SOLICITATION_-_W15QKN-19-Q-1010_-_Grounds_in_Auburn,_ME.docx

DOCX document 150 KB Posted

Attached to
GROUNDS MAINTENANCE SERVICES - MG OLIVER O. HOWARD USARC/AMSA, 1072 Minot Ave, Auburn, ME 04210
Solicitation number
W15QKN-19-Q-1010
Issued by

About this file

SOLICITATION is now posted. Please read the entire solicitation before contacting for questions. The solicitation end date & time are included in the solicitation.

View the file

Other files

File Type Posted
Q&A_-_19-Q-1010.docx DOCX document
PWS_-_Grounds_Maintenance_-_Auburn_ME001.docx DOCX document
SITE_MAP_ME001_GROUNDS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W15QKN19Q1010

Section SF 30 - BLOCK 14 CONTINUATION PAGE

INSTRUCTIONS TO OFFERORS

INSTRUCTIONS TO OFFERORS/Addendum to FAR Clause 52.212-1, Instructions to Offerors – Commercial Items

1. The purpose of this solicitation is to procure Grounds Maintenance Services in support of the 99th Regional Support Command (RSC). Services shall be performed at the MG Oliver O. Howard USARC/AMSA # 160 (G), 1072 Minot Ave, Auburn, ME 04210.

2. The Government intends to award a single, firm-fixed-price contract. The period of performance for this effort shall be a 12-month base period and four, 12-month option periods from the date of contract award.

3. See Federal Acquisition Regulation (FAR) Clause 52.212-1, "Instructions to Offerors -- Commercial Items" and FAR 52.212-1, Addendum for additional information. This solicitation is being issued under FAR Part 12 utilzing FAR Part 13 procedures

4. Please see FAR Clause 52.212-2 "Evaluation- Commercial Items (OCT 2014) for basis for award.

5. See Basis of Award for additional information and evaluation criteria.

6. All services shall be performed in accordance with the Performance Work Statement.

7. Attachment: Site Map for MG Oliver O. Howard USARC/AMSA # 160 (G), in Auburn, ME.

8. The Site Visit date(s) and time(s) are below:

26 October 201810:00 AM EST
30 October 201810:00 AM EST

ALL VENDORS MUST CONTACT LESLIE GADSBY AT (603) 537-8166 OR VIA EMAIL IF THEY PLAN TO ATTEND. PLEASE ADVISE WHAT DATE YOU WILL BE ATTENDING.

Regional Facilities Operational Specialist (RFOS) Name: Leslie Gadsby Email: leslie.s.gadsby.civ@mail.mil, Phone: 603-537-8166

9. Contractors must be registered in System for Award Management (SAM) in order to be eligible to be awarded a Department of Defense (DoD) contract. If you need to register in SAM, please do so using the following link:

https://www.sam.gov/sam.

10. Contractor quotes must include:

a) Unit and extended pricing for all Contract Line Item Numbers (CLINs) for the base and option periods found in Section B of this solicitation. Insert proposed fixed-price unit and extended prices for each Contract Line Item Number (CLIN), to include the base period and all option periods. Prices shall not extend past the second decimal point for unit and extended amounts. The proposed price shall include all personnel, supplies, services, management, overhead, other directs costs, G&A, and profit to fulfill the contractual requirements of Performance Work Statement and any Technical Exhibits.

b) CAGE Code, DUNS Number, business-size standard, any small business preference such as 8(a) certified, HUBZone Certified, WOSB, etc.) and any other particular terms not mentioned in this quote.

c) Complete blocks 12, 17 and 30 of the SF1449 as well as any amendments. In doing so, the offeror accedes to the contract terms and conditions as written in the Request for Quote.

11. All offers shall remain valid for 120 calendar days.

12. Questions regarding this solicitation shall be submitted via email no later than 3:00 P.M. EST on 31 October 2018 to Contract Specialist, Amber Mears at amber.l.mears.civ@mail.mil and Contracting Officer, Sharon Wilson-Emmons at sharon.wilson-emmons.civ@mail.mil.

13. Offeror must submit both Technical and Price proposals.

14. Proposal is due no later than November 5, 2018 at 10:00 AM EST and shall be submitted electronically via the Federal Business Opportunities website.

15. Contractor Offers shall be submitted electronically via the Federal Business Opportunities (FBO) website at https://www.fbo.gov/ using the document upload option. Instructions are available, if needed, in the FBO Vendor Guide on the FBO website.

