Attachment_7_PA118-Conneaut_Lake-A2-CSS-6631-Pictures-Install_solar_lights_around_MEP....pptx

PPTX presentation 7 MB Posted

Attached to
JOC Order Contracting Region A
Solicitation number
W15QKN-19-R-1041
Issued by

About this file

Pictures of the seed project.

View the file

Other files

File Type Posted
19-R-1041-AMENDMENT_0006.pdf PDF
W15QKN-19-R-1041_Amendment_0005.docx DOCX document
Amendement_0004_extend_till_20_July_2019.pdf PDF
Attachment_3_Region_A_Offeror_Past_Performance_Assessment_Request_Cover_Sheet-_Signed.pdf PDF
W15QKN-19-R-1041-0003_to_extend_the_due_date.pdf PDF
W15QKN-19-R-1041-0003_to_extend_the_due_date.pdf PDF
Attachment_3-Performance-Risk-Assessment-Questionaire_-_A.docx DOCX document
Attachment_1_Region_A_Pricing_Workbook-_REV_2.xlsx XLSX spreadsheet
19-R-1041_Amendment_0002.pdf PDF
Attachment_1_Region_A_Pricing_Workbook-_REV_1.pdf PDF
Amendment1-Revised_Pricing_Worksheet.pdf PDF
Attachment_3_Region_A_Offeror_Past_Performance_Assessment_Request_Cover_Sheet.docx DOCX document
Attachment_9_-_ASSISTv8_Instructions_to_Offerors.doc DOC document
PWS_Attachment-DD_FORM_2626-PERFORMANCE_EVALUATION_CONSTRUCTION.pdf PDF
Attachment_1_Region_A_Pricing_Workbook.xlsx XLSX spreadsheet
Solicitation_W15QKN19R1041.pdf PDF
Attachment_2-JOC_Region_A_MAP.pdf PDF
Attachment_4__PA118-Conneaut_Lake-A2-CSS-6631-SOW-_Install_solar_lights_around_MEP.DOC DOC document
CDRL_-_A002_Contractors_Safety_Plan_(9_JAN_19).pdf PDF
Attachment_8_Questions_and_Answers.docx DOCX document
Attachment_5_Davis_Bacon_Mercer_County.docx DOCX document
CDRL_-_A001_Quality_Assurance_Plan_(CORRECTED_9_JAN_19)_1.pdf PDF
Attachment_7_PA118-Conneaut_Lake-A2-CSS-6631-Archaeology_Map.pdf PDF
Attachment_6-Construction_Format_for_contractor's_proposals-Seed_Project....xls XLS spreadsheet
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Existing MEP View # 1

Existing MEP View #2

View of existing solar light pole located on the other side of the MEP

Existing solar light pole foundation 2’ above ground elevation and 2’ diameter.

Proposed location for the new Solar light poles

Solar light pole Illumination area

Solar light pole Illumination area image1.png image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.png image7.png image8.png

File details come from the government source that posted it.