This Draft Performance Work Statement (PWS) details a non-personal services contract for the Military Intelligence Readiness Command (MIRC) to install a custom dropdown screen in a conference room at Fort Belvoir, VA. The project requires installing a 96" wide by 84" manual dropdown screen with a 3-foot diameter MIRC logo that retracts flush into the ceiling, specifically in Room 137 of Building 2470.
The contract is firm fixed-price with a 90-day performance period, requiring contractor personnel to have a Secret Security Clearance. Key requirements include providing all necessary hardware, using new and unused materials, delivering equipment with lift gate service, and ensuring all components are in working condition. Contractors must also complete AT Level I Training and report labor hours via a secure data collection site. The contract will be administered by a Contracting Officer Representative (COR) who will monitor technical aspects and perform inspections.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DRAFT PERFORMANCE WORK STATEMENT (PWS)
Military Intelligence Readiness Command (MIRC) Drop Down Screen
06 December 2024
Part 1
General Information
1. GENERAL: This is a non-personal services contract to provide military intelligence with a drop down screen for conference back drop. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. I Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government. The Contractor has no decision authority over the Government; the services and tasks outline within the PWS are non-inherently governmental functions.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, tools, materials, supervision, any other items, and non-personal services necessary to install a drop-down screen with the MIRC Logo.
1.2 Background: The Military Intelligence Readiness Command (MIRC) has installed a classified video teleconferencing system and requires a pulldown screen to block the view of wall mounted items.
1.3 Scope: The MIRC requires the installation of a dropdown screen that fits approximately and 8X8 ft section of wall. The dropdown screen shall have the MIRC logo printed on the screen and retract into the ceiling when no longer in use.
1.4 Period of Performance: The periods of performance shall be:
90 Days after Contract Award
1.5 General Information
1.5.1 Quality Assurance: The government shall evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied and the frequency of surveillance.
1.5.2 Recognized Holidays: Offices are closed on holidays. The contractor is not required to perform services on recognized holidays.
| New Year’s Day | Labor Day | ||
| Martin Luther King Jr.’s Birthday | Columbus Day | ||
| President’s Day | Veteran’s Day | ||
| Memorial Day | Thanksgiving Day | ||
| Juneteenth | Christmas Day |
Independence Day
1.5.4 Hours of Operation: The hours of operation will last no more than 8 business hours a day for the duration of the exercise, but may shift due to exercise constraints. Supporting hours will be within 0800-2000.
1.5.5 Places of Performance: Places of performance will be:
| MIRC HQ |
| 8831 John J. Kingman Road |
| Fort Belvoir, VA 22060 |
1.5.6 Type of Contract: Firm Fixed Price.
1.6 Security Requirements: Contractor personnel performing work under this contract shall have a Secret Security Clearance due to the intelligence training.
1.6.7. AT Level I Training. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within thirty (30) calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the GPOC or to the contracting officer, if a GPOC is not assigned, within thirty (30) calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil.
1.6.8. Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.9 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. The employees who require access to the site to perform work under this contract shall obtain a Government issued identification badge. FAR Clause 52.204-9 (Personal Identity Verification of Contractor Personnel) is applicable to this contract. The Contractor shall comply with agency personal identity verification procedures identified in the contract that implement Homeland Security Presidential Directive-12 (HSPD-12), Office of Management and Budget (OMB) guidance M-05-24, and Federal Information Processing Standards Publication (FIPS PUB) Number 201.
1.6.9.1 Compliance with Rules, Regulations, and Statutes. All contractor employees shall observe and comply with all applicable local, State, and Federal rules, regulations, and statutes including those concerning fire, safety, sanitation, security, vehicle safety, and hazardous material handling.
1.6.9.2 Entrance Denial by Military Police. Contractor employees may be denied entry to the Installation by Military Police if it is determined that such entry may be contrary to good order, discipline, or the security of the Installation.
PART 2
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
2. GOVERNMENT FURNISHED ITEMS AND SERVICES:
2.1 Facilities. The Government will provide office space, computer, access to a network printer/scanner/copier, desk and phone for all personnel on this task (if required). The Government may provide test servers and other equipment for testing preproduction applications prior to deployment (if required).
2.2 Utilities. The Government will provide all utilities in the facility and will be available for the contractor’s use in performance of tasks outlined in this PWS (if required). The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish their task.
