the immediate vicinity. Any contractor personnel thought to be contaminated with asbestos must remain in the area until the EB responds. If the damaged material is determined to be ACM and there is potential for further damage, the Contracting Officer will direct a change pursuant to the clauses of the contract clauses entitled “Changes” and “Differing Site Conditions.”

Asbestos abatement required under the contract as originally awarded must be in accordance with United Facilities Guide Specification 02 83 14 00 10 and as otherwise required in the contract. Asbestos abatement not required under the contract as originally awarded, can be incorporated into the existing contract via contract modification, or by the Government taking responsibility for the asbestos abatement.

The method of acquiring the abatement is at the discretion of the Government. The contractor must have an asbestos abatement work plan that has been approved by EB prior to beginning any asbestos abatement work.

3. Backflow The contractor shall have a backflow prevention device installed on all contractor equipment that is connected to Tobyhanna Army Depot’s (TYAD) water distribution system. The contractor shall have a water meter installed to monitor water consumption during all phases of the contract. Water use will be reported monthly to the Environmental Branch.

4. Burning The contractor must not burn refuse and debris anywhere on TYAD.

5. Buy Recycled-Content Materials The Contractor must comply with Resource Conservation and Recovery Act (RCRA) Section 6002 (42 U.S.C. 6962, Federal Procurement) in the acquisition of materials with recycled content to meet the standards of Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management; January 26, 2007.

Specific designated items in this contract for which recycled content standards have been established have been set forth in the specification (e.g., insulation, roofing materials, carpet, carpet pad, paint, floor tiles, shower and restroom dividers).

Recovered Material Certification: As required by the RCRA, the contractor must certify that the percentage of recovered materials to be used in the performance of the contract will be at least the amount required by the applicable contract specifications (see Federal Acquisition Regulation (FAR) Provision 52.223-4, Recovered Material Certification). Prior to application for final payment, the contractor must provide a report in accordance with FAR Clause 52.223-9, Estimate of Percentage of Recovered

Material Content for Environmental Protection Agency (EPA) Designated Items, to the Contracting Office. Compliance with this program does not relieve the contractor from meeting all other specification requirements.

6. Cultural Resources The contractor must not adversely affect any property listed on the National Register of Historic Places (NRHP) or properties eligible for inclusion on the NRHP without consultation and approval from the EB through the COR. If there is a discovery of any historic properties, including archeological sites and graveyards, work will cease immediately until requirements of National Historic Preservation Act, as amended, have been met. All archaeological artifacts found at TYAD or TYAD-controlled properties are U. S. Government property until a determination is made otherwise.

7. Demolition Notification If a project involves the demolition of any load-bearing structural members, whether or not asbestos is present, 25 days prior to the demolition, the Commonwealth of Pennsylvania Asbestos Abatement and Demolition/Renovation Notification Form 2700- FM-AQ0021 must be submitted to EB as specified in the Unified Facilities Guide Specification 02 83 14 00 10. The contractor may obtain a copy of the form from the

EB.

8. Drinking Water The contractor must not perform any work on the TYAD potable water system prior to obtaining approval from the EB and the Installation Planning and Maintenance Division certified operator through the COR. If a permit is required due to construction or proposed chemical feed changes, it will be the responsibility of the contractor to obtain all permits associated with the project. Permit applications will first be reviewed and approved by the Environmental Branch before being submitted to regulatory authorities.

Any piping or additions added to the TYAD water system must be disinfected following American Water Works Association circular C651-05 "Disinfecting Water Mains."

Construction will be kept outside of drinking water wellhead protection zones when feasible. All new buildings and remodeled buildings will be equipped with a water meter that can easily be read from the exterior of the building.

9. Endangered Species The contractor is responsible for meeting requirements of the Endangered Species Act of 1973. The contractor must not disturb any endangered species, their habitat or offspring during the implementation of this contract.

10. Emergency/Spills All emergencies and spills must be reported to the TYAD Fire Department by calling 911 from a TYAD phone or (570) 615-7300. If a 911 call is placed on a cell phone, the call will go to the Monroe County Emergency Office. Notify the Monroe County Emergency Office that you are at TYAD and the call will be forwarded to TYADs Fire Department. The contractor must ensure all personnel working on site are trained in the proper procedure according to 29 CFR 1910.120 (if applicable) to initiate a spill response to handle the hazardous substances they are working with. The contractor will take the necessary actions to prevent and contain spills of hazardous materials.

11. Energy Efficiency The Energy Policy Act of 2005 section 109 and the Energy Independence and Security Act of 2007 require all new construction at federal facilities to be 30% better than ASHRAE 90.1. Energy Policy Act of 2005 section 104 and the Energy Independence and Security Act of 2007 require all new equipment to be Energy Star qualified when available. This is applicable to heating, ventilation and air conditioning equipment, plumbing, building materials, lighting, commercial food service equipment and appliances.

