0011519466

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Page 2 Summary of Changes

Sign and return page 1 of all amendments

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Sep-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W15QKN20Q5399

X 9B. DATED (SEE ITEM 11)

24-Aug-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Sep-2020

CODE

US ARMY CONTRACTING COMMAND

5418 S. SCOTT PLAZA

JOINT BASE MDL NJ 08640

W15QKN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W15QKN20Q5399

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0003

The purpose of this amendment is to execute as follow:

1. Modify answers to questions and answers provided in Amendment 0001

Q1: Telecom descriptions of work task list for all buildings mention installing a conduit for grounding of communication equipment. What size conduit is required? What size ground wire is required? Where is this conduit being run too?

A1: 3/4 inch EMT conduit is required. Number 8 copper ground wire is required. Conduit is being run to the nearest water pipe or building steel.

Q2: Are there any requirements to install electrical outlets for the new telecom equipment?

A2: No

Q3: Section 1.2 Item 0001 Phase 3 first paragraph list building 602 as one of the buildings to get telecom but this building is not mentioned anywhere else in the solicitation. Is this building part of the project?

A3: Building 602 is not to get any telecom. Building 601 is one of the buildings to get telecom and should be listed in the solicitation

Q4: General requirement 1.1 C, Phase 4 list buildings 637,638,656,657,658,673 as the buildings to get new conduits and new Master Boxes but with the drawings provided there are also drawings for buildings 680&681. Are buildings 680&681 part of this project?

A4: Yes, Buildings 680 is part of the project and should be listed in the solicitation, however Building 681 is not.

Q5: Who will provide the exact locations of the new Master Boxes?

A5: Fort Devens DPW will provide the exact locations of the new Master Boxes and they are provided in the attached drawing.

Q6: Item 002 task list 2 says to provide new conduit runs from existing master boxes to new master box locations. Shouldn’t the new conduits and wiring go to the new 4 inch PVC Conduits that are run underground?

A6: Yes that is correct, the new conduits and wiring go to the new 4 inch PVC Conduits that are run underground.

Q7: Are the old master boxes remaining and being used as a junction box?

A7: The only building within the scope of the project with an existing Master Box is Building 680 which is presently functional and needs to remain as such.

Q8: Is it part of this project to remove any old master box wiring and conduits? Or is the old existing master box wiring and conduits that are not being reused to remain?

A8: Again, The only building within the scope of the project with an existing Master Box is Building 680 which is presently functional and needs to remain as such. Old and existing master box wiring that shall be removed as part of the contract is present at Buildings 656 and 680.

W15QKN20Q5399

2. All other terms and conditions remain in full force and effect.

The following have been deleted:

AMENDMENT 0001

(End of Summary of Changes)