***PWS PARTS 3 AND 4 HAVE BEEN INTENTIONALLY OMITTED***
PART 3
SPECIFIC TASKS
3. Specific Tasks:
| 3.1. | Basic Services: The Contractor shall install a pull down screen with the MIRC logo into the conference room at the back of room 137 in building 2470. |
| 3.1.1. | Provide and install all hardware and materials direct and ancillary to renovation tasks. |
| 3.1.2. | Necessary Components. The Contractor shall provide all components, hardware, and parts necessary for proper assembly, installation, and operation, even though certain items may not be specifically described in the specifications. |
| 3.1.3. | New and Unused Materials. All materials shall be new, unused, produced from current production components, and shall be delivered ready for use. No components may be used that are not included in the manufacturer's current parts catalogue for the items to be installed. |
| 3.1.4. | Technical Acceptance. Contractor shall furnish all labor, material, equipment and incidentals necessary to accomplish the requirements of this scope. The Government will not accept nonconforming materials and equipment supplied by the Contractor in all respects to contract requirements. The Contractor shall have an opportunity to correct or replace nonconforming supplies or services when this can be accomplished within the required delivery schedule. Correction or replacement must with no additional cost to the Government. |
| 3.1.5. | Material Delivery. Delivery of materials to Government facility for Contractor shall only be made during normal business work hours as outlined in the contract. Contractor shall make arrangement with the site for any delivery date that falls within two (2) business days of a U.S. Federal holiday. |
3.1.5.1. Lift Gate Service. The Government facilities do not have loading docks. Contractor shall ensure delivery carrier(s) used to fulfill the requirements of this contract provide lift gate service for all equipment supplied and delivered to Government when the aggregate weight of delivery exceeds 100lbs.
3.1.5.2. When applicable, Contractor shall supply and deliver all furnishings, supplies, and associated components in an effective, protected, and timely matter; all components/subcomponents shall be in working condition, undamaged and packed accordingly upon delivery.
3.1.5.3. Contractor shall obtain appropriate delivery acceptance signature at the site.
3.1.5.4. Responsibility and liability for loss or damage shall remain with the Contractor until final inspection and acceptance. Contractor shall deliver all equipment and components in an effective, protected, and timely matter.
3.1.5.5. Supplies, equipment, components, furnishings and such under this contract shall be in working condition, undamaged and packed to prevent damage upon delivery.
3.1.5.6. Contactor shall provide COR with delivery tracking information (when applicable) to include, as a minimum, shipment carrier and shipping number or bill of laden (BOL) information with an estimated delivery date and time.
| 3.1.7. | Measurements. Any distances provided in this PWS are approximations and should NOT be used for ordering materials or determining duct lengths. |
| 3.1.8. | Warranty. Equipment, materials, and components shall be delivered with manufacturer's standard commercial warranty from failure with normal use for the entire period specified in the manufacturer’s warranty beginning from the date of Government acceptance. Failure is defined as any defect in manufacturing that prevents equipment, components/subcomponents, materials or furnishings from operating in its normal intended manner. The Contractor must avoid actions that would invalidate a warranty, unless authorized by the COR. |
| 3.1.9. | Work Performance: The Contractor shall warrant that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, materials or design furnished, or workman-ship performed by the Contractor or/and sub-contractor or supplier at any tier. This Warranty shall continue for a period of one (1) year from the date of final acceptance of the work. If the Contractor fails to remedy any failure, defect, or damage within two (2) weeks of notification of dispute, the Government shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor’s expense. This Warranty shall not limit the Government’s rights under the Inspection and Acceptance clauses under this contract to latent defects, gross mistakes, or fraud. |
3.2. General Site Work. General site work shall be performed at all SCIF sites. At a minimum, the Contractor shall:
3.2.1. Provide own project management, site supervisor, and coordination.
3.2.2. Provide all necessary tools and equipment.
3.2.3. Provide own dumpster and hauling when applicable.
3.2.4. Progressively clean work area daily and remove all debris from the facility
3.2.5. Provide own storage unless arrangements with Government made for designated space
3.3. Dropdown Screen Install:
| 3.3.1 The contractor shall furnish and install a custom 96” wide by 84” manual dropdown screen that retracts into the ceiling. |
| 3.3.1.1 The contractor shall ensure the screen has a 3’ diameter Military Intelligence Readiness Command Logo (Attachment 002). |
| 3.3.1.2 The contractor shall modify the ceiling to add required to support the drops down screen. |
| 3.3.1.3 The contractor shall ensure the screen when closed is flush with the ceiling |
3.4 Contractor shall report ALL contractor labor hours (including sub-contractor labor hours) required for performance of services under this contract via a secure data collection site. The Contractor is required to completely fill in all required data fields using the following web address: https://sam.gov/content/entity-reportingReporting inputs will be for labor executed during the period of performance during each Government Fiscal Year (FY) which runs October 1 through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors can find User Guides, Frequently Asked Questions and may direct questions to the help desk at https://sam.gov/content/entity-reporting/.
PART 4
APPLICABLE PUBLICATIONS
4. APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
4.1. The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
4.2 JS-US007: Level I Antiterrorism Awareness Training
4.3 AR 381-12 Threat Awareness and Reporting Program, Section II Threat Awareness Training
4.4 AR 530-1 Operations Security, Chapter 4 Training Requirements
4.5 Federal Acquisition Regulation (FAR) subpart 37.114
4.6 Joint Travel Regulation (JTR)
File details come from the government source that posted it. Updated .