KTR Cost Breakdown Form.xls
XLS spreadsheet 185 KB Posted
- Attached to
- CSS 94033 - REPLACE SIDEWALK
- Solicitation number
- W15QKN25QA118
About this file
The file is a Contractor (KTR) Cost Breakdown Form Excel spreadsheet for a U.S. Army construction project to replace sidewalks at two United States Army Reserve Center (USARC) locations. The project involves sidewalk replacement at the Franklin USARC (1545 Airport Road, Franklin, PA 16323) and Crawford County Memorial USARC (1151 Morgan Street, Meadville, PA 16335). The spreadsheet provides a template for contractors to detail labor, equipment, material costs, and associated expenses, including categories for general contractor overhead, profit, bonding, and general & administrative costs. While the form is prepared for cost calculation, the actual cost amounts are not filled in on the current worksheet.
The solicitation is issued by the U.S. Army Contracting Command at Picatinny Arsenal under solicitation number W15QKN25QA118, specifically supporting the 99th Readiness Division's infrastructure improvement efforts. The document suggests this is a construction services procurement focused on sidewalk infrastructure replacement at two specific military reserve center locations in Pennsylvania, with a structured cost breakdown approach for potential bidders to complete.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet2
| ID | Sort | Type | Description (to include labor,equipment, material type and grade) | Quantity | Unit Measure | Labor in Manhours | Equipment | Material | Total Cost | ||||||||
| Crew (skill set) | Labor Hours | Total Hrs | City Cost Index | Unit Cost* | Total Labor Cost* | Unit Cost | Total Equipment Cost | City Cost Index | Unit Cost | Total Material Cost | |||||||
| Totals | |||||||||||||||||
| GENERAL CONTRACTOR | |||||||||||||||||
| OVERHEAD | $ - 0 | ||||||||||||||||
| $ - 0 | |||||||||||||||||
| PROFIT | $ - 0 | ||||||||||||||||
| $ - 0 | |||||||||||||||||
| BOND | $ - 0 | ||||||||||||||||
| G & A | $ - 0 | ||||||||||||||||
| GRAND TOTAL | $ - 0 | ||||||||||||||||
| Unit Cost* | Cost for one labor hour of the specified crew | ||||||||||||||||
| Total Labor Cost* | "=Unit Cost x Total Hours" |
File details come from the government source that posted it. Updated .