Solicitation_W15QKN-18-Q-1144_SF1449_Released.pdf
PDF 911 KB Posted
- Solicitation number
- W15QKN-18-Q-1144
About this file
Solicitation (Request for Quote) W15QKN-18-Q-1144
View the file
Other files
| File | Type | Posted |
|---|---|---|
| wqTreatment_MD019-20071000.pdf | ||
| MD019-Owings_Mills-C11-CSS-8020-SOW_V1-Water_Sampling,_Testing,_and_PM_Mechanical_Bldg.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W15QKN18Q1144 30-Aug-2018
b. TELEPHONE NUMBER
609-562-5165
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 13 Sep 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W15QKN9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
NANCY ZENG
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
0011193496
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY CONTRACTING COMMAND
5418 S. SCOTT PLAZA
JOINT BASE MDL NJ 08640
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W21AQZ 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
99TH REGION
99TH READINESS DIVISION
12100 GREENSPRING AVE
OWINGS MILLS MD 21117-1699
TEL: FAX:
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
X
SIZE STANDARD:
$15,000,000
NAICS:
541380
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF64
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W15QKN18Q1144
Section SF 30 - BLOCK 14 CONTINUATION PAGE
INSTRUCTIONS TO OFFERORS
INSTRUCTIONS/BASIS OF AWARD
1. The purpose of this Request for Quote (RFQ) is to procure Water
Sampling/Treating/Operation Maintenance Services in support of the 99th Regional
Support Command (RSC). Solicitation No. W15QKN-18-Q-1144 is a total HUBZone
Small Business set-aside solicitation. Services are to be performed at the:
SSG Isadore S. Jachman U.S. Army Reserve Center (USARC), 12100 Green Spring Ave
Owings Mills, MD 21117
2. The Period of Performance for this requirement shall be a twelve month base period and four (4), twelve-month option periods from effective date of award. Estimated to start on or near 30 September 2018.
3. All work shall be performed in accordance with the attached Performance Work
Statement.
4. Sites Visit is encouraged for this requirement, the site visits schedules and point of contact listed as following. Interested contractors please call and or email the POC in advance to make sure they will be there to grant you the access.
Water Sampling/Treating/Operation Maintenance Services September 10, 2018, Monday
(Primary) from 0900 to 14:00 and September 11, 2018, Tuesday( Alternate) from 0900 to
1400.
Name: Jason Gavin/Area Facility Operations Specialist
Address: 12100 Green Spring Ave Owings Mills, MD 21117
Telephone (Cell): 302-670-1589
Email: jason.d.gavin.ctr@mail.mil
5. All questions shall be in writing. Questions may be e-mailed to Contract Specialist, Nancy Zeng at Nancy.m.zeng.civ@mail.mil or the Contracting Officer, Orlando
Whitaker at orlando.t.whitaker.civ@mail.mil no later than 11:00A.M. EST, Wednesday, 12 September 2018. Questions must specify the section or paragraph of the requirement
Performance Work Statement or Request for Quote (RFQ) for which the clarification is desired. The Contracting Office will coordinate with the requiring activity to provide answer to the individual question.
6. All quotes shall be in writing and are due no later than the date stated in block 8 of the solicitation. It is the quoter’s responsibility that all quotes submitted, regardless of mailto:Nancy.m.zeng.civ@mail.mil mailto:orlando.t.whitaker.civ@mail.mil method of transmission, are received in this office prior to the time and date for receipt of quotes. Quotes should be e-mailed to Contract Specialist, Nancy Zeng at nancy.m.zeng.civ@mail.mil and the Contracting Officer at orlando.t.whitaker.civ@mail.mil.
7. Anywhere in this solicitation where the term “offer” is used, it is hereby changed to read
“quote”. Anywhere in this solicitation where the term “offeror” is used, it is hereby changed to read “quoter”.
8. Quotes MUST include the following information, Quoter Does Not Provide Following
Information WILL NOT RECEIVE Further Consideration:
a. Price: Pricing for each Line Item. .
b. Valid Certificate of Insurance in accordance with FAR 52.228-4000 “ Required
Insurance. “
9. Quoters should complete the following information before the quote submission:
a. Complete blocks 12, 17 and 30 of the 1449 as well as any amendments. In doing so, the quoter accedes to the contract term and conditions as written in the
Request for Quote (RFQ).
b. Information requested in paragraphs 11 through 16 below.
10. The contractor should provide a Point of Contact (POC) POC:
Telephone No.______________________
Email Address:_____________________
11. Contractors shall quote on all CLINS. CLIN pricing should be all inclusive of labor, labor burden, other direct cost (material, equipment, fees, licenses, etc), G&A and profit.
12. All representations and certifications to include provision of Dun & Bradstreet number are to be returned with the quote. Dun and Bradstreet information can be found by calling
(800)-333-0505. A contractor that is receiving an award resulting from this request for quotation must be registered in the System for Award Management (SAM). To register, quoters may log onto: https://www.sam.gov/portal/public/SAM/.
