W15QKN-19-R-1049-Amendment_0001.pdf
PDF 1 MB Posted
- Solicitation number
- W15QKN-19-R-1049
About this file
Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W15QKN-19-R-1049.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011326727
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Solicitation Number W15QKN-19-R-1049, Amendment 0001 is to incorporate a revised Appendix 1 w ithin the Scope of Work, due to the monthly total of 22,750 being incorrect. The new updated monthly total shall be 28,250.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W15QKN19R1049
X 9B. DATED (SEE ITEM 11)
26-Sep-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Sep-2019
CODE
US ARMY CONTRACTING COMMAND
5418 S. SCOTT PLAZA
JOINT BASE MDL NJ 08640
W15QKN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W15QKN19R1049
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been modified:
STATEMENT OF WORK
RAG WIPER SUPPLY CONTRACT
2 July 2019
Scope of Work (SOW)
99th Readiness Division (RD)
Scope of Work: The work to be performed under this project consists of providing the plant, equipment, safety equipment, tools, materials, and supervision to perform wiper supply outlined in this Scope of Work. The wipers will be provided at various maintenance facilities throughout the 13-state region of the 99th Readiness Division.
See Appendix 1 for a list of locations and quantities
The work shall be completed in accordance with paragraphs 1 and 2 and the requirements set forth herein, and include the requirement to perform the delivery of wipers and incidental related services. The contractor shall familiarize himself as to the exact nature of the work. The contractor must perform to the standards of the resulting contract.
All actions taken in executing work under this contract shall be fully compliant with federal, state, local, and Army regulations.
Period of Performance: The period of performance will be a 12 month base period with 4 each 12 month option periods.
Paragraph 1: Contractor shall provide overall contract management for wiper supply.
• Perform a quarterly 10% check with the facilities serviced to ensure work invoiced was performed and to gauge facility satisfaction with supplies provided.
• Forward requests for changes in supply to the designated contraction officer representative and ensure no changes are made to supplies without prior contracting officer consent.
• Attach work performed and supplies provided via the Wide Area Workflow system on a monthly basis (in an Excel format).
Paragraph 2: Wipers (aka rags) – provide cloth wipers for all designated facilities.
Wipers shall be delivered to those locations listed in Appendix 1.
• Wipers shall be approximately 18” x18”.
• Wipers shall be picked up and cleaned at vendor’s facility. Clean rags shall be delivered to replace the soiled ones. Cleaning activity shall comply with all local, state, and federal environmental regulations and not discharge contaminants into the environment.
• Clean wipers shall be free from any metal fragments.
• Wipers shall be delivered and picked up at each location on a monthly basis to each location on Tuesday, Wednesday, or Thursday between the hours of 8:00 AM and 3:00 PM. The contractor shall provide a delivery/pick up schedule for each location specified in Appendix 1 below.
• The contractor, not the government, is responsible for the management and quality control actions to meet the terms and conditions of the task order. The Government desires to maintain a quality standard for all tasks identified in the Statement of Work.
The Government is responsible for ensuring that it only pays for acceptable levels of service. Surveillance Methods: will include, Periodic Inspections, Periodic Observations, and Customer Complaints or Feedback.
ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)
AT LEVEL 1 TRAINING. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 5 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website:
http://jko.jten.mil or non-CAC card holders - http://jko.jten.mil/courses/atl1/launch.html
ACCESS, GENERAL PROTECTION, AND SECURITY POLICY AND PROCEDURES.
Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
iWATCH TRAINING. The contractor and all associated subcontractor employees shall brief all employees on the local iWATCH program (training standards are provided by COR/RFOS). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR/RFOS. This training shall be completed within 30 calendar days of contract award and with 30 calendar days of new employees commencing performance with the results reported to the COR/RFOS not later than 5calendar days after contract award.
OPSEC TRAINING. Per Army Regulation 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty and annually thereafter.
Appendix 1
(End of Summary of Changes)
File details come from the government source that posted it.