CONTRACT ADMINISTRATION

ADMINISTRATION INFORMATION

Contracting Officer Name: Sharon Wilson -Emmons Phone: (609) 562-6405 Email: sharon.wilson-emmons.civ@mail.mil

Contract Specialist Name: Amber Mears Phone: (609) 562-2567 Email: amber.l.mears.civ@mail.mil

RFOS/COR Site Visit Point of Contact Name: Leslie Gadsby Phone: (603) 537-8166 Email: leslie.s.gadsby.civ@mail.mil

Place of Performance MG Oliver O. Howard USARC/AMSA #160 (G) 1072 Minot Ave Auburn, ME 04210

PWS

PERFORMANCE WORK STATEMENT

Grounds Maintenance Services

FY – 2018-REV. 3

1. GENERAL. This is a non-personal services contract to provide grounds maintenance services in support of the 99th Regional Support Command. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract services providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1. DESCRIPTION OF SERVICES. The contractor shall provide all personnel, supplies, supervision, tools, materials, equipment, transportation and other items and non-personal services necessary to provide grounds maintenance services in accordance with this Performance Work Statement (PWS) except as those items specified as government furnished property and services. The contractor shall perform to the standards in the contract as well as all local, state and federal regulations.

1.2. OBJECTIVE: The result of this contract will maintain healthy grass, trees, shrubs, and plants and present a clean, neat, and professional appearance.

1.3. SCOPE. Grounds maintenance service applies to those areas identified in the site plan.

1.4. PERIOD OF PERFORMANCE. The period of performance shall be for one base year and four twelve-month option periods.

1.5. GENERAL INFORMATION.

1.5.1. QUALITY CONTROL. The contractor shall maintain effective quality control to ensure services are performed in accordance with this PWS. The contractor’s quality control is a means by which he assures himself that his work complies with the requirement of the contract.

1.5.2. QUALITY ASSURANCE. The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. The plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s). The Government will utilize the grounds maintenance inspection sheet found at Exhibit 2 to document quality of service provided.

1.5.3. HOURS OF OPERATION. The contractor is responsible for conducting business between the hours of 8:00 AM to 4:30 PM, Monday through Friday except Federal Holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar directed facility closings. No work shall be performed during non-duty hours, weekends or when the Government has no workforce on duty available for inspection of the Contractor’s work unless prior approval has been obtained. The contractor must maintain an adequate workforce for uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.

1.5.3.1. RECOGNIZED HOLIDAYS: Any reference to holidays shall be construed to mean the Government holidays listed below:

New Year’s Day1 January
Martin Luther King Day3rd Monday in January
Presidents Day3rd Monday in February
Memorial DayLast Monday in May
Independence Day4 July
Labor Day1st Monday in September
Columbus Day2nd Monday in October
Veteran’s Day11 November
Thanksgiving Day4th Thursday in November
Christmas Day25 December

When one of the above designated legal holidays falls on a Sunday, the following Monday will be observed as a legal holiday. When a legal holiday falls on a Saturday, the proceeding Friday will be observed as a legal holiday. If a holiday falls on a scheduled Contractor workday, the following proceeding workday will be used to schedule the work to be accomplished.

1.5.4. PLACE OF PERFORMANCE. The work to be performed under this contract will be performed at MG OLIVER O. HOWARD USARC/AMSA # 160 (G) , 1072 MINOT AVE, AUBURN, ME 04210.

1.5.5. TYPE OF CONTRACT. The Government will award a Firm Fixed Price contract vehicle.

1.5.6. PERSONNEL. The Contractor shall provide the Contracting Officer, and the Contracting Officer Representative (COR) or Regional Facilities Operational Specialist (RFOS) via email with a list of the names of employees or alternates to be employed in performance of the work 15 calendar days of performance start date. The Contractor shall also notify the COR or RFOS with any additions or deletions to the list of employees immediately.

1.5.6.1 Employees of the contractor assigned for performance of this contract shall be capable employees with sufficient experience and training to assure compliance with the contract requirements. The employees shall be required by the Contractor to maintain themselves and their clothing in a neat and clean manner. A fully qualified workforce shall be on board no later than the second week of the contract.

1.5.6.2. CONTRACTOR REPRESENTATIVE. The contractor shall provide an onsite contractor representative who shall be physically present during normal duty hours to conduct overall management coordination and furnish liaison with the government. The contractor representative shall be the point of contact with the government and shall have authority to act or make decisions for the contractor on all matters pertaining to this contract.

1.5.6.3. CONDUCT OF PERSONNEL. The Contracting Officer may require the contractor to remove from the job site any employee working under this contract for reasons of misconduct, security, or found to be or suspected to be under the influence of alcohol, drugs, or other incapacitating agent. Contractor employee shall be subject to dismissal from the premises upon determination by the contracting officer that such action is in the best interests of the government. The installation commander has the authority to bar individuals from the installation. Such removal from the job site or dismissal from the premises shall not relieve the contractor of the requirement to provide sufficient personnel to perform the services as required by this PWS.

1.5.7 IDENTIFICATION OF CONTRACTOR EMPLOYEES. All contract personnel working in situations where their contractor status is not obvious to third parties are required to identify themselves by wearing clearly written and visible nametags at all times, as such to avoid creating an impression in the minds of members of the public that they are Government officials.