13. Dun and Bradstreet #__________________________
14. CAGE(commercial and government entity)code___________________ mailto:nancy.m.zeng.civ@mail.mil mailto:orlando.t.whitaker.civ@mail.mil https://www.sam.gov/portal/public/SAM/
15. Federal Tax ID __________________
EVALUATION CRITERIA
1. An award for this requirement will be made pursuant to FAR 13. The basis for award of any contract resulting from this solicitation will be the Lowest Price Technically
Acceptable Source Selection methodology. The Government intends to award a single
Firm Fixed Price (FFP) contract.
2. The Government may award a contract on the basis of initial quotes received, without discussions. Therefore, each initial quote should contain the quoter’s best terms. The
Government reserves the right to conduct discussions if later determined necessary by the
Contracting Officer. In the event revised quotes are requested, the quoter shall submit a complete replacement quote. Failure to submit any information requested by the solicitation may be cause for unfavorable consideration.
3. Award shall be made to a single contractor. Award will be made to the lowest priced technically acceptable, responsible offeror that meets the requirements of the
Performance Work Statement and this solicitation.
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job BY:Chlorine system water maintenance
FFP
Base Year Chlorine system water sampling/treatment/maintenance services at SSG
Isadore S. Jachman Memorial U.S. Army Reserve Center( facility code MD019), 12100 Green Spring Ave., Owings Mills, MD 21117. All tasks in accordance with the attached Performance Work Statement.
FOB: Destination
PURCHASE REQUEST NUMBER: 0011193496
PSC CD: S114
NET AMT
0002 1 Job OY1:Chlorine system water maintenance
FFP
Option Year 1 Chlorine system water sampling/treatment/maintenance services at
SSG Isadore S. Jachman Memorial U.S. Army Reserve Center( facility code
MD019), 12100 Green Spring Ave., Owings Mills, MD 21117. All tasks in accordance with the attached Performance Work Statement.
FOB: Destination
0003 1 Job OY2:Chlorine system water maintenance
FFP
Option Year 2 Chlorine system water sampling/treatment/maintenance services at
SSG Isadore S. Jachman Memorial U.S. Army Reserve Center( facility code
MD019), 12100 Green Spring Ave., Owings Mills, MD 21117. All tasks in accordance with the attached Performance Work Statement.
FOB: Destination
0004 1 Job OY3:Chlorine system water maintenance
FFP
Option Year 3 Chlorine system water sampling/treatment/maintenance services at
SSG Isadore S. Jachman Memorial U.S. Army Reserve Center( facility code
MD019), 12100 Green Spring Ave., Owings Mills, MD 21117. All tasks in accordance with the attached Performance Work Statement.
FOB: Destination
0005 1 Job OY4:Chlorine system water maintenance
FFP
Option Year 4 Chlorine system water sampling/treatment/maintenance services at
SSG Isadore S. Jachman Memorial U.S. Army Reserve Center( facility code
MD019), 12100 Green Spring Ave., Owings Mills, MD 21117. All tasks in accordance with the attached Performance Work Statement.
FOB: Destination
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
0005 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 30-SEP-2018 TO
29-SEP-2019
N/A 99TH REGION
99TH READINESS DIVISION
12100 GREENSPRING AVE
OWINGS MILLS MD 21117-1699
FOB: Destination
W21AQZ
0002 POP 30-SEP-2019 TO
29-SEP-2020
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 30-SEP-2020 TO
29-SEP-2021
N/A (SAME AS PREVIOUS LOCATION)
0004 POP 30-SEP-2021 TO
29-SEP-2022
N/A (SAME AS PREVIOUS LOCATION)
0005 POP 30-SEP-2022 TO
29-SEP-2023
N/A (SAME AS PREVIOUS LOCATION)
PERFORMANCE WORK STATEMENT
SCOPE OF WORK
99th Regional Support Command Directorate of Public Works
Fort Dix, New Jersey 08640
27 October 2016
Project Name: Water Treatment Operation & Maintenance
Project Number: C11 Project Location: SSG Isadore S. Jachman Memorial USARC
12100 Green Spring Ave
Owins Mills, MD 21117
Project POC: PRI: RFOS/QAR: Ken Augustin Work 301-833-6538 Cell (609)744-1123
Project POC/ALT: AFOS: Jason Gavin Work (412) 477-7816 Cell 302-670-1589
Project POC/ALT: FAC MGR: SSG Willoughby Work 410-435-5631 Cell N/A
Project POC/RSC: Work Cell
1. GENERAL CONTRACTOR:
1.1. Shall Furnish all plant, labor, equipment, materials, transportation, supervision and technical expertise to perform all the work necessary to complete repairs, negotiated time frames and specifications as described in this Scope Of Work (SOW).
1.1.1. Shall provide their own storage shed or trailer for on-site office accommodations and for storing of equipment and material. The onsite Government Quality Assurance Representative
(QAR) will assign the contractor a location for placement of his shed or trailer upon request.
1.2. Is obligated to verify all measurements and specification requirements at the on-site visit prior to starting the project. No extra compensation shall be allowed for the contractor who does not attend the on-site visit and who does not appreciate the difficulty of the contract specifications. Any discrepancies, ambiguities or changes must be verified and confirmed in writing to the Contracting Officer, Contracting Officer Representative (COR), and QAR.