12. Environmental Automation and Control Systems The contractor will not alter, modify, remove or tamper with any environmental automation or control system unless previous arrangement have been made with EB.

This includes sensors, programmable logic controllers, equipment housing, power supplies, meters or other hardware/sensor technology.

13. Erosion and Sedimentation Control The contractor shall protect streams, lakes and wetlands from sediment discharges caused by the contractor's activities. The contractor shall also provide (where applicable) an erosion and sedimentation control plan in compliance with state and local laws and regulations, to the COR for approval prior to executing any soil-disturbing activities. The contractor must submit a National Pollutant Discharge Elimination System Permit to the Pennsylvania Department of Environmental Protection (PADEP) prior to any construction activity that encompasses more than one acre. All permits must be reviewed and approved by the EB prior to being sent to any regulatory authority. The contractor shall not disturb any wetlands. Contractor will remove all silt fencing and other temporary control measures once the site is stabilized. Contractor will remove all spoils from TYAD unless a previously approved disposal site has been established. The contract COR will be responsible for management and control of the spoils disposal site.

14. Fluorescent and Mercury-Bearing Lamps The contractor is to collect, containerize, manage and recycle fluorescent and mercury-bearing lamps in accordance with 40 CFR 273, Standards for Universal Waste Management. A copy of the manifest/Bill of Lading must be given to the EB through the COR five days in advance of shipment by the contractor so that it can be reviewed for accuracy and completeness. The contractor must install low mercury bulbs when available.

15. Hazardous Materials Stored and Labeled The contractor must ensure all hazardous materials (HM) at the work site are properly stored and labeled. The contractor must not leave any HM behind at the completion of the job for any reason. HM must not be stored outside without adequate secondary containment and shelter.

16. Hazardous Waste The contractor must ensure that all hazardous wastes (HW) at the work site are properly stored and labeled in a pre-approved location designated by the EB. The contractor must provide copies of any shipping documents for HW/Universal Waste/Toxic Substances Control Act waste. If the TYAD EPA number is being used for shipping purposes, only EB is authorized to sign a manifest and the manifest (or copy) must be supplied prior to the day of shipment for review. The EB will keep originals. If HW or waste requiring special handling (e.g., asbestos) is being turned over to the government for disposal, the contactor must notify the EB through the COR when the waste is ready to be moved.

17. ISO 14001

TYAD is an ISO 14001 certified facility. All contractor and subcontractor employees on site must comply with TYAD Regulation 200-5, “Environmental Management System (EMS).” The contractor may obtain these regulations through the project COR.

18. Limit of Disturbance The contractor must confine the limit of disturbance of the project to the smallest area possible.

19. Mercury-Bearing Equipment The contractor must not install any equipment, switches, or devices (including thermostats) that contain mercury or lead.

20. Safety Data Sheets (SDSs) The contractor must submit SDSs for all hazardous materials proposed for use, including paints, solvents, adhesives, etc., to the EB through the COR five working days prior to material being brought on post. The contractor must keep a copy of all SDSs required for the project at the jobsite.

21. Migratory Bird Protection The contractor is responsible for meeting requirements of the Migratory Bird Treaty Act of 1918 (as amended). The contractor must not disturb any migratory bird, their nesting area or offspring during the implementation of this contract.

22. National Pollutant Discharge Elimination System (NPDES) Permits The contractor must not perform any work on existing NPDES structures or treatment units unless previously approved in writing by the Installation Planning and Maintenance Division certified operators and the Environmental Branch. This includes work within the sewage treatment plant, sewage lift stations, sewage conveyance pipes, Industrial Operations Facility pretreatment plant and storm water sewer systems. If a permit is required, it will be the responsibility of the contractor to obtain all permits prior to work being performed. All permit application packages must first be reviewed by the Environmental Branch prior to being sent to any regulatory authority.

23. Net Zero Water The contractor will minimize the use of potable water during the construction project.

Water used during the construction project will be monitored and measured using portable water meters if possible. Installed restroom equipment will consist of high-efficiency fixtures that use reduced volumes of water. Employ strategies that in aggregate use 20% less water than the water use baseline calculated for the building after meeting the Energy Policy Act of 1992 fixture performance requirements.

Automatic hands-free flushometers will not be used. Water-free urinals will not be used.

Flushometers will be the piston variety that fail in the closed position. New building construction and renovations will include installation of a water meter that is capable of being read from the outside of the building.

24. Noise The contractor must not allow the noise level to exceed 65 decibels at any point outside TYAD property. If noise levels exceed 65 decibels, a plan must be prepared by the contractor to mitigate the noise levels and submit to the EB for approval through the COR. The contractor will monitor the fence line to confirm this limit.

25. Ozone Depleting Substances (ODS) The contractor must be responsible for ensuring that all personnel who perform…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.