1.5.8. ORGANIZATIONAL CONFLICT OF INTEREST. The contractor shall not employ any employee of the United States Government or the Department of Defense, either military or civilian, if such employment may create a current or subsequent Organizational Conflict of Interest (OCI) as defined in Federal Acquisition Regulation Subpart 9.5. The contractor shall notify the Contracting Officer immediately whenever it becomes aware that participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary.

1.5.9. SECURITY REQUIREMENTS. Contractor personnel or any representative of the contractor entering the Reserve Center shall abide by all security regulations and shall be subject to security checks. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.5.9.1. KEY CONTROL. If the contractor is provided with keys to allow access to areas requiring mowing, they shall ensure they are not lost or misplaced and are not used by unauthorized personnel. The contractor shall not remove the keys from the premises nor are these keys to be duplicated. All keys that are provided to the contractor will require a logged entry signed signature and date. Keys shall be retained in possession of the janitorial staff while on the premises and returned to the COR/RFOS prior to leaving the premises including a logged entry signed signature and date. All keys lost by Contractor’s personnel shall be reported to the COR/RFOS immediately and shall be replaced at the Contractor’s expense.

1.5.9.2. In the event keys, other than master keys, are lost or duplicated, the Contractor shall, upon direction of the Contracting Officer, Re-key or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock, or locks shall be deducted from the monthly payment due to the Contractor. In the event a master key is lost or duplicated, all locks and keys for that system shall be replaced by the Government and the total costs deducted from the monthly payment due to the Contractor.

1.5.9.3. At no time shall the contractor allow anyone other than authorized contractor personnel into any locked or unlocked areas of the facility being serviced.

1.5.10. VEHICLE OPERATION. Contractor personnel operating motor vehicles used in performance of this contract shall have a valid state operator’s license and shall operate all motor vehicles in accordance with policies and procedures established by the Reserve Center. The contractor’s vehicles shall have an identification tag clearly visible while on site. Parking by contractor employees shall be in non-reserved spaces available to the public.

1.5.11. CONSERVATION OF UTILITIES. The Contractor shall instruct employees in utility conservation practices. The Contractor shall be responsible for operating under conditions, which preclude the waste of utilities, which shall include, but not be limited to the following and other like items:

a. Lights shall be used only in areas where and at a time when work is actually being performed.

b. Heating, Ventilation and Air Conditioning controls shall not be adjusted by the Contractor’s employees.

c. Water faucets and valves shall be turned off after use.

1.5.12. SAFETY. The contractor shall maintain a safe working environment to prevent accidents and preserve the life and health of contractor personnel and Government personnel. The Contractor shall instruct employees in appropriate measures as specified by the applicable provisions of the Occupational Safety and Health Act, 1970, PL 91-596 (84 Stat 1590). The Contractor’s employees shall not place equipment in traffic lanes or other locations in such a manner as to create safety hazards.

1.5.12.1. The Contractor shall protect the safety and health of employees and of members of the public and minimize dangers from all hazards of life and property and shall comply with all Health, Safety, and Fire Protection regulations and requirements (including reporting requirements) of the Army and Safety and Health regulations issued by the Secretary of Labor in 26 CFR (1910) and any subsequent amendments. The Contractor shall permit safety inspections of all work being performed under this contract.

1.5.12.3. The information shall be recorded with the COR/RFOS and Contracting Officer within 24 hours of time of notification of occurrence to the contractor by the employee.

1.5.13. INTERFERENCE WITH GOVERNMENT BUSINESS. The Contractor shall schedule and arrange work so as to cause the least interference with the normal occurrence of Government business and a mission. In those cases where some interference may be essentially unavoidable, the Contractor shall be responsible to make every effort to minimize the impact of the interference and inconvenience of the customer.

1.5.14. PROTECTION OF GOVERNMENT PROPERTY

1.5.14.1. The Contractor shall assume full liability and responsibility for any loss or damage to Government property caused by his operations and shall assume full responsibility for any and all damages or claims for damage for injury to persons, property or equipment which might result from any service performed under this contract.

1.5.14.2. The Contractor shall return areas damaged as a result of work under this contract to their original condition, to include painting, refinishing, repairing or replacement of any/all curbing, soil, lawn, shrubs, fences, gates and handrails, if necessary.

1.5.15. ENVIRONMENTAL PROTECTION AND DISPOSAL FACILITIES:

1.5.15.1. The contractor shall dispose of, off the installation, all refuse and debris collected in accordance with this contract at a landfill or disposal site established and operated in accordance with the applicable Federal, State, and local laws and regulations. The contractor shall provide to the Contracting Officer the name, address and location of landfill and or other disposal sites at the pre-performance conferences and when changes occur.