1.3. Shall furnish all submittals for equipment and/or materials that vary from requirements of this SOW. All submittals are required to be turned in and approved by the QAR 30 days prior to ordering any of those materials.
1.3.1. Shall provide, unless otherwise specified, new and unused materials and/or installed equipment in the original manufacturer’s packaging. All materials stored on the job site are subject to inspection by the QAR and must be protected from the elements at all times.
1.4. Shall not perform any portion of this contract without notice to proceed. Shall not commence work prior to the Government COR/QAR pre-construction meeting. Shall notify the
COR/QAR a minimum of 72 hours prior to commencing work and prior to completing work on this contract.
1.5. Shall submit, prior to commencing any work, a schedule of operations to the QAR. The construction schedule shall be subject to change so Contractor’s operations do not conflict or otherwise disrupt normal operations of the government in the facility involved.
1.6. Shall perform the work between the hours of 0730 and 1600 (7:30 AM – 4:00 PM), Monday through Friday (unless otherwise specified), excluding legal holidays. NO EXCEPTIONS, any work on military training/drill weekends or federal holidays must have prior written coordination and approval between the Contractor, Project POC (Primary or Alternate), and the Facility
Manager.
1.6.1. Shall submit on company letterhead to the QAR an “Entry Authorization Letter” registering all motor vehicles and driver/operators information as required to access individual installations.
1.6.2. Shall ensure all motor vehicles, drivers and operators are qualified, licensed and insured.
1.7. Shall ensure compliance with all applicable Federal, State, and Local Municipal environmental regulations concerning the protection of land, water and resources. Shall apply most stringent regulation requirements to any ambiguities, deviations must be approved in writing by the Contracting Officer or COR. The types and quantities of all hazardous materials brought to the job site shall be reported to the facility/installation environmental officer.
1.8. Shall call/coordinate, prior to any excavation, with local municipalities and the facility utilities section to identify all underground utilities.
1.8.1. Prior to any underground excavation, the contractor shall call and obtain approval from the state in which the work is being performed.
1.8.2. A copy of the approval notification letter or valid authorization number must be available for inspection at the excavation site.
1.9. Shall be responsible for any damages caused by them or their subcontractors during the performance of this contract, and shall be required to reimburse the United States Government for the cost of any repairs resulting from those damages, or the Contractor/ Subcontractor shall make the necessary repairs to the satisfaction of the United States Government.
1.9.1. The contractor shall hold the Government harmless against any liability imposed by a
Federal, State, or Local regulatory agency, resulting from the negligent acts or willful misconduct of the contractor to include assessment of a civil or administrative penalty or fine.
1.10. Shall be solely responsible for ensuring compliance with the provisions of this contract by subcontractors. Shall ensure work be performed by workmen skilled in their particular trades, and certified as required by Federal, State and Local laws and/or codes
1.11. Shall be required to leave the job site in a safe and secure condition at the end of each workday. The contractor shall provide at his/her expense a Dumpster for all construction debris, dumping shall also be at contractor expense. The Contractor shall at no time use government dumpsters.
1.12. Shall clean the job site of all construction debris at the end of each working day. The daily cleanup will not alleviate the Contractor from the responsibility of the final cleanup for acceptance, upon completion of this contract. All debris removed from the job site shall be disposed of properly at an off post/facility landfill of the Contractor’s own choice and at the
Contractor’s expense. Upon request by the by the Contracting Officer or QAR, the Contractor shall provide the name, address, and location of the disposal site, and copies of any manifest from such disposals.
1.13. Shall ensure all work be completed in the negotiated time frame.
2. CONTRACTOR QUALITY CONTROL
2.1. The Contractor shall provide and maintain an effective quality control program that complies with the Contract Clause entitled “Inspection of Construction” (FAR 52.246-12), the below stated quality control requirements and the quality control requirements stated in the respective section of the Technical Specifications. Quality control personnel shall also be charged with the responsibility of policing Contractor’s Safety Program.
2.2. The Contractor shall establish a quality control system to perform sufficient inspection and testing of all items of work, including that of their subcontractors. The quality control system shall ensure conformance with applicable specifications and drawings with respect to materials, workmanship, construction, finish, functional performance, and identification.
2.3. The quality control system will be established for all construction except where the technical provisions of the contract provide for specific Government control by inspections, tests, or other means. The Contractor’s quality control system will specifically include the surveillance and tests required in the technical provisions of the contract specifications. For purposes of the above description, shop manufacture or standard products are not defined as construction.
2.3.1. The Contractor’s quality control system is the means by which they assures themselves their construction complies with the requirements of the contract plans and specifications. The controls shall be adequate to cover all construction operations, including both on and off-site fabrication.
2.3.2. The Contractor shall not build up or conceal any feature of the work containing uncorrected defects, and payment on deficient items will be withheld until they are satisfactorily corrected or other action has been taken as authorized pursuant to the Contract Clause entitled
“Inspection of Construction”.
2.3.3. The Contractor’s appointed job site supervisor may be used as the Quality Construction
Representative (QCR). When supplemented by special technicians or testing facilities to perform all specified tests, balancing, adjusting and/or regulating mechanical and electrical devices, equipment and/or systems it will be done in writing. As an option, an industry recognized testing laboratory approved by the Contracting Officer or COR may be used for said testing.
