Third_Questions_and_Answers_for_KEEP_16_Oct_2012.pdf

PDF 121 KB Posted

Attached to
PREFABRICATED AND PORTABLE BUILDINGS Federal contract opportunity
Solicitation number
W15QKN12R0070
Issued by
Department of the Army Materiel Command Contracting Command Picatinny Arsenal

View the file

Other files for this federal contract opportunity

Other files attached to PREFABRICATED AND PORTABLE BUILDINGS, newest first.
File Type Posted
W15QKN-12-R-0070 _Amendment_0006.pdf PDF
Tenth_Questions_and_Answers_KEEP_15_November.pdf PDF
9th_Q A_08_Nov_2012.pdf PDF
2004_MEW_S-1_General_Specification_4th_Ed.pdf PDF
Amendment_0005.pdf PDF
Seventh_Questions_for_KEEP_(2)_(4).pdf PDF
eighth_questions_and_answers_.pdf PDF
Performance_Risk_Assessment_Questionnaire_Deadline_Extension.pdf PDF
W15QKN-12-R-0070 _Amendment_0004.pdf PDF
KEEP_Performance_Work_Statement_(PWS)_Oct_25.pdf PDF
Sixth_Questions_and_Answers_for_KEEP_25_Oct_2012.pdf PDF
Fifth_Questions_and_Answers_KEEP_Oct_25.pdf PDF
Fourth_Questions_and_Answers_for_KEEP_23_Oct_2012.pdf PDF
W15QKN-12-R-0070 _Amendment_0003.pdf PDF
Second_Questions_and_Answers_for_KEEP_16_Oct_2012.pdf PDF
KEEPDeliveryOrder0001PWS.pdf PDF
Questions_and_Answers_for_KEEP_15_Oct_2012.pdf PDF
Performance_Risk_Assessment_Questionnaire.pdf PDF
W15QKN-12-R-0070 _Amendment_0002.pdf PDF
W15QKN-12-R-0070 _Amendment_0001.pdf PDF
Attachment0002NotionalSketch.pptx PPTX presentation
Attachment0004GeneralOrderNumber1B(GO-1B).pdf PDF
KEEPPerformanceWorkStatement(PWS).pdf PDF
ExhibitAStartWork.pdf PDF
ExhibitDShelterSpecs.pdf PDF
ExhibitCShelterGuide.pdf PDF
ExhibitBMonthlyStatus.pdf PDF
W15QKN-12-R-0070.pdf PDF
Attachment0003BSB-NSupporttoKEEPMemorandum.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Third Questions and Answers for KEEP 16 Oct 2012

1. Question: Below is section 3.3.5.2 Two-Story Shelters, in this section we did not see any requirement that the Two-story shelter (20’x 32’ per floor) be constructed as a stand-alone Two-story shelter 20’x

32’ Shelter. In addition, we didn’t see that requirement in any other section in the SOW. To the contrary, we see that the Two-story shelter 20’x 32’ Shelters must be in a “grouping of five shelters together side-by- side to form a replacement unit for existing American tents”.

As a result, we have the understanding that the SOW is asking for Two Story Shelters that are approximately 32’ by 100’ (which is 5 20’ by 32’ Shelter placed side-by-side). The Two Story 32’ by

100’ Shelters will have a single demising wall every 20’, thus separating each 20’ by 32’ space with a single wall not a double wall. Double walls between each 20’ by 32’ Shelter which would be required if the specification in the SOW required that the 5 Shelters placed side-by-side be stand-alone structures.

Is our understanding of the SOW correct?

Answer: No the understanding of the requirement is not correct. Please refer to the third sentence of Section 3.3.5.2 where it states “Two-story shelters will be approximately 20’x

32’ or 640 square feet in size per floor and contain a grouping of five shelters together side-by-side to form a replacement unit for existing American tents.” The question asked can be interpreted as a request for design approval. It is the offeror’s responsibility to develop an innovative design that answers the Performance Work Statement for this requirement.

File details come from the government source that posted it. Updated .