1.5.15.2. The contractor shall comply with all Federal, State, and local laws and regulations regarding environmental protection. In performing this contract, the contractor shall not engage in any practice which places or might place the Government in violation of any law or regulation.

1.5.16. OTHER REQUIREMENTS.

1.5.16.1. The Contractor shall at all times observe and comply with, and shall cause all the agents and employees of the Contractor to observe and comply with, all such existing and future laws, regulations, ordinances, by-laws, orders and decrees; and shall protect and indemnify the 99th Reserve Support Command against any claim or liability arising from or based upon the violation of any such laws, regulations, ordinances, by-laws, orders and decrees, whether by the Contractor or its agents or employees.

2. DEFINITIONS. As used throughout this contract, the following terms shall have the meaning set forth below.

2.1. CONTRACTING OFFICER. The Contracting Officer is a person with the authority to enter into, administer, and/or terminate contracts and make related determinations and findings. The term includes certain authorized representatives of the Contracting Officer acting within the limits of their authority as delegated by the Contracting Officer.

2.2. CONTRACTOR. The term Contractor as used herein refers to both the prime Contractor and any subcontractors. The prime Contractor shall ensure that his/her subcontractors comply with the provisions of the contract.

2.3. CONTRACTOR REPRESENTATIVE. A foreman or superintendent assigned in accordance with paragraph 1.5.6.2.

2.4. REGIONAL FACILITIES OPERATIONAL SPECIALIST (RFOS). A designated individual who shall have the primary responsibility for assuring that all supplies, service or workmanship presented to or performed for the Government meet all conditions of the contract.

2.5. CONTRACTING OFFICER REPRESENTATIVE (COR). The Government employee designated by the Contracting Officer to be responsible for monitoring of Contractor performance.

2.6. PERFORMANCE REQUIREMENTS SUMMARY (PRS). Identifies the key performance indicators of the contract that will be evaluated by the Government to assure contract performance the contractor meets standards.

2.7. QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document used for quality assurance surveillance. The document contains specific methods to perform surveillance of the contractor for each item of the Performance Requirements Summary.

2.8. QUALITY ASSURANCE (QA). A Method used by the Government to provide some measure of control over the quality of purchased goods and services received.

2.9. QUALITY CONTROL (QC). A method used by the Contractor to control the quality of goods and services received.

2.10. DISPOSAL. Disposal is the process of spreading and covering in sanitary fills, spreading and covering in landfills, and dumping in public dumps, or other solid waste disposal facility.

2.11 Edging. The vertical cutting of the grass that goes into the soil. Along all mowing lines to include but limited to edging of sidewalks, gardens and walkways.

2.12 Trimming: Horizontal cutting of grass. Along all mowing lines to include but not limited to trimming of sidewalks, gardens, walkways and fence lines.

3. GOVERNMENT FURNISHED ITEMS AND SERVICES. The Government will provide the property and services listed below.

3.1. UTILITIES:

3.1. Government facilities shall not be used to power mowers, trimming equipment or other small maintenance equipment.

3.1.2. Water from existing sources.

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES.

4.1. GENERAL. The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS. Material, equipment, and supplies provided shall be of acceptable commercial grade and quality. Unsafe or unsatisfactory equipment will be replaced by the contractor.

4.1.2 Site Visit. It is urged and expected to have vendors conduct a site visit prior to submitting a quote/offer for the requirement as the Maps are always revised and the scope of the requirement can't be properly ascertained without a site visit. There will be an initial and alternate site visit for this requirement see instructions to offeror for details. The contractor is responsible for obtaining appropriate site maps and solicitation prior to visit, none will be provided at the site visit. The site maps provided are estimates only and MUST be verified by the contractor.

5. SPECIFIC TASKS.

5.1. The contractor shall provide the grounds maintenance services described herein. A description of the areas to receive grounds maintenance services is included in the applicable site plan.

5.2. Basic services shall be performed at the locations identified in the site plan. Any equipment (including waste containers) moved while performing basic services shall be returned to their original position.

5.3 SCHEDULE OF WORK. The contractor shall provide grounds maintenance services for the areas set forth on site map. The contract period for grounds maintenance service is March through November in the Southern Region and April through November in the Northern Region of the respective fiscal year indicated in the contract, unless otherwise approved by the contracting officer. Prior to commencing any work, the Contractor shall submit a schedule via email of operations to the COR or RFOS for approval. The mowing schedule shall be subject to change in order that the contractor’s operations do not conflict or otherwise disrupt normal operations of the government in the facility involved. In the event the mowing is not necessary when scheduled, the COR will contact the contractor 48 hours prior to the work scheduled. The cancelled mowing will be credited and if necessary rescheduled to another date at the discretion of the COR.