2.3.4. The contractor is responsible for maintaining an effective quality control system.
Recurring deficiencies indicate the system is not adequate and the contractor’s performance is failing to meet government’s minimum acceptable standards. If, in the opinion of the
Contracting Officer, an unacceptable number of deficiencies are occurring in the contractor’s performance, the Contracting Officer may direct the contractor to revise its operations to correct the defective performance. Failure by the contractor to provide acceptable revisions and/or to improve contract performance may result in the termination of the contract for default.
2.3.5. In the event the Contractor utilizes the service of a commercial testing laboratory, the
Contracting Officer reserves the right to check laboratory equipment for compliance with the standards set forth in the contract specifications and to check the laboratory technician’s testing procedures and techniques.
3. GOVERNMENT
3.1. The Government will provide, when available, electrical power, water and existing utilities at each building required in the performance of this contract at no cost to the Contractor.
Temporary extension of power and/or water lines, if necessary, shall be installed at the
Contractor’s expense.
3.1.1. Contractor owned construction sheds, trailers, offices or other such facilities requiring utility services shall be metered for each utility involved, and all costs involved up to the point of connection to Government owned utility systems shall be at the contractor’s expense. Final connection of Contractor supplied service laterals to existing Government owned utility systems will be made at the Contractor’s expense.
3.2. Contracting Officer or COR will schedule a pre-performance conference after contract award and prior to commencement of work. The Contracting Officer will notify the contractor of the time, date, and place set for the meeting, which will be held at a location to be designated by the Contracting Officer. At this meeting, the contractor will be oriented with respect to
Government procedures and lines of authority, as well as contractual, administrative, and construction matters. The contractor is required to furnish a current Certificate of
Insurance and a letter appointing a construction superintendent at the meeting.
3.2.1. Pre-Construction Conference: Topics will cover but are not limited to the following:
3.2.1.1. Introduction of Key players: COR/QAR, General Contractor, Job-site Supervisor, Sub-
Contractors and using agencies. Other personal that may be in attendance are Environmental, Police, Fire, Safety and Health services, in addition to Distinguished Visitors.
3.2.1.2. Scope of Work (SOW): Brief description of work, modifications to SOW, customer requests for additional work, unauthorized work, facility access and authorized personnel access.
3.2.1.3. Milestones: Period of performance, start date, schedule, phasing, completion date, work hours desired, weekend work schedule, scheduled outages/interruptions (power, water, roads, alarms, fire protection, HVAC).
3.2.1.4. Materials: Submittals, equipment, construction area, storage area, Government provided utilities, dumpster locations, Barriers (construction fence, silt fence, road blocks, access points to facilities, etc.)
3.2.1.5. Administrative: Lines of authority, Wage rate/certified payrolls, Daily reports, Visitor control, Environmental requirements (hazards, dust and noise control), Safety meeting/concerns, Excavation permits, Fire (burn Permits), Police support, Payments, Liquidated Damages
3.2.2. Contracting Officer, COR and/or their QAR may inspect the work at any time during the contract period, and reserves the right to stop or terminate the contract if all work does not comply with the specifications provided by the manufactures recommendation of this SOW. The presence or absence of the Contracting Officer or QAR shall not relieve the Contractor from strict compliance with these plans and specifications.
3.3. Technical surveillance of workmanship and inspection of materials for work being performed under this contract shall be the responsibility of the QAR. This provision in no way authorizes anyone other than the Contracting Officer to commit the Government to changes in the terms of the contract. In the event it is determined necessary to designate a QAR for this contract, such designation shall be by a separate letter to the individual selected with a copy furnished to the contractor.
3.4. The Government, its Officers and Agents will be free from liability for any negligence occasioned by the Contractor’s operations, employees or equipment. In addition, the Contractor will reimburse the Government for any damage and/or loss that occurs as a result of the
Contractor’s negligent operations, employees or equipment
3.5. The Government reserves the right to undertake performance by Government forces or other
Contractors, the same type of similar work as contracted for herein, as the Government deems necessary or desirable, and to do so will not breach or otherwise violate this contract.
3.6. Federal Holidays (New Year’s Day, Martin Luther King JR’s Birthday, Presidents’ Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans’ Day, Thanksgiving
Day, and Christmas Day), that fall within the workweek will not be considered workdays.
Whenever a holiday falls on a Saturday or Sunday, the proceeding Friday or following Monday respectively will be observed as a holiday. Prior to the contractor performing the work on days or at times other than those specified, the contractor shall submit a written request to the QAR for approval by the Contracting Officer. Requests for deviation shall be submitted no less than
24 hours prior to the time the contractor desires to work.
4. LIFE, SAFETY AND HEALTH REQUIREMENTS: To better provide life, safety and health protection to all contractor employees, on-site personnel, and Government personnel performing or in any way coming in contact with this contract the specific requirements established here-in will be adhered to at all times:
4.1. 29 CFR 1910: Comply with all pertinent provisions of 29 CFR 1910 General, and with any additional measures the Contracting Officer may determine to be reasonably necessary. Copies of this manual may be obtained from the Superintendent of Documents, U.S. Government
Printing Office, Washington, D.C., 20402.
