Industry Q&A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_0001~_VA002_GROUNDS_MAINTENANCE_SITE_PLAN.PDF | ||
| W15QKN17Q1023_~_Grounds_Alexandra_VA_~_17_March_2017.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q1: Do we have to do weed control?
-The Government does not use roundup. The Contractor will be responsible for string trimming the crack in the sidewalk as indicated in CLINS 0002/1002/2002/3002/4002 and PWS
Paragraph 5.4.2.
Q2: Will we have to do leaf removal?
-The Government will take care of the leaf removal and fence line cleanup.
Q3: There is a mention of snow removal services on the FBO.Gov page (nothing in the SOW).
Will there a separate line item for this service or snow removal services is not a requirement?
-This requirement is only for grounds maintenance services. The FBO posting has been corrected.
Q4: Is there a contractor at this time that takes care of the leaf removal? I noticed along every fence line there were piled up leaves. Will we be responsible for the leaf removal/cleanup each spring before mowing/trimming services begin? Or will all of the fence lines be cleared before we start all mowing, trimming and edging services?
-The Government will take care of the leaf removal and fence line cleanup.
Q5: I noticed a lot of weeds and grass growing through the cracks in the sidewalk and in between the curb and sidewalk cracks. Is there a contractor that sprays Roundup on these cracks, to kill all of the weeds and grass? Or are we responsible for string trimming the cracks in the sidewalk?
-The Government does not use roundup. The Contractor will be responsible for string trimming the crack in the sidewalk as indicated in CLINS 0002/1002/2002/3002/4002 and PWS
Paragraph 5.4.2
Q6: What is the name of the current contractor for this contract?
- The current contractor is PLM Inc.
Q7: What is the current total annual awarded contract price for this contract?
- The total value of the current contract for the base period plus four option periods is
$17,633.30
Q8: What is the anticipated award date for this contract?
- The anticipated start date for this requirement is 29 April 2017
Q9: What is the anticipated start date for this contract?
- The anticipated start date for this requirement is 30 April 2017
Q10: Has funds been appropriated for this opportunity to include option years?
- Operations &Maintenance funds will be used to fund option years if the Government determines that there is a continued need for these services each fiscal year in accordance with
Federal Acquisition Regulation clause 52.217-9, Option to Extend the Term of the Contract.