5.4. MAINTAIN GROUNDS

5.4.1. MOWING. All grass cutting equipment will arrive at the site with mowing blades in a sharp condition. Mowing shall include areas identified in the site map to include but not limited to embankment, parking lots, retention ponds, drain basins, displays and isolated areas. Contractor’s responsibility to maintain all areas to the commercial standards. This includes but not limited to overgrown areas that have not been maintained. To bring the area up to the commercial standard, the contractor is responsible to complete as specified on maps at no additional cost. The methodology to bring the property up to the standard is up to the contractor and not dictated by the Government. During the growing season grass shall be cut to a height no higher than three (3) inches and no less than two (2) inches. All clumps and/or clippings must be removed within four (4) hours after being cut. The Contractor shall remove and disposed off site, at no extra cost to the Government. Grass will be cut approximately every 14 days or as directed by the COR. Routine policing of the grounds will be conducted during mowing services and all site areas, walkways, and parking areas shall be kept free of debris/trash by either sweeping or blowing and disposed. The contractor is responsible to remove all branches or limbs (up to 2 inches in diameter) from the areas prior to mowing. The branches and limbs shall be removed off site.

5.4.2. EDGING: The edging will be completed within the 30 days of the start of the spring season and once in the fall cutting season or as prescribed by the COR/RFOS.

5.4.3 TRIMMING: All areas of the site must be properly trimmed during the period of performance as specified in PWS 5.3 schedule of work, or as directed by the COR. All walks, fence lines, plazas, and roadway curbs adjoining turf areas but limited to shall be cleanly trimmed and consistently maintained throughout the growing season.

5.4.4 Verification of services – The contractor shall submit accurate, clear and precise photographs of the service areas prior and upon completion of work within 24 hours from date of service to the appropriate RFOS’ official email. The location of the pictures to be taken is designated on the site map. It’s the contractor’s responsibility to obtain the email address within 5 calendar days after contract award. The contractor’s invoices will not be processed if photographs are not complete as required.

6. CONTRACTOR MANPOWER REPORTING (CMR)

The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the 99th RSC via secure data collection site. The contractor is required to completely fill in all required data fields using the following address: http://www.ecmra.mil, and then click on “Department of the Army CMRA” or the icon of the DoD organization that is receiving or benefitting from the contracted services.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk by clicking on “Send an email” which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component’s CMR website”.

7. ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC)

7.1. AT LEVEL 1 TRAINING. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 5 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website: http://jko.jten.mil or non-CAC card holders - http://jko.jten.mil/courses/atl1/launch.html

7.2. ACCESS, GENERAL PROTECTION, AND SECURITY POLICY AND PROCEDURES. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

7.2.1 For contractors requiring Common Access Card (CAC). RESERVED

7.2.2 For contractors that do not require CAC, but require access to a DoD facility or installation. RESERVED

7.3 Army Training Certification Tracking System (ATCTS) registration for contractor employees who require access to government information systems. All contractor employees with access to a government info system must be registered in the ATCTS (Army Training Certification Tracking System) at commencement of services, and must successfully complete the DOD Information Assurance Awareness prior to access to the IS and then annually thereafter.

7.4 iWATCH TRAINING. The contractor and all associated subcontractor employees shall brief all employees on the local iWATCH program (training standards are provided by COR/RFOS). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR/RFOS. This training shall be completed within 30 calendar days of contract award and with 30 calendar days of new employees commencing performance with the results reported to the COR/RFOS not later than 5calendar days after contract award.

7.5 OPSEC TRAINING. Per Army Regulation 530-1, Operations Security, new contractor employees must complete Level I OPSEC training within 30 calendar days of reporting for duty and annually thereafter.

7.6 Threat Awareness Reporting Program. For all contractors with security clearances. Per AR 381-12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2-4b.

8. ATTACHMENT/TECHNICAL EXHIBIT LIST

8.1 EXHIBIT 1 - PERFORMANCE REQUIREMENTS SUMMARY

Performance Objective
Standard
Performance Threshold
Method of Surveillance
All mowing/grass cutting services completed in accordance with PWS paragraph 5.4.1
AR 420-1
95% with no more than one valid customer complaint a month
Random Sampling, Periodic Surveillance and/or Validated Customer Complaint
All grass clippings removed in a timely manner in accordance with PWS paragraph 5.4.1
AR 420-1,
95% with no more than one valid customer complaint a month
Random Sampling, Periodic Surveillance and/or Validated Customer Complaint
All trimming/edging services completed in accordance with PWS paragraph 5.4.2
AR 420-1
95% with no more than one valid customer complaint a month
Random Sampling, Periodic Surveillance and/or Validated Customer Complaint

8.2 EXHIBIT 2 – GROUNDS MAINTENANCE INSPECTION SHEET

GROUNDS MAINTENANCE INSPECTION CHECKLIST

Contract Number:_____________________________________________
Location:_____________________________________________

Instructions: Check the box that applies, make comments as needed and have both the Regional Facilities Operation Specialist (RFOS)/Contracting Officer’s Representative (COR) and Contractor Representative sign at the bottom.