4.2. OSHA: Comply with latest version of OSHA Handbook Rules and Regulations.
4.3. NFPA: Comply with the most current edition of the National Fire Codes (NFPA) and installation fire prevention standards. www.nfpa.org/catalog
4.3.1. All open flame/hot work or disconnection of fire protection alarms or suppression systems require prior written approval/coordination from one of the 99th Regional Support Command
(RSC) POC’s listed on the first page of this document.
4.3.2. Any connection, disconnection or installation of fire protection alarms or suppression systems shall require an acceptance test performed by the contractor and witnessed by the local
Fire Prevention Authority having jurisdiction over that facility. In the event the fire alarm system cannot be disconnected (i.e., child development, hospital, etc.) a temporary system will be provided and certified by the local Fire Prevention Authority having jurisdiction. Work required to be performed after hours due to the nature of the facility will be at no additional cost to the government.
4.3.3. All fire alarm system components, including all smoke and heat detectors, shall be protected from dirt, dust and damage during demolition and construction.
4.4. AR 420-90: Comply with Army Regulation 420-90, http://www.usapa.army.mil.
http://www.nfpa.org/catalog http://www.usapa.army.mil/
4.5. Lockout /Tagout Procedure: The Contractor shall perform this work in accordance with 29
CFR 1910.147, The Control of Hazardous Energy and the following general requirements.
4.5.1. Preparation: Make a survey to locate and identify all isolating devices to be certain which switches, valves, or other energy isolating devices apply to the equipment to be locked or tagged out. More than one energy source such as electrical, mechanical or others may be involved.
4.5.2. Sequence of Lockout/Tagout Procedure:
4.5.2.1. Notify all affected personnel that a lockout/tagout system is going to be used and the reason therefore. The authorized personnel shall know the type and magnitude of energy the machine or equipment uses and shall understand hazards thereof.
4.5.2.2. If the machine or equipment is operating, shut it down by the normal stopping procedure such as depressing stop button, open toggle switch, etc.
4.5.2.3. Operate the switch, valve, or other energy isolating devices so that the equipment is isolated from its energy source. Stored energy such as in charged capacitors, springs, elevated machine members, rotating flywheels, hydraulic systems and other pressurized air, gas, steam, or water systems etc. must be dissipated or restrained by methods such as repositioning, blocking, or bleeding down the stored energy.
4.5.2.4. Lockout and/or tagout the energy isolating devices with assigned individual locks, tags, or additional safety measures as may be required.
4.5.2.5. After ensuring that no personnel are exposed, and as a check on having disconnected the energy sources, operate the push button or other normal operating controls to make certain the equipment will not operate.
CAUTION: Make sure the operating controls are returned to the "NEUTRAL" or "OFF" position after the test.
4.5.2.6. The equipment is now locked out or tagged out.
4.5.3. Restoring Machines or Equipment to Normal Production Operations:
4.5.3.1. After the servicing and/or maintenance is complete and equipment is ready for normal production operations, check the area around the machines or equipment to ensure that no one is exposed.
4.5.3.2. After all tools have been removed from the machine or equipment, guards have been reinstalled, and personnel are in the clear, remove all lockout and tagout devices. Operate the energy isolating devices to restore energy to the machine or equipment.
4.5.4. Procedure Involving More Than One Person: In the preceding steps, if more than one individual is required to lockout or tagout equipment, each shall place his/her own personal lockout or tagout device on the energy isolating devices. When an energy isolating device cannot accept multiple locks or tags, a multiple lockout or tagout hasp shall be used. If a single lock is used to lockout the machine or equipment, the single key shall be placed in a lockout box or cabinet which allows the use of multiple locks to secure it. Each employee shall then use his/her own lock to secure the box or cabinet. As each person no longer needs to maintain his/her lockout protection, only that person shall remove his/her lock from the box or cabinet.
4.6. USACE EM 385-1-1: The Contractor shall be responsible for knowing the Corps of
Engineers, Safety and Health Requirements Manual, EM 385-1-1, (use the current version at the time of task order award), and incorporate those general and additional safety requirements into daily working procedures to provide safe working conditions during performance of this contract. Copies of this manual may also be obtained from the Superintendent of Documents.
http://www.usace.army.mil/inet/usace-docs/eng-manuals/em385-1-1/toc.htm
4.7. SITE SAFETY PLAN: The Contractor shall submit in writing a Site Safety Plan and present the overall safety program via in-person conference with the Contracting Officer and/or
Primary Project POC. The Site Safety Plan shall follow the requirements of the EM 385-1-1 and include all relevant Accident Prevention and Activity Hazard Analyses. The Site Safety Plan shall include provisions to deal with hazardous materials, pursuant to the Contract Clause entitled "Hazardous Material Identification and Safety Data".
4.7.1. With respect to hazardous materials, the plan will consist of:
4.7.1.1. A plan for protecting personnel and property during the transport, storage, and use of the materials.
4.7.1.2. An index of hazardous materials to be introduced to the site.
4.7.1.3. Safety Data Sheets (SDS) for materials listed in the index of the plan and not required in the technical section of the specification.
