QUESTIONS AND RESPONSES SOLICITATION W15QKN‐20‐Q‐5221
CONSTRUCTION PROJECT CSS# 12495
1. The SOW notes that every employee is required to conduct online AT Level 1 Training. It also says there will be specific iWATCH Training and possibly OPSEC Training. Will iWATCH and OPSEC be provided on site? How much time should we plan for these training sessions?
RESPONSE: Please refer to the Specifications of Work (SOW) Section 11.1.1 through 11.1.6 for all
Security related training requirements.
2. Is testing required of spoils removed from site?
RESPONSE: No testing is not required
3. Will receipts be required for disposal?
RESPONSE: No, however the contract will dispose of materials IAW all state, federal and local regulations.
4. Are slats to remain in fence?
RESPONSE: yes
5. At the onsite walk down, the escorts requested that the gate be installed to open outward for snow removal, opposite from how it exists, is this request to be additional or part of scope?
RESPONSE: This is to be part of the scope for the gates to open outward
6. It was identified that existing conduits on gate are cracked and expose the inner wire. Is it part of this scope to replace? And if so, how much conduit will need to be replaced?
RESPONSE: Yes, 6 LF of flexible conduit
7. Are shop drawings required in Mylar and PDF/CAD Files per SOW 10.3.6?
RESPONSE: PDF only