Were the following in accordance with the Performance Work Statement (PWS) and in accordance with the standards outlined in the Performance Requirements Summary (PRS)?

Work Requirement
Service Completed
Satisfactory
Unsatisfactory
Comments

Mowing

Grass Clipping Removal

Trimming/Edging

Additional Comments ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

Signature of RFOS/COR Date

______________________________________________________________________________Signature of Contractor’s Representative Date

Section SF 1449 - CONTINUATION SHEET

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
16
Each

BY - Mowing - ME001

FFP

Mowing Contractor shall furnish all plant, labor, materials, equipment, supervision and transportation necessary to provide ground maintenance at AMSA #160/MG Oliver O. Howard USARC, 1072 Minot Ave, Auburn ME 04210-3746 in accordance with the performance work statement.

FOB: Destination

PURCHASE REQUEST NUMBER: 0011238233

PSC CD: S208

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
8
Each

BY - Trimming/Edging - ME001

Trimming/Edging Contractor shall furnish all plant, labor, materials, equipment, supervision and transportation necessary to provide ground maintenance at AMSA #160/MG Oliver O. Howard USARC, 1072 Minot Ave, Auburn ME 04210-3746 in accordance with the performance work statement.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job

BY - CMR - ME001

Contract Manpower The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the 99th Regional Support Command (RSC) via a secure data collection site. The contractor is required to completely fill in all required data fields using the following address: http://www.ecmra.mil/, and then click on ƒ??Department of the Army CMRAƒ?? or the icon of the DoD organization that is receiving or benefitting from the contracted services. Reporting inputs will be for the labor executed during the period of performance during each Governmental fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2017. Contractors may direct questions to the help desk by clicking on ƒ??Send an emailƒ?? which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Componentƒ??s CMR websiteƒ??.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
16
Each
OPTION
OY1 - MOWING - ME001

FFP

Mowing Contractor shall furnish all plant, labor, materials, equipment, supervision and transportation necessary to provide ground maintenance at AMSA #160/MG Oliver O. Howard USARC, 1072 Minot Ave, Auburn ME 04210-3746 in accordance with the performance work statement.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
8
Each
OPTION
OY1 - TRIMMING/EDGING - ME001

FFP

Trimming/Edging Contractor shall furnish all plant, labor, materials, equipment, supervision and transportation necessary to provide ground maintenance at AMSA #160/MG Oliver O. Howard USARC, 1072 Minot Ave, Auburn ME 04210-3746 in accordance with the performance work statement.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job
OPTION
OY1 - CMR - ME001

FFP

Contract Manpower The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the 99th Regional Support Command (RSC) via a secure data collection site. The contractor is required to completely fill in all required data fields using the following address: http://www.ecmra.mil/, and then click on ƒ??Department of the Army CMRAƒ?? or the icon of the DoD organization that is receiving or benefitting from the contracted services. Reporting inputs will be for the labor executed during the period of performance during each Governmental fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2017. Contractors may direct questions to the help desk by clicking on ƒ??Send an emailƒ?? which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Componentƒ??s CMR websiteƒ??.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
16
Each
OPTION
OY2 - MOWING - ME001

FFP

Mowing Contractor shall furnish all plant, labor, materials, equipment, supervision and transportation necessary to provide ground maintenance at AMSA #160/MG Oliver O. Howard USARC, 1072 Minot Ave, Auburn ME 04210-3746 in accordance with the performance work statement.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
8
Each
OPTION
OY2 - Trimming/Edging - ME001

FFP

Trimming/Edging Contractor shall furnish all plant, labor, materials, equipment, supervision and transportation necessary to provide ground maintenance at AMSA #160/MG Oliver O. Howard USARC, 1072 Minot Ave, Auburn ME 04210-3746 in accordance with the performance work statement.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job
OPTION
OY2 - CMR - ME001

FFP

Contract Manpower The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the 99th Regional Support Command (RSC) via a secure data collection site. The contractor is required to completely fill in all required data fields using the following address: http://www.ecmra.mil/, and then click on ƒ??Department of the Army CMRAƒ?? or the icon of the DoD organization that is receiving or benefitting from the contracted services. Reporting inputs will be for the labor executed during the period of performance during each Governmental fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2017. Contractors may direct questions to the help desk by clicking on ƒ??Send an emailƒ?? which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Componentƒ??s CMR websiteƒ??.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
16
Each
OPTION
OY3 - MOWING - ME001

FFP

Mowing Contractor shall furnish all plant, labor, materials, equipment, supervision and transportation necessary to provide ground maintenance at AMSA #160/MG Oliver O. Howard USARC, 1072 Minot Ave, Auburn ME 04210-3746 in accordance with the performance work statement.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
8
Each
OPTION
OY3 - TRIMMING/EDGING - ME001