4.7.1.4. Procedures for spill response and disposal.
4.7.2. The Contractor shall not turn in hazardous waste generated during performance of the contract, for disposal by the government, unless such disposal is explicitly provided for in the contract. If specified in the contract, the Contractor shall provide an MSDS for each hazardous material/waste turned in to the government for disposal.
4.7.3. The contractor shall not dispose hazardous materials/waste in any dumpster, sanitary sewer, storm sewer or dispose of hazardous materials/waste by any other means on government property.
4.7.4. The contractor shall not sign any hazardous waste manifest. Signature authority for hazardous waste manifests is delegated only to certain personnel within the Environmental
Office. The contractor shall provide copies of all manifests or bills of lading for the transportation and disposal of all asbestos or asbestos containing materials to the Environmental
Office.
http://www.usace.army.mil/inet/usace-docs/eng-manuals/em385-1-1/toc.htm
4.8. HAZARDOUS MATERIAL CONTACT (PCB, Asbestos or Lead Material): If material is encountered which may contain PCB's, hazardous materials, asbestos and/or lead and must be disturbed, DO NOT touch the material. Should the discovery of such suspected material affect the Contractor's planned work schedule, the Contractor shall redirect the work crew to other portions of the unaffected work and modify the schedule at no additional cost to the Government.
4.8.1. Contact/notify an On Site Representative/POC from page one immediately if circumstances appear unusual, unhealthy, or otherwise hazardous.
4.8.2. In writing, address circumstances and concerns to be addressed by the Contract Officer, Project POC, Environmental and/or Government Representative regarding the discovery of the suspected material and of any adverse impact the Contractor may expect to incur due to this situation.
4.8.3. On Site Representative, within 14 calendar days, will perform laboratory tests to determine if the material is a hazard. If there is not a danger, the site Representative will direct the
Contractor to proceed in the identified area without change. If the material is identified as hazardous, before proceeding, the On Site Representative will determine the most cost-effective means for removal. The hazardous material will be removed, abated or rendered harmless before work commences.
4.9. ENVIRONMENTAL PROTECTION REQUIREMENTS: Provide and maintain strict compliance with all federal, state, county and local environmental protection requirements including but not limited to, water, air, soil, and noise pollution during the life of this contract.
4.9.1. In the event of a spill, initiate containment operations utilizing personnel properly trained and protected for such situations and immediately notify the Contracting Officer and/or On Site
Representative/POC from page one.
4.9.2. Plan for and provide environmental protective measures to control pollution that develops during normal construction practice.
4.9.2.1. Prevent oily or other hazardous substances from entering the ground, drainage areas, storm drainage system, or local bodies of water.
4.9.2.2. Keep dust down at all times, including during nonworking periods. Sprinkle or treat with dust suppressants, the soil at the site, and other areas disturbed by operations. Dry power brooming will not be permitted. Instead use vacuuming, wet mopping, wet sweeping, or wet power brooming. Only wet cutting will be permitted for cutting concrete, and bituminous concrete.
4.9.2.3. Handle generated hazardous waste in accordance with federal, State, county and local regulations including 40 CFR 262.
4.9.3. Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project. Dispose of hazardous waste in strict accordance with federal, State, county and local regulations including 40 CFR 263 and 40 CFR 264.
4.9.4. Make the maximum use of low-noise emission products, as certified by the EPA. Blasting or the use of explosives is prohibited.
4.10. OZONE DEPLETING SUBSTANCES (ODS): The Contractor shall not knowingly vent or otherwise dispose of any ODS in a manner which would permit their release into the environment. ODS's are generally found in refrigerants, firefighting agents, and solvents.
4.10.1. The Contractor shall use only those products that are approved and listed by the EPA
Significant New Alternatives Program (SNAP).
4.10.2. The Contractor shall furnish a material safety data sheet to the Government representative prior to use of any ODS or SNAP product on station.
4.10.3. Class I ODS's: The use on installations or the removal off an installation is strictly prohibited without the prior knowledge and consent of the Contracting Officer.
4.10.4. Class II ODS’s: Shall be used only when specified by the Government.
4.10.5. When ODS's of any class are used or saved for reuse, the Contractor shall list this amount in pounds on the "Daily Report To Inspector" form and the Contractor's invoice.
4.10.6. ODS's shall be captured and recycled in conformance with all applicable Federal, State, and local regulations.
4.11. SAFETY OFFICER: The Installation Safety Officer will be responsible for monitoring the contractor in the area of safety and accident prevention. Additional information may be provided and Contractor shall comply with the safety rules of the Government installation concerning related activities not directly addressed in this contract.
4.11.1. The Contractor’s personnel, when operating motor vehicles, shall not exceed ten (10) miles per hour when passing military troops on the roadways, and abide by post speed limits otherwise.
4.12. OCCUPANCY:
4.12.1. It shall be the Contractor’s responsibility to coordinate with the QAR to schedule and perform his work in such a manner as to create the least possible interference with the conduct of normal activities within the areas.
4.12.2. The Contractor shall not receive any additional compensation due to the conditions brought about by this occupancy and usage of the Government.
