Silica_Sand_--_QASP.pdf
PDF 293 KB Posted
- Attached to
- SILICA SAND Federal contract opportunity
- Solicitation number
- W15QKN-19-R-07TP
About this file
Silica Sand -- QASP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Silica_Sand_--_Contract_Data_Requirement_List.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP) for Silica Base Sand Program
PERFORMANCE REQUIREMENTS SUMMARY/QUALITY ASSURANCE SURVEILLANCE PLAN
Performance
Requirements
Performance
Measure
Performance Standard
Acceptable
Performance
Level
(APL)
Method of
Surveillance
Compliance
(Exceeded, Met or
Partially
Met)
Section III. –
AT level I training
Timeliness All contractor employees, including subcontractor employees, requiring access to Department of Defense installations, facilities, or controlled access areas shall complete AT Level I awareness training. within 45 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever applies and within 12 months prior to travel outside of the US, then annually thereafter.
45 calendar days after contract start date or effective date, and within 12 months prior to travel outside of the
US, then annually thereafter.
COR/COTR
Review
Section III. –
Access and
General
Protection/Se curity Policy and
Procedures.
Timeliness All contractor employees, including subcontractor employees, shall comply with all installation and facility access and local security policies and procedures and security/emergency management exercises.
The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal
Office, Director of Emergency
Services, or Security Office.
Contractor workforce must comply with all personal identity verification requirements (CFR clause 52.204-9, Personal Identity
Verification of Contract Personnel) as directed by DoD, HQDA and/or local policy.
100%
Compliance
COR in coordination with the installation & organization operations office
Contractor personnel working on an installation are required to participate in the Installation
Random Antiterrorism Measures
Program as directed.
Contractors may be subject to and must comply with vehicle searches, wearing of ID badges, etc. Failure to comply with policies and procedures could result in barred access onto the installation.
iWATCH
Training
Completeness All contractor employees, including subcontractor employees, shall receive training and participate in the local iWATCH program.
The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR.
45 calendar days after contract start
14 calendar days after completion of training by all personnel
COR/COTR
Review
For contractors that do not require CAC, but require access to a
DoD facility or installation.
Completeness Contractor and all associated subcontractor employees shall comply with adjudication standards and procedures using the
National Crime Information Center
Interstate Identification Index
(NCIC-III) and Terrorist Screening
Database (Army Directive
2014-05/AR 190-13); applicable installation, facility and area commander installation and facility access and local security policies and procedures (provided by
Government representative); or, at
OCONUS locations, in accordance with status-of-forces agreements and other theater regulations.
100% compliance
COR in coordination with the installation & organization
Government
Provided
OPSEC
The contractor is subject to compliance with the CCDC
Armaments Center Operations
Security Plan, per AR 530-1 (or
100% compliance
COR in coordination with the
Standing
Operating
Procedure/Pl an
DoDM 5205.02-M),. This SOP/Plan will specify the government's critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it.
installation & organization
OPSEC
Training compliance Per AR 530-1 (or DoDM 5205.02-
M), new contractor employees, including subcontractor employees, must complete initial (Level I)
OPSEC training within 30 calendar days of reporting for duty and must also complete annual OPSEC awareness training as provided by the appropriately designated OPSEC level II trained OPSEC
Officer/Coordinator.
100% compliance
COR in coordination with the installation & organization
Public
Release of
Information compliance Per AR 530-1 (or DoDM 5205.02-
M), an OPSEC review is required prior to all public releases. All government information intended for public release by a contractor will undergo a government OPSEC review prior to release.”
100% compliance
COR in coordination with the installation & organization
File details come from the government source that posted it.