FFP

Trimming/Edging Contractor shall furnish all plant, labor, materials, equipment, supervision and transportation necessary to provide ground maintenance at AMSA #160/MG Oliver O. Howard USARC, 1072 Minot Ave, Auburn ME 04210-3746 in accordance with the performance work statement.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job
OPTION
OY3 - CMR - ME001

FFP

Contract Manpower The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the 99th Regional Support Command (RSC) via a secure data collection site. The contractor is required to completely fill in all required data fields using the following address: http://www.ecmra.mil/, and then click on ƒ??Department of the Army CMRAƒ?? or the icon of the DoD organization that is receiving or benefitting from the contracted services. Reporting inputs will be for the labor executed during the period of performance during each Governmental fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2017. Contractors may direct questions to the help desk by clicking on ƒ??Send an emailƒ?? which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Componentƒ??s CMR websiteƒ??.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
16
Each
OPTION
OY4 - MOWING -ME001

FFP

Mowing Contractor shall furnish all plant, labor, materials, equipment, supervision and transportation necessary to provide ground maintenance at AMSA #160/MG Oliver O. Howard USARC, 1072 Minot Ave, Auburn ME 04210-3746 in accordance with the performance work statement.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
8
Each
OPTION
OY4 - TRIMMING/EDGING -ME001

FFP

Trimming/Edging Contractor shall furnish all plant, labor, materials, equipment, supervision and transportation necessary to provide ground maintenance at AMSA #160/MG Oliver O. Howard USARC, 1072 Minot Ave, Auburn ME 04210-3746 in accordance with the performance work statement.

FOB: Destination

NET AMT

ITEM NO
SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
1
Job
OPTION
OY4 - CMR -ME001

FFP

Contract Manpower The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the 99th Regional Support Command (RSC) via a secure data collection site. The contractor is required to completely fill in all required data fields using the following address: http://www.ecmra.mil/, and then click on ƒ??Department of the Army CMRAƒ?? or the icon of the DoD organization that is receiving or benefitting from the contracted services. Reporting inputs will be for the labor executed during the period of performance during each Governmental fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2017. Contractors may direct questions to the help desk by clicking on ƒ??Send an emailƒ?? which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Componentƒ??s CMR websiteƒ??.

FOB: Destination

NET AMT

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN
INSPECT AT
INSPECT BY
ACCEPT AT
ACCEPT BY
0001
Destination
Government
Destination
Government
0002
Destination
Government
Destination
Government
0003
Destination
Government
Destination
Government
1001
Destination
Government
Destination
Government
1002
Destination
Government
Destination
Government
1003
Destination
Government
Destination
Government
2001
Destination
Government
Destination
Government
2002
Destination
Government
Destination
Government
2003
Destination
Government
Destination
Government
3001
Destination
Government
Destination
Government
3002
Destination
Government
Destination
Government
3003
Destination
Government
Destination
Government
4001
Destination
Government
Destination
Government
4002
Destination
Government
Destination
Government
4003
Destination
Government
Destination
Government

DELIVERY INFORMATION

CLIN
DELIVERY DATE
QUANTITY
SHIP TO ADDRESS
DODAAC / CAGE
0001
POP 30-NOV-2018 TO

29-NOV-2019

N/A
99TH REGION

99TH READINESS

1072 MINOT AVE

AUBURN, ME 04210-3746

FOB: Destination

W91ENN

0002
POP 30-NOV-2018 TO

29-NOV-2019

N/A
(SAME AS PREVIOUS LOCATION)

W91ENN

0003
POP 30-NOV-2018 TO

29-NOV-2019

N/A
(SAME AS PREVIOUS LOCATION)

W91ENN

1001
POP 30-NOV-2019 TO

29-NOV-2020

N/A
(SAME AS PREVIOUS LOCATION)

W91ENN

1002
POP 30-NOV-2019 TO

29-NOV-2020

N/A
(SAME AS PREVIOUS LOCATION)

W91ENN

1003
POP 30-NOV-2019 TO

29-NOV-2020

N/A
(SAME AS PREVIOUS LOCATION)

W91ENN

2001
POP 30-NOV-2020 TO

29-NOV-2021

N/A
(SAME AS PREVIOUS LOCATION)

W91ENN

2002
POP 30-NOV-2020 TO

29-NOV-2021

N/A
(SAME AS PREVIOUS LOCATION)

W91ENN

2003
POP 30-NOV-2020 TO

29-NOV-2021

N/A
(SAME AS PREVIOUS LOCATION)

W91ENN

3001
POP 30-NOV-2021 TO

29-NOV-2022

N/A
(SAME AS PREVIOUS LOCATION)