4.12.3. Contractors are only authorized to occupy areas in which active construction, maintenance, repair or associated work in the performance of the contract is required to be done.
4.12.4. The Contractor shall not block more than one access of the building at any time, nor shall he disrupt the existing parking arrangement at any of the building parking areas without prior coordination with the QAR.
5. CONDUCT OF EMPLOYEES
5.1 The contractor is fully responsible for the performance and conduct of his employees at all times while on post performing under the contract. The Contractor shall not allow any employee to perform work under the contract while under the influence of alcohol, drugs or any other incapacitating agent.
5.1.1. Contractor employees will abide by the DOD Smoking Policy.
5.2. Military police and other law enforcement personnel on post have the right to deny entry to post or remove from post any contractor employee for misconduct which endangers the health or safety of people or property or for reasons of security. In addition, the Post Commander may bar an individual from entering the post under the authority of 18 U.S.C. 1382.
5.3. Removal from post of a contractor employee in accordance with above shall not relieve the
Contractor from the requirement to meet all of the terms and conditions of the contract.
6. SECURITY
6.1. At all times during the performance of work within the facilities, the Contractor and their employees shall remain cognizant of security restrictions existing within the facility. The
Contractor’s employees shall ensure any doors, windows or access panels which may have been opened for them during the course of the work period are secured at the end of the day.
6.2. The Contractor shall report any incident in which no escort is provided for scheduled work within secured areas of the building or any occurrence during which an escort leaves the
Contractor’s employees while within a secure area.
6.3. The Contractor and their employees may store tools and equipment within the work area.
However, recognize they do so at their own risk even if the area can be secured.
7. INSPECTOR GENERAL’S (IG) AUTHORITY TO INSPECT CONTRACTORS
7.1. The Inspector General shall have access to the Contractor’s facilities, employees, operations, and records at the site where work is being performed at all times to conduct inspections or for other purposes. Where feasible, advance notification of an IG inspection or investigation will be provided to the Contractor by the Contracting Officer.
8. DEFINITIONS
8.1. Where the words “Special Contract Clauses” or “Special Clauses” appear in test provisions, the Technical Specifications, or on contract drawings, it shall be taken to mean “Special Contract
Requirements”.
8.2. Throughout this contract, the word “indicated”, “shown”, or “specified” shall mean indicated, shown, or specified in the drawings and/or specified in the specifications.
8.3. Throughout this contract, the words “as directed” “inspected”, “selected”, or “accepted” shall mean as directed, inspected, selected or accepted by the QAR. The words, “approved” or
“authorized” shall mean approved or authorized by the Contracting Officer. These definitions are provided as guidance for the contractor, and shall service as the governing interpretation when this language appears within the body of this contract and apparently conflicts with the above.
9. APPLICABLE PUBLICATIONS: Those applicable publications that are not listed in the
Applicable Publication paragraph of the Technical Specifications sections, but are found elsewhere in the text of those specifications, also form a part of this contract.
10. SUBMITTALS / DELIVERABLES
10.1. SUBMITTALS: Contractor shall provide submittals to the COR for submittal approval minimum 30 days prior to scheduled installation of any referenced materials substituted in the technical sections herein, unless otherwise noted.
10.1.1. Original and four (4) copies of each submittal shall be provided and signed by the contractor. Once approved, original and four copies will be stamped “Approved”, signed and dated by the COR.
10.1.2. Distribution of submittals: Approved submittals will be included in the deliverables portion as stated in paragraph 10.2 below.
10.2. DELIVERABLES: Send a minimum of 30 days prior to contract completion date original and four (4) copies of ALL final documentation; submittals, certifications, laboratory tests, descriptive data, test reports, required shop drawing, site surveys, and warranties. Send via First
Class Mail, FedEx, or UPS to:
99th Regional Support Command HQ
Attn: DWP Operations: Contract# __________________
Fort Dix, NJ 08640
10.3. The Contractor shall furnish to the above address the original manufacturer’s documentation and four (4) copies demonstrating material proof of compliance requirements in regards to Technical Specifications for this contract.
10.3.1. Certificate of Compliance:
10.3.1.1. Name and address of the Contractor
10.3.1.2. Project name
10.3.1.3. Location
10.3.1.4. Quantity
10.3.1.5. Dates of shipment or delivery to which the certificates apply
10.3.1.6. Each certificate shall be signed by an authorized officer of the manufacturing company
10.3.2. Laboratory Tests: Reports submitted with the certificate shall contain:
10.3.2.1. Name and address of the testing laboratory
10.3.2.2. Date of the tests to which the report applies.
10.3.3. Samples: The Contractor shall furnish samples of materials for approval, as required by the applicable sections of the technical specifications.
10.3.4. Descriptive Data: The Contractor shall furnish the manufacturer’s descriptive data, installation instructions, and maintenance instructions, for approval, as required by the applicable sections of the technical specifications.
10.3.5. Test Reports: The Contractor shall furnish copies of test reports for approval to demonstrate compliance with the applicable sections of the technical specifications.
10.4. Documentation shall not be construed as relieving the Contractor from furnishing satisfactory material, if after tests are performed on selected samples of the material is found not to meet the specific requirements.
