259th E-MIB LiteFighter Dragoon Tent SOW.docx
DOCX document 49 KB Posted
- Attached to
- LiteFighter Dragoon Tent
- Solicitation number
- W15QKN24Q0043
About this file
This document is a Statement of Work (SOW) for a supply order contract to provide the 259th Expeditionary Military Intelligence Brigade (E-MIB) with a LiteFighter Dragoon Tent. The Government seeks to enable the 259th E-MIB to better train and conduct expeditionary operations by purchasing this tent. The Contractor shall supply and deliver the LiteFighter Dragoon Tent meeting the specified technical requirements within 60 days of contract award. The Contractor must ensure timely and accurate material delivery, notify the Government of any lead time issues, and provide all necessary components and accessories. The Government will not accept nonconforming materials, and the Contractor will be responsible for any corrections or replacements at no additional cost. Delivery shall be made during normal business hours, with liftgate service required for aggregate weights over 100 lbs. The Contractor shall provide a warranty for the equipment and materials delivered.
The related federal contract opportunity is a Pre-Solicitation (Solicitation Number W15QKN24Q0043) seeking sources for the LiteFighter Dragoon Tent requirement in support of the 259th E-MIB. This is a single requirement, and the Government is conducting market research to identify qualified sources across all socio-economic categories.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI 259th Lite Fighter Tent.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Military Intelligence Readiness Command (MIRC) 259th E-MIB LiteFighter Dragoon Tent Date: 1 May 2024
PART 1
GENERAL INFORMATION
1. General: This is a supply order contract for commodities to provide 259th Expeditionary Military Intelligence Brigade (E-MIB) a LiteFighter Dragoon Tent. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1. Description of Supply/Introduction: The Contractor shall supply and deliver the LiteFighter Dragoon Tent as defined in this Statement of Work. The Contractor shall perform to the standards in this contract.
1.2. Background: 259th E-MIB conducts expeditionary operations and when setting up TOC operations and through the purchase of these tents, the unit would be able to better train and conduct expeditionary training. 259th E-MIB conducts expeditionary operations, capable of rapid deployment to support the war-fighter mission. The unit is required to work in field operations, setting up command (TOC) operations comprised of multiple staff sections to analyze the battlefield. Commander directs specific tentage to support operations to enable training to meet the Commander’s mission essential tasks and for training proficiency.
1.3. Objectives: The Contractor shall supply and deliver the contracted LiteFighter Dragoon Tent to support the 259th E-MIB:
1.3.1. Supply as specified in the technical specifications.
1.3.2. Ensuring timely and accurate material delivery of supplies
1.3.3. Immediately notifying the Government if lead times exceed award period of performance from receipt of order.
1.3.4. Ensuring timely and accurate material delivery of supplies
1.4. Scope: Supply and deliver the listed LiteFighter Dragoon Tent as outlined in Part 2.
1.5. Delivery Schedule: 60 days from contract award.
1.6. General Information
1.6.1. Recognized Holidays: For the purpose of this contract, “Federal Holidays” include the listed days of observance. Delivery shall not occur on the following Federal Holidays:
| New Year’s Day |
| Labor Day |
| Martin Luther King Day |
| Columbus Day |
| President’s Day |
| Veterans’ Day |
Memorial Day Juneteenth Day Thanksgiving Day Christmas Day
Independence Day
1.6.2. Hours of Operation: The Contractor is responsible for conducting business and delivering between the hours of 0900-1500 Monday thru Friday except Federal Holidays, or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
1.6.3. Delivery Location and Point(s) of Contact:
MSG Billy J. Hurley 92701 McCall Road
JBLM, WA 98433
Email: billy.j.hurley.mil@army.mil Phone (Work): 253-477-8497 DoDAAC:
1.6.4. Security Requirements: Contractor personnel performing work under this contract are not required to have a security clearance.
PART 2
Delivery Items, Specifications, and Requirements
2. DELIVERY ITEMS, SPECIFICATIONS; AND REQUIREMENTS:
2.1. LiteFighter Dragoon Tent Contractor shall supply and deliver Dragoon Tent (or equivalent) with the following specifications. Item number: GD5100-GRN.
2.2. Replacements and Substitutes. Contractor shall not make any replacements or substitution of materials of lesser value without the express written consent of the Government. Contractor shall only upgrade materials when no additional charges apply or when such upgrades have been approved in writing by the Contracting Officer.
2.2.1. Standard Components. Unless superseded by parts description specifications, the proposed network equipment shall include all components and accessories listed by the manufacturer as standard.
2.2.2. Necessary Components. The Contractor shall provide all components, hardware, and parts necessary for proper assembly, installation, and operation, even though certain items may not be specifically described in the specifications.
2.2.3. New and Unused Materials. All materials shall be new, unused, produced from current production components, and shall be delivered ready for use. No components may be used that are not included in the manufacturer's current parts catalogue for the items to be installed.
2.2.4. Technical Acceptance. Contractor shall furnish all labor, material, equipment, and incidentals necessary to accomplish the requirements of this scope. The Government will not accept nonconforming materials and equipment supplied by the Contractor in all respects to contract requirements. The Contractor shall have an opportunity to correct or replace nonconforming supplies when this can be accomplished within the required delivery schedule. Correction or replacement must be at no additional cost to the Government.
2.2.4.1. When applicable, Contractor shall supply and deliver all furnishings, supplies, and associated components in an effective, protected, and timely matter; all components/subcomponents shall be in working condition, undamaged, and packed accordingly upon delivery.
2.2.5. Material Delivery. Delivery of materials to Government facility for Contractor shall only be made during normal business work hours as outlined in the contract. Contractor shall make arrangement with the site for any delivery date that falls within two (2) business days of a U.S. Federal holiday.
2.2.5.1. Liftgate Service. The Government facility does not have a loading dock. Contractor shall ensure delivery carrier(s) used to fulfill the requirements of this contract provide liftgate service for all equipment supplied and delivered to Government when the aggregate weight of delivery exceeds 100lbs.
2.2.5.2. Contractor shall obtain appropriate delivery acceptance signature at the site.
2.2.5.3. Responsibility and liability for loss or damage shall remain with the Contractor until final inspection and acceptance. Contractor shall deliver all equipment and components in an effective, protected, and timely matter.
2.2.5.4. Supplies, equipment, components, furnishings, and such under this contract shall be in working condition, undamaged and packed to prevent damage upon delivery.
2.2.5.5. Contractor shall provide the following information (when applicable) to the POCin performance of this requirement at the time of delivery (unless otherwise specified):
a) Bill of Materials (BOM)
b) Manufacturer manuals delivered with new equipment Warranty. Equipment, materials, and components shall be delivered with manufacturer's standard commercial warranty from failure with normal use for the entire period specified in the manufacturer’s warranty beginning from the date of Government acceptance. Failure is defined as any defect in manufacturing that prevents equipment, components/subcomponents, materials, or furnishings from operating in its normal intended manner. The Contractor must avoid actions that would invalidate a warranty, unless authorized by the COR.
File details come from the government source that posted it. Updated .