W91ENN

3002
POP 30-NOV-2021 TO

29-NOV-2022

N/A
(SAME AS PREVIOUS LOCATION)

W91ENN

3003
POP 30-NOV-2021 TO

29-NOV-2022

N/A
(SAME AS PREVIOUS LOCATION)

W91ENN

4001
POP 30-NOV-2022 TO

29-NOV-2023

N/A
(SAME AS PREVIOUS LOCATION)

W91ENN

4002
POP 30-NOV-2022 TO

29-NOV-2023

N/A
(SAME AS PREVIOUS LOCATION)

W91ENN

4003
POP 30-NOV-2022 TO

29-NOV-2023

N/A
(SAME AS PREVIOUS LOCATION)

W91ENN

CLAUSES INCORPORATED BY REFERENCE

52.203-6
Restrictions On Subcontractor Sales To The Government
SEP 2006
52.203-6 Alt I
Restrictions On Subcontractor Sales To The Government (Sep 2006) -- Alternate I
OCT 1995
52.204-7
System for Award Management
OCT 2016
52.204-9
Personal Identity Verification of Contractor Personnel
JAN 2011
52.204-16
Commercial and Government Entity Code Reporting
JUL 2016
52.209-2
Prohibition on Contracting with Inverted Domestic Corporations--Representation
NOV 2015
52.209-10
Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.212-1
Instructions to Offerors--Commercial Items
AUG 2018
52.212-4
Contract Terms and Conditions--Commercial Items
JAN 2017
52.217-5
Evaluation Of Options
JUL 1990
52.219-14
Limitations On Subcontracting
JAN 2017
52.222-55
Minimum Wages Under Executive Order 13658
DEC 2015
52.223-2
Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-5
Pollution Prevention and Right-to-Know Information
MAY 2011
52.223-17
Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
AUG 2018
52.225-25
Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran-- Representation and Certifications.
AUG 2018
52.228-5
Insurance - Work On A Government Installation
JAN 1997
52.232-18
Availability Of Funds
APR 1984
52.232-39
Unenforceability of Unauthorized Obligations
JUN 2013
52.232-40
Providing Accelerated Payments to Small Business Subcontractors
DEC 2013
52.233-1
Disputes
MAY 2014
52.233-3
Protest After Award
AUG 1996
52.233-4
Applicable Law for Breach of Contract Claim
OCT 2004
52.237-1
Site Visit
APR 1984
52.237-2
Protection Of Government Buildings, Equipment, And Vegetation
APR 1984
52.246-4
Inspection Of Services--Fixed Price
AUG 1996
52.247-34
F.O.B. Destination
NOV 1991
252.203-7005
Representation Relating to Compensation of Former DoD Officials
NOV 2011
252.204-7003
Control Of Government Personnel Work Product
APR 1992
252.204-7006
Billing Instructions
OCT 2005
252.204-7015
Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.213-7000
Notice to Prospective Suppliers on Use of Supplier Performance Risk System in Past Performance Evaluations
MAR 2018
252.223-7006
Prohibition On Storage, Treatment, and Disposal of Toxic or Hazardous Materials
SEP 2014
252.225-7013
Duty-Free Entry--Basic
MAY 2016
252.225-7048
Export-Controlled Items
JUN 2013
252.232-7010
Levies on Contract Payments
DEC 2006
252.243-7001
Pricing Of Contract Modifications
DEC 1991
252.244-7000
Subcontracts for Commercial Items
JUN 2013
252.246-7000
Material Inspection And Receiving Report
MAR 2008

CLAUSES INCORPORATED BY FULL TEXT

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2016)

(a) Definitions. As used in this clause--

Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for Award Management (SAM) records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.

Registered in the System for Award Management (SAM) database means that--

(1) The Contractor has entered all mandatory information, including the unique entity identifier and the EFT indicator (if applicable), the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14), into the SAM database;

(2) The Contractor has completed the Core, Assertions, Representations and Certifications, and Points of Contact sections of the registration in the SAM database;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Contractor will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

(4) The Government has marked the record ``Active''.

System for Award Management (SAM) means the primary Government repository for prospective Federal awardee and Federal awardee information and the centralized Government system for certain contracting, grants, and other assistance-related processes. It includes—

(1) Data collected from prospective Federal awardees required for the conduct of business with the Government;

(2) Prospective contractor-submitted annual representations and certifications in accordance with FAR subpart 4.12; and

(3) Identification of those parties excluded from receiving Federal contracts, certain subcontracts, and certain types of Federal financial and non-financial assistance and benefits.

Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.

(b) The Contractor is responsible for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis, from the date of initial registration or subsequent updates, its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(c)(1)(i) If a Contractor has legally changed its business name, doing business as name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to—

(A) Change the name in the SAM database;

(B) Comply with the requirements of subpart 42.12 of the FAR; and

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.