11.1. TECHNICAL SPECIFICATIONS:
CSS#8020 Water Treatment Operation Maintenance. SSG Isadore S. Jachman ARC.
12100 Green Spring Ave Owings Mills, MD 21117
11.2. GENERAL REQUIRMENTS:
11.2.1. The contractor shall provide all plant, labor, equipment , tools, materials , supervision and transportation to accomplish the following work which consists of but is not limited to water sampling and testing.
11.3. DETAILS:
11.3.1. SAMPLING
a. Contractor shall perform the following sampling and prepare for analysis the following water testing parameters at the SSG Isadore S. Jachman ARC:
i. Total Coliform
ii. Chlorine Residual
iii. Nitrate
iv. Nitrite
b. Contractor shall collect the samples using only EPA Approved sampling techniques.
i. All samples shall be collected from the systems distribution system.
a) It is the contractor’s responsibility to verify that the water sampling locations specified in this Scope of Work are correct.
c. The contractor shall only use a Maryland Certified Laboratory for analysis of the samples.
ii. The Laboratory shall be certified in the analysis of Drinking Water parameters of the following: Microbiology (Group 2- Membrane Filtration) and
Inorganics (Group 1 AND Group 2)
iii. Contractor shall provide a copy of the Maryland Certification from the testing
Laboratory, to the COR, prior to sampling.
d. Contractor shall acquire fresh sampling bottles/containers & preservatives from the designated Laboratory prior to each sampling event.
i. If a lab error occurs because the contractor utilized improper sampling method, improper sample bottles or expired preservatives then a resample will occur at the contractor expense.
e. Contractor shall provide their own coolers and ice for proper chilling and transport of samples.
i. It is the contractor’s responsibility to ensure that all samples are transported to the Laboratory and samples analyzed within the samples designated holding time.
ii. Any samples rejected by the Laboratory, for any reason, will be resampled immediately by the contractor, at the contractor’s expense.
f. Contractor shall provide copies of all the results to the COR within five (5) working days of receipt of the results.
g. Contractor shall notify the COR immediately if a sample should fail a Safe Drinking
Water Act Maximum Contaminant Level for any parameter.
11.3.2. SAMPLING PARAMETERS
a. Total Coliform and Chlorine (TC/CL2)
i. Total Coliform Samples will ONLY be analyzed by the Membrane Filtration
(MF) method, 9222, as defined by the most accredited version of Standard
Methods for the Examination of Water and Wastewater.
a) Alternative methods are NOT permitted.
ii. Samples will be collected quarterly based on Calendar Year 2017.
iii. Samples must be collected from the DISTRIBUTION System.
ii. Sample will only be collected from sampling locations that can be properly sterilized prior to sampling.
iii. The water shall be flushed for several minutes prior to sampling.
a) Samples are NOT PERMITTED to be taken from a hose or other distribution source that is prone to contamination.
iv. Samples MUST be collected within the specified calendar quarters;
iv. CY/Q1; 1 January to 31 March
v. CY/Q2; 1 April to June 30
vi. CY/Q3; 1 July to September 30
vii. CY/Q4; 1 October to 31 December
v. Samples shall be identified to the lab as follows on the Chain Of Custody :
MD019-TC/CL2-YYYYMMDD
vi. Samples shall be sampled within the designated quarter to allow for resample
(i.e. earlier in the quarter), should a holding time be exceeded or laboratory error occurs.
b. Nitrate and Nitrite (NO2/NO3)
i. Samples MUST be collected during the 3rd Calendar Quarter
ii. Samples MUST be collected from the systems ENTRY POINT 101.
iii. Samples shall be identified to the lab as follows on the Chain Of Custody :
MD019-NO2/NO3-YYYYMMDD
iv. Samples shall be sampled within the designated quarter to allow for resample
(i.e. earlier in the quarter), should a holding time be exceeded or laboratory error occurs.
11.3.3. TEST & DOCUMENT WATER QUALTIY PARAMETERS
a. This shall be accomplished each quarter by testing the chlorine residual, in the water.
i. The following areas shall be tested for free chlorine residual:
a. Pump house (entry point), male bathroom sink, and kitchen sink.
1. The free chlorine residual parameter shall be between 0.2 ppm and 0.4 ppm (or higher based on contractor recommendation)
2. The chlorine residual readings for each location shall be recorded in the Quarterly Report. Contractor shall complete one service & maintenance call per calendar quarter.
11.3.4. ADJUST CHEMICAL FEED PUMPS
a. The chemical feed pumps shall be adjusted in order to obtain water stabilization IAW the water parameters. Adjust the chemical feed pump for the Sodium Hypochlorite so that the parameter reading for the free chlorine residual is maintained as a minimum between 0.2 and 0.4 ppm (or higher based contractors recommendation) at the furthest point in the distribution system.
11.3.5. SODIUM HYPOCHLORITE
a. The contractor shall purchase only 12.5%, NSF® Certified Sodium Hypochlorite. The contractor shall dilute the concentrated sodium hypochlorite with water to achieve a minimum disinfectant free chlorine residual between 0.2 and 0.4 ppm (or higher based contractor’s recommendation) at the furthest point in the distribution system.
b. The chemical container…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.