PRICE_WORKSHEET_CT019-_MIDDLETOWN-_B8_-_CSS_15315-_IGCE-_Repair_Parking_lot_V2_11_26_2018.xls

XLS spreadsheet 56 KB Posted

Attached to
PARKING LOT REPAIRS, MIDDLETOWN, CT
Solicitation number
W15QKN-19-Q-1288
Issued by

About this file

PRICE WORKSHEET MUST BE COMPLETED BY CONTRACTOR

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet2

HQ 99th READINESS DIVISION (DIV-R) - INDEPENDENT GOVERNMENT COST ESTIMATE (IGE)
DIV-R SIGNATURES
CT 019 B8 CSS 15315PREPARED BY:
Reseal Parking lot
MG MAURICE ROSE AFRCREVIEWED BY:
375 Smith Street
Middletown, CT 06457APPROVED BY:
The HQ 99th RD project IGCE was developed utilizing RS Means CostWorks, 31st Edition.

This project IGCE was developed independently and prior to reciept of contractor proposal.

IDSortTypeUnit Line NumberDescriptionQuantityUnit MeasureTOTAL
Labor HoursCity Cost IndexLabor CostCity Cost IndexMaterial Cost
Pg 1128 32.01.13.66.0800Prepare and clean surface41,223.00SY0.0%0.00%
Pg 1128 32.01.13.64.3040Sealing random cracks, asphalt emulsion sand mix, 1/2"-1-1/2" wide1,531.00LF0.0%0.00%
Pg 1128 32.01.13.66.0012Fog Seal, 2 coal tar ptch emulsion, over 10,000 SY41,223.00SY0.0%0.00%
Pg 23 01.56.23.10.085028" high parking cones25.00Ea0.0%0.00%
Pg 23 01.56.23.10.0500Barricades, plastic, 8" x 24"15.00Ea0.0%0.00%
Pg 1145 32.17.23.13.0200Lines on Pavement, 6" wide1,000.00LF0.0%0.00%
Pg 1146 32.17.23.14.0800Lines on Pavement, parking stall lines, 4" wide317.00Stall0.0%0.00%
Pg 1145 32.17.23.13.0620Painted pavement markings, arrows or gore lines (crosswalks)1,000.00SF0.0%0.00%
Pg 1146 32.17.23.14.1210Handicap parking signs and post8.00Ea0.0%0.00%
Pg 1146 32.17.23.14.1200Handicap symbol8.00Ea0.0%0.00%
PG.54 02.414.19.19.0800Dumpster 10 c.y. (7 tons)1.00week0.0%0.00%
PG 54 02..41.19.19.0910Dumpster delivery fee1.00Ea0.0%0.00%
PG 54 02..41.19.19.0920Dumpster haul fee1.00Ea0.0%0.00%
PG 12 01.31.13.20.0160General Purpose Laborer, average3.00week0.0%0.00%
PG 12 01.31.13.20.0200Project Manager - Average2.00week0.0%0.00%
SUBTOTAL
OVERHEAD
G AND A
PROFIT
BOND
GRAND TOTAL
$ - 0
Totals